Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱1.6B
Average progress
98.4%
Completion rate
95.9%
Average risk score
48.7
Medium risk on average, out of 100
Flagged as unusual
1
1.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 64 | ₱1.5B | 47.4 | 0 | 99.7% |
| Region V | 9 | ₱122.3M | 57.6 | 1 | 89.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 54 | ₱1.1B | 47.1 | 0 | 100.0% |
| Roads | 18 | ₱427.3M | 52.0 | 0 | 93.7% |
| OTHER | 1 | ₱8.3M | 76.0 | 1 | 97.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 20FJ0019NETWORK DEVT.-ROAD WIDENING - SEC. ROADS, MAS-CAT-PLA RD.,K0043+591-K0043+801 | Region V | Masbate 3rd DEO | On-Going | ₱8.3M | 98% | High risk76 | Flagged0.016 |
| 2 | 19FJ0035NATIONAL ROADS AND BRIDGES- NATIONAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, PREVENTIVE MAINTENANCE ROAD- REHABILITATION/ IMPROVEMENT OF MASBATE-CATAINGAN-PLACER ROAD,K0049+500-K0053+100 | Region V | Masbate 3rd DEO | Completed | ₱46.9M | 100% | Medium risk59 | —-0.096 |
| 3 | 21FJ0006OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, PREVENTIVE MAINTENANCE OF ROAD : ASPHALT OVERLAY-BUENAVISTA-KAWAYAN RD-K0052+000 - K0053+500 | Region V | Masbate 3rd DEO | Completed | ₱21.2M | 100% | Medium risk58 | —-0.096 |
| 4 | 19FI0039ROAD WIDENING - ALONG CAPITOL - CADRE RD (S00002MT) K0000+000 TO K0000+132, NET LENGTH=0.264 LANE KM (0.132 KM), MASBATE CITY | Region V | Masbate 2nd DEO | Completed | ₱8M | 100% | Medium risk57 | —-0.099 |
| 5 | 22FJ0043ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS- BUENAVISTA- KAWAYAN RD- K0062+070- K0062+640 | Region V | Masbate 3rd DEO | On-Going | ₱8M | 3% | Medium risk57 | —-0.019 |
| 6 | 21FJ0007OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-BUENAVISTA-KAWAYAN RD-K0058+449 - K0059+400 | Region V | Masbate 3rd DEO | Completed | ₱13.6M | 100% | Medium risk57 | —-0.096 |
| 7 | 21FJ0009OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- BUENAVISTA-KAWAYAN RD-K0062+070 - K00062+640 | Region V | Masbate 3rd DEO | Completed | ₱8M | 100% | Medium risk57 | —-0.093 |
| 8 | 20FJ0017PREV. MAINT. - SECONDARY ROADS BUENAVISTA KAWAYAN ROAD | Region V | Masbate 3rd DEO | Completed | ₱4.7M | 100% | Medium risk56 | —-0.100 |
| 9 | 22IA0031REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS -BILIRAN CIRCUMFERENTIAL RD- K1047+050 - K1047+750 | Region VIII | Biliran DEO | On-Going | ₱48.7M | 83% | Medium risk54 | —-0.030 |
| 10 | 21IA0131REHABILITATION OF RIVER CONTROL PROTECTION BRGY. P.S. EAMIGUEL, NAVAL (124.432251°, 11.591292° - 124.431419°, 11.591287°) | Region VIII | Biliran DEO | Completed | ₱30.6M | 100% | Medium risk51 | —-0.028 |
| 11 | 19IA0122RECONSTRUCTION/REHABILITATION OF FLOOD CONTROL, BRGY. BUSALI, BILIRAN | Region VIII | Biliran DEO | Completed | ₱31.1M | 100% | Medium risk51 | —-0.028 |
| 12 | 21IA0123REPAIR OF SEAWALL PROTECTION AT BRGY. BUSALI, BILIRAN 1ST LOC. (11.485544, 124.446276 TO 11.489002, 124.441717) 2ND LOC. (11.490969, 124.441043 TO 11.48937, 124.441831) | Region VIII | Biliran DEO | Completed | ₱36.1M | 100% | Medium risk51 | —-0.028 |
| 13 | 19IA0120RECONSTRUCTION/REHABILITATION OF FLOOD CONTROL, BRGY. PINANGOMHAN | Region VIII | Biliran DEO | Completed | ₱27.2M | 100% | Medium risk51 | —-0.028 |
| 14 | 19IA0121RECONSTRUCTION/REHABILITATION OF FLOOD CONTROL, BRGY. SAN ROQUE, BILIRAN | Region VIII | Biliran DEO | Completed | ₱27.3M | 100% | Medium risk51 | —-0.028 |
| 15 | 21IA0122REHABILITATION OF SHORELINE PROTECTION AT SITIO KATIPUNAN, BRGY. VICTORY, CAIBIRAN (11.581892, 124.580294 TO 11.575431, 124.581414) | Region VIII | Biliran DEO | Completed | ₱37.4M | 100% | Medium risk50 | —-0.028 |
| 16 | 19IA0128REPAIR/REHABILITATION OF FLOOD CONTROL IN CABUCGAYAN RIVER, CABUCGAYAN, BILIRAN | Region VIII | Biliran DEO | Completed | ₱30.5M | 100% | Medium risk50 | —-0.028 |
| 17 | 19IA0039REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE BILIRAN CIRCUMFERENTIAL ROAD, K1030+109 - K1030+132, K1036+520-K1037+178, NAVAL, BILIRAN PROVINCE AND ALMERIA, BILIRAN PROVINCE | Region VIII | Biliran DEO | Completed | ₱44.9M | 100% | Medium risk50 | —-0.096 |
| 18 | 18IA0018CONST. OF DRAINAGE STRUCTURE ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, K1027+361-K1027+660, K1027+788-K1027+890, K1028+770-K1029+740, K1030+311-K1030+920, K1030+150-K1030+750, K1030+930-K1031+630 TO INCLUDE PAYMENT FOR ROAD ROW, NAVAL, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱44.9M | 100% | Medium risk50 | —-0.095 |
| 19 | 20IA0051REHABILITATION OF TUCDAO FLOOD CONTROL, PHASE 1 ALONG BILIRAN CIR. ROAD | Region VIII | Biliran DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.083 |
| 20 | 20IA0013ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BILIRAN CIRCUMFERENTIAL ROAD, K1075+235-K1075+341, K1075+610 - K1075+807, K1076+020 - K1076+345 | Region VIII | Biliran DEO | Completed | ₱35.7M | 100% | Medium risk49 | —-0.094 |
| 21 | 19IA0040REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -BILIRAN CIRCUMFERENTIAL ROAD K1104+500 - K1104+944 | Region VIII | Biliran DEO | Completed | ₱42.4M | 100% | Medium risk49 | —-0.095 |
| 22 | 24IE0001NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS-LEMON-LEYTE-BILIRAN RD, K0980+250-K0981+056, LEYTE, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱42.4M | 100% | Medium risk49 | —-0.096 |
| 23 | 18I00064CONSTRUCTION OF FLOOD CONTROL ALONG POBLACION KANANGA - KANAWAGAN RIVER FLOOD CONTROL AND PROTECTION WORK, KANANGA, LEYTE, LEYTE 4TH LD | Region VIII | Region VIII | Completed | ₱48.2M | 100% | Medium risk49 | —-0.081 |
| 24 | 18IA0023CONST./IMPR. OF ACCESS ROAD LEADING TO TOURISM DESTINATION, ACCESS ROAD LEADING TO TINAGO FALLS (11.5809, 124.5314 - 11.5829, 124.5626), PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱27.7M | 100% | Medium risk49 | —-0.094 |
| 25 | 18IE0022ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, SAN ISIDRO-DAJA RD. S00078LT, K1020+780 - K1020+942, K1020+974 - K1021+125,SAN ISIDRO, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱8.3M | 100% | Medium risk49 | —-0.096 |