Contractor dossier
221 projects on file, including joint ventures this contractor is part of.
Total projects
221
Total budget
₱9.4B
Average progress
93.2%
Completion rate
80.5%
Average risk score
43.3
Medium risk on average, out of 100
Flagged as unusual
9
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 88 | ₱1.4B | 41.0 | 0 | 95.1% |
| Region III | 66 | ₱2B | 34.6 | 2 | 96.0% |
| Region IV-A | 26 | ₱1.4B | 50.0 | 0 | 90.8% |
| Region IV-B | 17 | ₱2.7B | 59.1 | 3 | 88.1% |
| Region XI | 9 | ₱338.5M | 47.5 | 0 | 100.0% |
| Region I | 5 | ₱432.6M | 61.5 | 0 | 100.0% |
| Region VIII | 4 | ₱726M | 70.3 | 2 | 74.8% |
| Region VI | 4 | ₱378.6M | 66.0 | 2 | 30.3% |
| Negros Island Region | 2 | ₱90.2M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 84 | ₱1B | 36.9 | 2 | 94.5% |
| Flood Control and Drainage | 70 | ₱6.3B | 55.0 | 5 | 88.6% |
| Roads | 61 | ₱1.8B | 38.0 | 1 | 96.4% |
| OTHER | 2 | ₱116.2M | 73.3 | 1 | 85.5% |
| Bridges | 2 | ₱28.2M | 31.0 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱108.6M | 61.6 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 24CL0048CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.7M | 90% | High risk82 | —-0.009 |
| 24CL0046CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 91% | High risk81 | —-0.009 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
| 24CC0024CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE III) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0326CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 25CC0083CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA ANA, BULACAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱38.6M | 48% | High risk75 | —-0.025 |
| 23AA0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PRINCIPAL RIVER (BISLAK RIVER), BARANGAY TAMBIDAO-ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.2M | 100% | High risk71 | —-0.020 |
| 23A00308BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, PIDDIG - CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO - CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 4) | Region I | Region I | Completed | ₱99M | 100% | High risk69 | —-0.067 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24I00052CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱177.9M | 82% | High risk68 | —-0.007 |
| 25E00138CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.1M | 90% | High risk68 | —-0.012 |
| 23E00151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SHORE PROTECTION STRUCTURE AND COASTAL DEVELOPMENT ALONG BRGY. MULAWIN,STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 25OG0027REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱145.5M | 15% | High risk67 | —-0.014 |
| 25E00151BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱247.5M | 93% | High risk67 | —-0.010 |
| 25E00150BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY | Region IV-B | Region IV-B | On-Going | ₱247.5M | 94% | High risk67 | —-0.010 |
| 25E00147FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱229.8M | 88% | High risk67 | —-0.011 |
| 24E00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱236.4M | 100% | High risk67 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 24E00279CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱11.7M | 0% | Medium risk37 | Flagged0.021 |
| 23G00051REHABILITATION OF MANSAYA CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱101.3M | 0% | High risk64 | Flagged0.018 |
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24E00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ARACELI SUPER HEALTH CENTER, ARACELI, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱11.7M | 64% | Medium risk34 | Flagged0.011 |
| 24I00023NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱271.5M | 46% | High risk65 | Flagged0.004 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21OB0150CONSTRUCTION OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BARANGAY UPPER BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.094 |
| 77 | 22OH0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. 867,PANDACAN, MANILA | National Capital Region | South Manila DEO | Completed | ₱9.8M | 100% | Medium risk48 | —-0.103 |
| 78 | 22OB0031CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING AT BRGY. BARANGKA ILAYA, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.094 |
| 79 | 20OB0259CONSTRUCTION OF MULTI-PURPOSE BUILDING AT ILAYA BARANGKA INTEGRATED SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.102 |
| 80 | 20OB0258CONSTRUCTION OF MULTI-PURPOSE BUILDING AT HULO INTEGRATED SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.103 |
| 81 | 20OB0445RETROFITTING OF GOVERNMENT BUILDINGS IN PREPARATION FOR THE BIG ONE -VICENTE P. EUSEBIO BUILDING II, CANIOGAN ELEMENTARY SCHOOL, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱10.3M | 100% | Medium risk48 | —-0.103 |
| 82 | 20OB0038CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY VERGARA INCLUDING COMPLETION OF FACILITIES, -PACKAGE 2 MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱11.7M | 100% | Medium risk48 | —-0.104 |
| 83 | 20OB0193CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. SUMILANG, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱13.1M | 100% | Medium risk48 | —-0.104 |
| 84 | 20OB0194CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY STO. TOMAS, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱10.5M | 100% | Medium risk48 | —-0.104 |
| 85 | 22OB0261CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING AT JOSE FABELLA MEMORIAL SCHOOL INCLUDING UPGRADING OF ELECTRICAL FACILITIES, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.3M | 100% | Medium risk48 | —-0.102 |
| 86 | 22OB0267CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING AT MANDALUYONG HIGH SCHOOL INCLUDING UPGRADING OF ELECTRICAL FACILITIES, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.3M | 100% | Medium risk48 | —-0.103 |
| 87 | 21OH0121LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-REPAIR/REHABILITATION OF COVERED COURT, BRGY. 903, ZONE 100, PUNTA, STA. ANA, MANILA | National Capital Region | South Manila DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.104 |
| 88 | 19OH0175LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CON | National Capital Region | South Manila DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.100 |
| 89 | 21OB0222CONSTRUCTION/REHABILITATION OF CAMACHO MULTI-PURPOSE MULTI-PURPOSE BUILDING BUILDING, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.097 |
| 90 | 22OH0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM-REHABILITATION OF SILAHIS NG KATARUNGAN ELEMENTARY SCHOOL, PACO, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.102 |
| 91 | 20OB0410CONSTRUCTION (COMPLETION) OF BARANGAY CONCEPCION UNO MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT BRGY. CONCEPCION UNO, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱6.7M | 100% | Medium risk48 | —-0.098 |
| 92 | 23OB0289CONSTRUCTION OF MULTI PURPOSE BUILDING (CISTERN) AT ILAYA BARANGKA INTEGRATED SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.103 |
| 93 | 21OB0229CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING AT BARANGAY BARANGKA ILAYA, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.104 |
| 94 | 20OB0192CONSTRUCTION OF MULTI-PURPOSE BUILDING AT VILLA GLORIA HOA, BRGY. PINAGBUHATAN, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱7M | 100% | Medium risk48 | —-0.103 |
| 95 | 22OB0274CONSTRUCTION (COMPLETION) OF MULTIPURPOSE BUILDING AT ILAYA BARANGKA INTEGRATED SCHOOL INCLUDING UPGRADING OF ELECTRICAL FACILITIES, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱7.6M | 100% | Medium risk47 | —-0.102 |
| 96 | 20OB0278CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY VERGARA, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱7.6M | 100% | Medium risk47 | —-0.103 |
| 97 | 20OB0271CONSTRUCTION OF MULTI-PURPOSE BUILDING AT RENATO LOPEZ ELEMENTARY SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.103 |
| 98 | 21OB0223CONSTRUCTION/REHABILITATION OF NANGKA MULTI-PURPOSE BUILDING, BARANGAY NANGKA, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.098 |
| 99 | 20OH0044LOCAL INFRASTRUCTURE PROGRAM-BLDGS & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF MULTI-PURPO | National Capital Region | South Manila DEO | Completed | ₱5.8M | 100% | Medium risk47 | —-0.103 |
| 100 | 19OG0152CONSTRUCTION OF MPB (AFP EP TRANSIENT FACILITY), CAMP GENERAL EMILIO AGUINALDO, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.101 |