Contractor dossier
401 projects on file, including joint ventures this contractor is part of.
Total projects
401
Total budget
₱24B
Average progress
93.2%
Completion rate
77.3%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
20
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| Negros Island Region | 51 | ₱1.7B | 50.9 | 4 | 89.5% |
| Region VIII | 14 | ₱1.2B | 59.9 | 1 | 94.1% |
| Region IX | 9 | ₱848.5M | 67.2 | 2 | 91.3% |
| Region XIII | 3 | ₱312.7M | 48.3 | 0 | 100.0% |
| Region XII | 2 | ₱168.1M | 67.0 | 1 | 100.0% |
| Region X | 2 | ₱151M | 53.6 | 0 | 100.0% |
| Region V | 1 | ₱133.5M | 65.8 | 0 | 100.0% |
| Region VI | 1 | ₱195.5M | 65.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱10.8B | 50.8 | 0 | 94.3% |
| Flood Control and Drainage | 99 | ₱7.7B | 57.4 | 6 | 91.5% |
| Bridges | 43 | ₱2.3B | 52.0 | 2 | 92.5% |
| Buildings and Facilities | 17 | ₱573.6M | 48.5 | 0 | 98.5% |
| OTHER | 16 | ₱1.3B | 71.9 | 3 | 97.5% |
| GAA 2025 SSP | 7 | ₱360.8M | 92.5 | 5 | 77.7% |
| GAA 2025 OO-1 | 5 | ₱277.7M | 94.1 | 4 | 70.3% |
| GAA 2025 OO-2 | 2 | ₱243.4M | 93.8 | 0 | 92.3% |
| Bridges, Roads | 2 | ₱449.3M | 58.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
| 25HH0140OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0018+420-K0018+580, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48M | 94% | High risk94 | —-0.001 |
| 25HO0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (DOWNSTREAM), BADIAN | Region VII | Cebu 7th DEO | On-Going | ₱100.8M | 91% | High risk94 | —-0.009 |
| 25HF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTU | Region VII | Cebu 3rd DEO | On-Going | ₱142.6M | 93% | High risk94 | —-0.001 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 25HN0136SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.022 |
| 25HN0135SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.023 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 18I00026WIDENING OF PERMANENT BRIDGES - NALIWATAN BRIDGE (B00526LT) ALONG PALO-CARIGARA-ORMOC ROAD, KO947+408.00, TUNGA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱52M | 100% | High risk81 | —-0.018 |
| 18I00027WIDENING OF PERMANENT BRIDGES - NAUGUISAN BRIDGE (B00495LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO960+370, CARIGARA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱53.3M | 100% | High risk81 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 23HM0134CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 100% | High risk69 | Flagged0.040 |
| 23HM0131CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.4M | 100% | High risk69 | Flagged0.036 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 18J00010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE I) | Region IX | Region IX | On-Going | ₱141.2M | 61% | High risk76 | Flagged0.027 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 22J00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION (PACKAGE 1 & 2) | Region IX | Region IX | On-Going | ₱113.2M | 60% | High risk75 | Flagged0.011 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 24HN0033CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.9M | 100% | High risk74 | Flagged0.008 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23HF0032CONSTRUCTION/ IMPROVEMENT OF BRGY. ROAD FROM SITIO MANGA, SUNOG TO BRGY. MATUN-OG FOR THE ABACA INDUSTRY, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.079 |
| 127 | 22H00007ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0029 + 200 - K | Region VII | Region VII | Completed | ₱96.5M | 100% | Medium risk60 | —-0.084 |
| 128 | 25HI0013OO1: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0064 + 000 - K0064 + 240 | Region VII | Cebu 5th DEO | On-Going | ₱96.1M | 49% | Medium risk59 | —-0.041 |
| 129 | 20HF0063CONSTRUCTION OF LOCAL ROADS, LUCA-CABASIANGAN, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱99M | 100% | Medium risk59 | —-0.078 |
| 130 | 23HF0028CONSTRUCTION/ IMPROVEMENT OF ALEGRIA-BANGKITO ROAD LEADING TO KABANGKALAN COFFEE PLANTATION, BRGY. ALEGRIA-BANGKITO, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.082 |
| 131 | 23HB0163REHABILITATION/RECONSTRUCTION OF MADUA RIVER CONTROL, DUERO, BOHOL STA.0+000.00 - STA. 0+500.00 | Region VII | Bohol 3rd DEO | Completed | ₱96.3M | 100% | Medium risk59 | —-0.066 |
| 132 | 19HD0018ROAD WIDENING ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0106+400-K0107+000, K0112+600-K0113+421, K0123+520-K0124+000, K0124+761-K0126+000, K0134+391-K0135+000, MEDELLIN AND DAANBANTAYAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.085 |
| 133 | 19HD0014ROAD WIDENING ALONG CEBU NORTH HAGNAYA WHARF ROAD, K0094+500-K0097+852, CITY OF BOGO | Region VII | Cebu 4th DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.083 |
| 134 | 24HD0087CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PHASE II, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱59.2M | 95% | Medium risk58 | —-0.043 |
| 135 | 23HB0164REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE AT LIMOCON, VALENCIA, BOHOL, STA. 0+000.00 - STA.0+102.00 | Region VII | Bohol 3rd DEO | Completed | ₱96.3M | 100% | Medium risk58 | —-0.082 |
| 136 | 18K00321IMPLEMENTATION & MONITORING OF PAMANA PROJECT, CONC. OF LIANGAN-CAMP 1 (MAHAYAHAY), LANAO DEL NORTE | Region X | Region X | Completed | ₱103.2M | 100% | Medium risk58 | —-0.019 |
| 137 | 16HD0090REHB/RECON/UPGRDG OF DAMAGED PAVED NATL RD INCL DRNAGE BASED ON PMS/HDM-4 ALONG SOGOD-TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱36.9M | 100% | Medium risk57 | —-0.063 |
| 138 | 23HO0167ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, ARGAO-RONDA RD - K0080 + 800 - K0081 + 000 | Region VII | Cebu 7th DEO | Completed | ₱90.2M | 100% | Medium risk57 | —-0.086 |
| 139 | 17HD0032OFF-CARRIAGEWAY IMPVT INCL DRNG ALONG SOGOD-TBLN RD, K0114+621-K0114+753 & 1-OTHER, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱43.1M | 100% | Medium risk57 | —-0.064 |
| 140 | 16HN0096PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS- CEBU NORTH HAGNAYA WHARF ROAD (S00286CB), K0008+358-K0008+953, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱17.4M | 100% | Medium risk56 | —-0.065 |
| 141 | 18JB0017REPLACEMENT OF BARRA BRIDGE 1 ALONG BARRA-MINAOG ROAD LEADING TO DIPOLOG CITY AIRPORT, DIPOLOG CITY, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱48.5M | 100% | Medium risk56 | —-0.031 |
| 142 | 21HH0118OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH DESILTING ALONG TAGUNOL CREEK BRGY. BASAK SAN N | Region VII | Cebu City DEO | Completed | ₱91.2M | 100% | Medium risk56 | —-0.069 |
| 143 | 18H00031ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROADS SYSTEM, BRIDGE PROGRAM WIDENING OF PERMANENT BRIDGES POBLACION TABUELAN BR. (B00014CB) ALONG ANTONIO Y DE PIO H-WAY INCL. ROW | Region VII | Region VII | Completed | ₱74.5M | 100% | Medium risk55 | —-0.023 |
| 144 | 23HD0030REPLACEMENT OF PERMANENT WEAK BRIDGES, POBLACION TABUELAN BR. (B00014CB) ALONG ANTONIO Y DE PIO H-WAY, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱71.2M | 100% | Medium risk55 | —-0.049 |
| 145 | 25HN0015OO2: FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER (UPSTREAM), PACKAGE 1, BARANGAY PAKNA-AN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱72M | 72% | Medium risk55 | —-0.028 |
| 146 | 18HD0027WIDENING OF PERMANENT BRIDGES; TAMBONGON BRIDGE (B00018CB) ALONG ANTONIO Y DE PIO H-WAY, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱80.7M | 100% | Medium risk55 | —-0.045 |
| 147 | 18HD0027WIDENING OF PERMANENT BRIDGES; TAMBONGON BRIDGE (B00018CB) ALONG ANTONIO Y DE PIO H-WAY, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱80.7M | 100% | Medium risk55 | —-0.045 |
| 148 | 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 149 | 20HH0136LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY LABANGON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱48M | 100% | Medium risk54 | —-0.078 |
| 150 | 23HO0239REPAIR/REHABILITATION/RECONSTRUCTION OF DAMAGED MATUTINAO RIVER FLOOD CONTROL SYSTEM (UPSTREAM-SECTION 2), BADIAN, CEBU, STA. 0+000.00 TO STA. 0+207.00 | Region VII | Cebu 7th DEO | Completed | ₱81.4M | 100% | Medium risk54 | —-0.069 |