401 projects on file, including joint ventures this contractor is part of.
Total projects
401
Total budget
₱24B
Average progress
93.2%
Completion rate
77.3%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
20
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| Negros Island Region | 51 | ₱1.7B | 50.9 | 4 | 89.5% |
| Region VIII | 14 | ₱1.2B | 59.9 | 1 | 94.1% |
| Region IX | 9 | ₱848.5M | 67.2 | 2 | 91.3% |
| Region XIII | 3 | ₱312.7M | 48.3 | 0 | 100.0% |
| Region XII | 2 | ₱168.1M | 67.0 | 1 | 100.0% |
| Region X | 2 | ₱151M | 53.6 | 0 | 100.0% |
| Region V | 1 | ₱133.5M | 65.8 | 0 | 100.0% |
| Region VI | 1 | ₱195.5M | 65.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱10.8B | 50.8 | 0 | 94.3% |
| Flood Control and Drainage | 99 | ₱7.7B | 57.4 | 6 | 91.5% |
| Bridges | 43 | ₱2.3B | 52.0 | 2 | 92.5% |
| Buildings and Facilities | 17 | ₱573.6M | 48.5 | 0 | 98.5% |
| OTHER | 16 | ₱1.3B | 71.9 | 3 | 97.5% |
| GAA 2025 SSP | 7 | ₱360.8M | 92.5 | 5 | 77.7% |
| GAA 2025 OO-1 | 5 | ₱277.7M | 94.1 | 4 | 70.3% |
| GAA 2025 OO-2 | 2 | ₱243.4M | 93.8 | 0 | 92.3% |
| Bridges, Roads | 2 | ₱449.3M | 58.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
| 25HH0140OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0018+420-K0018+580, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48M | 94% | High risk94 | —-0.001 |
| 25HO0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (DOWNSTREAM), BADIAN | Region VII | Cebu 7th DEO | On-Going | ₱100.8M | 91% | High risk94 | —-0.009 |
| 25HF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTU | Region VII | Cebu 3rd DEO | On-Going | ₱142.6M | 93% | High risk94 | —-0.001 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 25HN0136SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.022 |
| 25HN0135SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.023 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 18I00026WIDENING OF PERMANENT BRIDGES - NALIWATAN BRIDGE (B00526LT) ALONG PALO-CARIGARA-ORMOC ROAD, KO947+408.00, TUNGA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱52M | 100% | High risk81 | —-0.018 |
| 18I00027WIDENING OF PERMANENT BRIDGES - NAUGUISAN BRIDGE (B00495LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO960+370, CARIGARA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱53.3M | 100% | High risk81 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 23HM0134CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 100% | High risk69 | Flagged0.040 |
| 23HM0131CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.4M | 100% | High risk69 | Flagged0.036 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 18J00010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE I) | Region IX | Region IX | On-Going | ₱141.2M | 61% | High risk76 | Flagged0.027 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 22J00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION (PACKAGE 1 & 2) | Region IX | Region IX | On-Going | ₱113.2M | 60% | High risk75 | Flagged0.011 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 24HN0033CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.9M | 100% | High risk74 | Flagged0.008 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 20HF0036A.ROAD CONCRETING, BRGY. LINGATONG, VITO, BALAMBAN, CEBUB.ROAD CONCRETING, BRGY. LUCA-MATUNOG, BALAMBAN, CEBUC.ROAD CONCRETING, BRGY. MABUNGAW-BIASONG, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.098 |
| 377 | 25HG0056SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, IMPROVEMENT OF INTERSECTION AT CEBU NORTH HAGNAYA WHARF RD - K0101+ 500, CITY OF BOGO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.093 |
| 378 | 18HD0018REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0087+280 - K0087+400, K0087+700 - K0087+840, CITY OF BOGO | Region VII | Cebu 4th DEO | Completed | ₱33.1M | 100% | Medium risk46 | —-0.095 |
| 379 | 20HN0023OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -TERTIARY ROADS - OPON-AIRPORT ROAD - (S00003LP) CHAINAGE 000 -CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱12.3M | 100% | Medium risk45 | —-0.097 |
| 380 | 18HJ0024CONSTRUCTION OF FLOOD CONTROL ALONG BATERIA RIVER (UPSTREAM/DOWNSTREAM), BRGY. POBLACION, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.053 |
| 381 | 20HJ0014CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG BATERIA RIVER GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.066 |
| 382 | 20HJ0103FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF FLOOD CONTROL ALONG BATERIA RIVER GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.065 |
| 383 | 18HJ0027BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES TIBYAWAN BR. (B00111NR) ALONG DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY), TAYASAN, NEGROS ORIENTAL 1ST LD | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱13.2M | 100% | Medium risk45 | —-0.059 |
| 384 | 23HJ0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD BRGY. TABON-GUBA ROAD LEADING TO BINAKAYAN CAVES, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.090 |
| 385 | 20HG0170CONCRETING OF BRGY. BUGAS TO BRGY. TIGBAO FMR, BRGY. BUGAS AND BRGY. TIGBAO, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱12.3M | 100% | Medium risk42 | —-0.041 |
| 386 | 18HE0115CONCRETING OF BRGY. CANTAO-AN - BRGY. PANGDAN FMR, BRGY. CANTAO-AN - BRGY. PANGDAN, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱6.6M | 100% | Medium risk42 | —-0.041 |
| 387 | 17HH0093CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT DON SERGIO OSMEÑA HIGH SCHOOL, BRGY. LABANGON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱20.2M | 100% | Medium risk40 | —-0.027 |
| 388 | 25ME0003ASPHALT OVERLAY ALONG SARANGANI - SULTAN KUDARAT COASTAL RD K1739+911 - K1742+665, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱108.1M | 100% | Medium risk39 | —-0.070 |
| 389 | 19HG0210CONCRETING OF BRGY. BUGAS - BRGY. TIGBAO FMR, BRGY. BUGAS AND BRGY. TIGBAO, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.7M | 100% | Medium risk38 | —-0.040 |
| 390 | 23HM0033001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0006+916 - K0007+000 | Negros Island Region | Siquijor DEO | On-Going | ₱2.2M | 80% | Medium risk33 | —-0.041 |
| 391 | 19HM0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, SANDUGAN BARANGAY ROAD LEADING TO VARIOUS BEACH RESORTS, SIQUIJOR, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱4.5M | 100% | Medium risk30 | —-0.088 |
| 392 | 16HH0087CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, DON LEON KILAT ST., CEBU CITY 1ST LD | Region VII | Cebu City DEO | Completed | ₱2.6M | 100% | Low risk29 | —-0.063 |
| 393 | 17HH0103ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY (S00031CB), K0010+130 - K0010+245, K0013+720 - K0013+825, K0013+920 - K0014+000, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱2.8M | 100% | Low risk29 | —-0.062 |
| 394 | 18HF0071CONCRETING OF ROAD IN BARANGAY SUNOG (MAGSAYSAY) (SITIO MAHAYAHAY), BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱4.7M | 100% | Low risk28 | —-0.097 |
| 395 | 21HG0103OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD. K0191+021.40 - K0191+175.40 | Region VII | Cebu 2nd DEO | Completed | ₱3.3M | 100% | Low risk26 | —-0.092 |
| 396 | 21HG0018LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF THE BATO ROAD AT BARANGAY BATO, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.096 |
| 397 | 21HG0016LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF THE BALHAAN - KANTALAHAN ROAD AT BARANGAY BALHAAN, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.095 |
| 398 | 18HJ0026ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- TERTIARY ROADS ALONG GUIHULNGAN-BALOC-ISABELA ROAD, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱4.7M | 100% | Low risk24 | —-0.089 |
| 399 | 25HF0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-ACCESS ROAD LEADING TO MT. MANUNGGAL, BRGY. SUNOG, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱4.7M | 100% | Low risk23 | —-0.098 |