Contractor dossier
401 projects on file, including joint ventures this contractor is part of.
Total projects
401
Total budget
₱24B
Average progress
93.2%
Completion rate
77.3%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
20
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| Negros Island Region | 51 | ₱1.7B | 50.9 | 4 | 89.5% |
| Region VIII | 14 | ₱1.2B | 59.9 | 1 | 94.1% |
| Region IX | 9 | ₱848.5M | 67.2 | 2 | 91.3% |
| Region XIII | 3 | ₱312.7M | 48.3 | 0 | 100.0% |
| Region XII | 2 | ₱168.1M | 67.0 | 1 | 100.0% |
| Region X | 2 | ₱151M | 53.6 | 0 | 100.0% |
| Region V | 1 | ₱133.5M | 65.8 | 0 | 100.0% |
| Region VI | 1 | ₱195.5M | 65.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱10.8B | 50.8 | 0 | 94.3% |
| Flood Control and Drainage | 99 | ₱7.7B | 57.4 | 6 | 91.5% |
| Bridges | 43 | ₱2.3B | 52.0 | 2 | 92.5% |
| Buildings and Facilities | 17 | ₱573.6M | 48.5 | 0 | 98.5% |
| OTHER | 16 | ₱1.3B | 71.9 | 3 | 97.5% |
| GAA 2025 SSP | 7 | ₱360.8M | 92.5 | 5 | 77.7% |
| GAA 2025 OO-1 | 5 | ₱277.7M | 94.1 | 4 | 70.3% |
| GAA 2025 OO-2 | 2 | ₱243.4M | 93.8 | 0 | 92.3% |
| Bridges, Roads | 2 | ₱449.3M | 58.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
| 25HH0140OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0018+420-K0018+580, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48M | 94% | High risk94 | —-0.001 |
| 25HO0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (DOWNSTREAM), BADIAN | Region VII | Cebu 7th DEO | On-Going | ₱100.8M | 91% | High risk94 | —-0.009 |
| 25HF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTU | Region VII | Cebu 3rd DEO | On-Going | ₱142.6M | 93% | High risk94 | —-0.001 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 25HN0136SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.022 |
| 25HN0135SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.023 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 18I00026WIDENING OF PERMANENT BRIDGES - NALIWATAN BRIDGE (B00526LT) ALONG PALO-CARIGARA-ORMOC ROAD, KO947+408.00, TUNGA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱52M | 100% | High risk81 | —-0.018 |
| 18I00027WIDENING OF PERMANENT BRIDGES - NAUGUISAN BRIDGE (B00495LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO960+370, CARIGARA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱53.3M | 100% | High risk81 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 23HM0134CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 100% | High risk69 | Flagged0.040 |
| 23HM0131CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.4M | 100% | High risk69 | Flagged0.036 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 18J00010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE I) | Region IX | Region IX | On-Going | ₱141.2M | 61% | High risk76 | Flagged0.027 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 22J00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION (PACKAGE 1 & 2) | Region IX | Region IX | On-Going | ₱113.2M | 60% | High risk75 | Flagged0.011 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 24HN0033CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.9M | 100% | High risk74 | Flagged0.008 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22JD0028PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-SERGIO OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD. K1857+(-1123)-K1857+251, K1858+000-K1858+895,K1859+000-K1861+645 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱82M | 100% | High risk62 | —-0.077 |
| 102 | 17HF0051ASPHALT OVERLAY OF CEBU-TOLEDO WHARF ROAD (JCT. NAGA-ULING RD), K0030+000 - K0031+080, BRGY. CANTABACO, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.8M | 100% | High risk62 | —-0.010 |
| 103 | 23H00019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD LEADING TO MT. MANUNGGAL, BRGY. SUNOG, BALAMBAN, CEBU | Region VII | Region VII | On-Going | ₱135.1M | 100% | High risk62 | —-0.033 |
| 104 | 21HN0089CSSP:CONST./IMPV'T. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECO.ZONE (ROADS LEVERAGING LINGKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-ELIAS ESPINA ST. CONNECTING HERNAN CORTES ST. IN SUPPORT TO STEEL INDUSTRY,BRGY. BANILAD,MANDAUE | Region VII | Cebu 6th DEO | Completed | ₱34.8M | 100% | High risk62 | —-0.030 |
| 105 | 23HD0097CONSTRUCTION OF SEVERO M. VERALLO PROVINICAL HOSPITAL COMPLEX (CEBU PROVINCIAL HOSPITAL), TAYTAYON, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱149.8M | 100% | High risk61 | —-0.017 |
| 106 | 23H00042CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BRGY. PATAO-BAOD-GUIWANON-BANTIGUE ROAD LEADING TO TOURIST DESTINATIONS, BANTAYAN, CE | Region VII | Region VII | Completed | ₱122.3M | 100% | High risk61 | —-0.078 |
| 107 | 25HO0138ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0189+000 - K0190+000 | Region VII | Cebu 7th DEO | On-Going | ₱94.5M | 10% | High risk61 | —-0.025 |
| 108 | 17HF0030CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CEBU-BALAMBAN TRANSCENTRAL HIGHWAY (S00266CB), K0038+737 - K0038+960, BRGY. CANSOMOROY, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱48.8M | 100% | High risk61 | —-0.063 |
| 109 | 22H00018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), BRGY. PATAO-KABAC-PUTIAN ROAD LEADING TO MADRIDEJOS BEACH RESORT KOTA PARK BANTAYAN ISLA | Region VII | Region VII | Completed | ₱120.6M | 100% | High risk61 | —-0.079 |
| 110 | 22H00005ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ALCOY- ALEGRIA ROAD, ALEGRIA, CEBU, STATION 15+240-STA.18+460, ALEGRIA, CEBU | Region VII | Region VII | Completed | ₱120.6M | 100% | High risk61 | —-0.074 |
| 111 | 22H00019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CONCRETING OF MADRIDEJOS-BANTAYAN ALETRNATE ROUTE LEADING TO TOURIST DESTINATIONS, BANTA | Region VII | Region VII | Completed | ₱120.6M | 100% | High risk61 | —-0.079 |
| 112 | 23HO0182ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0158 + 118 - K0158 + | Region VII | Cebu 7th DEO | Completed | ₱96M | 100% | High risk61 | —-0.082 |
| 113 | 23H00025CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ROAD CONCRETING FROM BRGY. PILI INTERIOR ROAD TO BRGY TUGAS LEADING TO KOTA PARK TOUR | Region VII | Region VII | Completed | ₱108.6M | 100% | High risk60 | —-0.080 |
| 114 | 22H00050ORGANIZATIONAL OUTCOME: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, TAPAL (CARCAR) ZARAGOSA-OLANGO-ALOGUINSAN RD-K0081+000-K008 | Region VII | Region VII | Completed | ₱96.5M | 100% | High risk60 | —-0.083 |
| 115 | 22H00022CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), ROAD CONCRETING FROM BRGY. PILI INTERIOR ROAD TO BRGY. TUGAS LEADING TO KOTA PARK TOURIS | Region VII | Region VII | Completed | ₱101.3M | 100% | High risk60 | —-0.082 |
| 116 | 22H00021CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BRGY. PATAO-BAOD-GUIWANON-BANTIGUE ROAD LEADING TO TOURIST DESTINATIONS, BANTAYAN, CE | Region VII | Region VII | Completed | ₱101.3M | 100% | High risk60 | —-0.080 |
| 117 | 24H00038CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF DAMAGED PAVED ROAD AT TALAYONG-TIGNAO ROAD, LAZI,SIQUIJOR | Region VII | Region VII | On-Going | ₱96.5M | 72% | High risk60 | —-0.040 |
| 118 | 23H00026CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BANTAYAN BAYWALK (SEAWALL) LEADING TO TOURIST DESTINATION, BANTAYAN ISLAND, CEBU | Region VII | Region VII | Completed | ₱101.3M | 100% | High risk60 | —-0.082 |
| 119 | 23H00027CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONST./ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), BANTAYAN BAYWALK (SEAWALL) LEADING TO TOURIST DESTINATION, BANTAYAN ISLAND,CEBU, PACKAGE II | Region VII | Region VII | Completed | ₱101.3M | 100% | High risk60 | —-0.082 |
| 120 | 23HO0181ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0157 + 900 - K0158 + 1 | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.082 |
| 121 | 22H00020CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), SANTA FE-BANTAYAN PROVINCIAL ROAD LEADING TO TOURIST DESTINATIONS, BANTAYAN ISLAND, C | Region VII | Region VII | Completed | ₱115.8M | 100% | Medium risk60 | —-0.081 |
| 122 | 22H00023CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), BANTAYAN BAYWALK (SEAWALL) LEADING TO TOURIST DESTINATION, BANTAYAN ISLAND, CEBU | Region VII | Region VII | Completed | ₱101.3M | 100% | Medium risk60 | —-0.082 |
| 123 | 21H00016CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), SANTA FE-MADRIDEJOS BEACH RESORTS, MADRIDEJOS, CEBU, SECTION 1: STA.00+000.00-STA.02+233 | Region VII | Region VII | Completed | ₱103.7M | 100% | Medium risk60 | —-0.082 |
| 124 | 25RE0006PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT NATL RD SAGAY-BATO-DIAN-AY-MARCELO-BALEA JCT RD (S00426NR) - K0103 + 083 - K0104 + 000, K0112 + 000 - K0114 + 000, K0121 + 435 - K0122 + 106 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱96.3M | 19% | Medium risk60 | —-0.034 |
| 125 | 25H00091CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY TO-ONG PARDO, CEBU CITY | Region VII | Region VII | On-Going | ₱99.2M | 0% | Medium risk60 | —-0.023 |