Contractor dossier
221 projects on file, including joint ventures this contractor is part of.
Total projects
221
Total budget
₱9.4B
Average progress
93.2%
Completion rate
80.5%
Average risk score
43.3
Medium risk on average, out of 100
Flagged as unusual
9
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 88 | ₱1.4B | 41.0 | 0 | 95.1% |
| Region III | 66 | ₱2B | 34.6 | 2 | 96.0% |
| Region IV-A | 26 | ₱1.4B | 50.0 | 0 | 90.8% |
| Region IV-B | 17 | ₱2.7B | 59.1 | 3 | 88.1% |
| Region XI | 9 | ₱338.5M | 47.5 | 0 | 100.0% |
| Region I | 5 | ₱432.6M | 61.5 | 0 | 100.0% |
| Region VIII | 4 | ₱726M | 70.3 | 2 | 74.8% |
| Region VI | 4 | ₱378.6M | 66.0 | 2 | 30.3% |
| Negros Island Region | 2 | ₱90.2M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 84 | ₱1B | 36.9 | 2 | 94.5% |
| Flood Control and Drainage | 70 | ₱6.3B | 55.0 | 5 | 88.6% |
| Roads | 61 | ₱1.8B | 38.0 | 1 | 96.4% |
| OTHER | 2 | ₱116.2M | 73.3 | 1 | 85.5% |
| Bridges | 2 | ₱28.2M | 31.0 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱108.6M | 61.6 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 24CL0048CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.7M | 90% | High risk82 | —-0.009 |
| 24CL0046CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 91% | High risk81 | —-0.009 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
| 24CC0024CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE III) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0326CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 25CC0083CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA ANA, BULACAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱38.6M | 48% | High risk75 | —-0.025 |
| 23AA0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PRINCIPAL RIVER (BISLAK RIVER), BARANGAY TAMBIDAO-ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.2M | 100% | High risk71 | —-0.020 |
| 23A00308BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, PIDDIG - CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO - CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 4) | Region I | Region I | Completed | ₱99M | 100% | High risk69 | —-0.067 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24I00052CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱177.9M | 82% | High risk68 | —-0.007 |
| 25E00138CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.1M | 90% | High risk68 | —-0.012 |
| 23E00151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SHORE PROTECTION STRUCTURE AND COASTAL DEVELOPMENT ALONG BRGY. MULAWIN,STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 25OG0027REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱145.5M | 15% | High risk67 | —-0.014 |
| 25E00151BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱247.5M | 93% | High risk67 | —-0.010 |
| 25E00150BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY | Region IV-B | Region IV-B | On-Going | ₱247.5M | 94% | High risk67 | —-0.010 |
| 25E00147FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱229.8M | 88% | High risk67 | —-0.011 |
| 24E00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱236.4M | 100% | High risk67 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 24E00279CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱11.7M | 0% | Medium risk37 | Flagged0.021 |
| 23G00051REHABILITATION OF MANSAYA CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱101.3M | 0% | High risk64 | Flagged0.018 |
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24E00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ARACELI SUPER HEALTH CENTER, ARACELI, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱11.7M | 64% | Medium risk34 | Flagged0.011 |
| 24I00023NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱271.5M | 46% | High risk65 | Flagged0.004 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21OD0034IMPROVEMENT OF FLOOD CONTROL WALL ALONG MARULAS - GEN. T. DE LEON CREEK (PHASE 2), BARANGAY MARULAS, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.087 |
| 127 | 21OD0006CONSTRUCTION/ REHABILITATION OF ROADS AND DRAINAGE AT PUROK 4, BRGY. MAPULANG LUPA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.098 |
| 128 | 21OD0007CONSTRUCTION/ REHABILITATION OF ROADS AND DRAINAGE ALONG ZARAH ST., BRGY. MAPULANG LUPA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.099 |
| 129 | 20OH0007OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- | National Capital Region | South Manila DEO | Completed | ₱7.5M | 100% | Medium risk46 | —-0.099 |
| 130 | 20OH0118LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL | National Capital Region | South Manila DEO | Completed | ₱5.8M | 100% | Medium risk46 | —-0.099 |
| 131 | 24HL0011ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF LICOLICO RIVER CONTROL ALONG UPSTREAM BSIATON, NE | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.067 |
| 132 | 22OH0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHAB. OF ROAD INCLUDING DRAINAGE SYSTEM ALONG BRGY. 193, ZONE 20 AND IT | National Capital Region | South Manila DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.099 |
| 133 | 19OG0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, UP DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱4.7M | 100% | Medium risk46 | —-0.098 |
| 134 | 20OB0238CONSTRUCTION (COMPLETION) OF 4-STOREY MULTI-PURPOSE BUILDING (MIDDLE), BRGY. HAGDAN BATO ITAAS INCLUDING SITE DEVELOPMENT, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.7M | 100% | Medium risk45 | —-0.097 |
| 135 | 21OC0177CONSTRUCTION/COMPLETION OF 4STY8CL, PARAÑAQUE SCIENCE HS, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱20M | 100% | Medium risk45 | —-0.049 |
| 136 | 19OG0131COMPLETION OF FOUR (4)-STOREY DENR-NCR OFFICE BUILDING WITH ROOF DECK (PHASE 2) WITHIN THE NATIONAL ECOLOGY CENTER, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱14.5M | 100% | Medium risk45 | —-0.047 |
| 137 | 20OB0241CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (NATIONAL CENTER FOR MENTAL HEALTH) AT BARANGAY MAUWAY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.7M | 100% | Medium risk45 | —-0.103 |
| 138 | 20DO0090PUBLIC MARKETS/FARMERS MARKETS (BAGSAKAN CENTERS) AND PUBLIC CEMETERIES PROJECTS-REHABILITATION OF TANAY MUNICIPAL CEMETERY, PLAZA ALDEA, AND TANDANG KUTYO, TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱5.5M | 100% | Medium risk44 | —-0.056 |
| 139 | 21LE0180CONCRETING OF BRGY. CULAMAN FMR, BRGY. CULAMAN, JOSE ABAD SANTOS, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.026 |
| 140 | 21LE0173CONCRETING OF BRGY. LAGUMIT FMR PHASE II, BRGY. LAGUMIT, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.030 |
| 141 | 23C00339BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOC IAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, ANYATAM ELEMENTARY SCHOOL, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱48.8M | 100% | Medium risk40 | —-0.098 |
| 142 | 23EB0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PATRICK RIVER, BARANGAY PAETAN SECTION, STA. 0+000 - STA. 0+394, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱45.1M | 100% | Medium risk39 | —-0.073 |
| 143 | 24E00279CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱11.7M | 0% | Medium risk37 | Flagged0.021 |
| 144 | 24CD0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GAYA-GAYA, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk37 | —-0.093 |
| 145 | 21CC0278REPLACEMNET OF PULO BRIDGE, BAMBANG, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.5M | 100% | Medium risk36 | —-0.067 |
| 146 | 20CD0031CONSTRUCTION OF ADDITIONAL ADMINISTRATIVE/BATTALION LIAISON OFFICE BUILDING, CAMP TECSON, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk35 | —-0.104 |
| 147 | 20CD0079CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱5.6M | 100% | Medium risk35 | —-0.108 |
| 148 | 20CC0285CONSTRUCTION OF BYPASS ROADS LEADING TO ECONOMIC ZONE TABE, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.1M | 100% | Medium risk35 | —-0.037 |
| 149 | 23CC0256CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY HINUKAY, BALIUAG, BULACAN (K004+530 TO K004+830), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.088 |
| 150 | 23CC0253CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY TANGOS, BALIUAG, BULACAN (K003+200 TO K003+500), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.089 |