Contractor dossier
221 projects on file, including joint ventures this contractor is part of.
Total projects
221
Total budget
₱9.4B
Average progress
93.2%
Completion rate
80.5%
Average risk score
43.3
Medium risk on average, out of 100
Flagged as unusual
9
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 88 | ₱1.4B | 41.0 | 0 | 95.1% |
| Region III | 66 | ₱2B | 34.6 | 2 | 96.0% |
| Region IV-A | 26 | ₱1.4B | 50.0 | 0 | 90.8% |
| Region IV-B | 17 | ₱2.7B | 59.1 | 3 | 88.1% |
| Region XI | 9 | ₱338.5M | 47.5 | 0 | 100.0% |
| Region I | 5 | ₱432.6M | 61.5 | 0 | 100.0% |
| Region VIII | 4 | ₱726M | 70.3 | 2 | 74.8% |
| Region VI | 4 | ₱378.6M | 66.0 | 2 | 30.3% |
| Negros Island Region | 2 | ₱90.2M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 84 | ₱1B | 36.9 | 2 | 94.5% |
| Flood Control and Drainage | 70 | ₱6.3B | 55.0 | 5 | 88.6% |
| Roads | 61 | ₱1.8B | 38.0 | 1 | 96.4% |
| OTHER | 2 | ₱116.2M | 73.3 | 1 | 85.5% |
| Bridges | 2 | ₱28.2M | 31.0 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱108.6M | 61.6 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 24CL0048CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.7M | 90% | High risk82 | —-0.009 |
| 24CL0046CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 91% | High risk81 | —-0.009 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
| 24CC0024CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE III) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0326CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 25CC0083CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA ANA, BULACAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱38.6M | 48% | High risk75 | —-0.025 |
| 23AA0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PRINCIPAL RIVER (BISLAK RIVER), BARANGAY TAMBIDAO-ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.2M | 100% | High risk71 | —-0.020 |
| 23A00308BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, PIDDIG - CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO - CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 4) | Region I | Region I | Completed | ₱99M | 100% | High risk69 | —-0.067 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24I00052CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱177.9M | 82% | High risk68 | —-0.007 |
| 25E00138CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.1M | 90% | High risk68 | —-0.012 |
| 23E00151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SHORE PROTECTION STRUCTURE AND COASTAL DEVELOPMENT ALONG BRGY. MULAWIN,STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 25OG0027REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱145.5M | 15% | High risk67 | —-0.014 |
| 25E00151BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱247.5M | 93% | High risk67 | —-0.010 |
| 25E00150BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY | Region IV-B | Region IV-B | On-Going | ₱247.5M | 94% | High risk67 | —-0.010 |
| 25E00147FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱229.8M | 88% | High risk67 | —-0.011 |
| 24E00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱236.4M | 100% | High risk67 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 24E00279CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱11.7M | 0% | Medium risk37 | Flagged0.021 |
| 23G00051REHABILITATION OF MANSAYA CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱101.3M | 0% | High risk64 | Flagged0.018 |
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24E00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ARACELI SUPER HEALTH CENTER, ARACELI, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱11.7M | 64% | Medium risk34 | Flagged0.011 |
| 24I00023NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱271.5M | 46% | High risk65 | Flagged0.004 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 21OH0017LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRA PROGRAM-REHAB OF ROADS AND ALLEYS, ZONE 85, STA. ANA, MANILA | National Capital Region | South Manila DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.099 |
| 177 | 20DI0064CONSTRUCTION OF MULTI - PURPOSE BUILDING, PEA IIA BARANGAY LANGGAM, SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱3M | 100% | Low risk25 | —-0.105 |
| 178 | 21OH0008LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-SCHOOL BUILDINGS-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/REHABILITATION OF SCHOOL BUILDING/FACILITIES,BRGY. 660-A,ARAULLO HIGH SCHOOL, ERMITA,MANILA | National Capital Region | South Manila DEO | Completed | ₱3M | 100% | Low risk25 | —-0.102 |
| 179 | 22OH0159CONST./REHAB. OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM AT 1) PHILIPPINE SCHOOL FOR THE DEAF, PASAY CITY, 2)PHILIPPINE NATIONAL SCHOOL FOR THE BLIND, PASAY CITY,3) JOSE RIZAL ELEMENTARY SCHOOL, PASAY CITY,4) EPIFANIO DELOS SANTOS ELE | National Capital Region | South Manila DEO | Completed | ₱4.4M | 100% | Low risk25 | —-0.066 |
| 180 | 20OE0158CONSTRUCTION AND / OR REPAIR / REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. 121, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.104 |
| 181 | 20OG0079CONSTRUCTION OF 2 STOREY MULTI-PURPOSE BUILDING, BARANGAY TATALON, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.103 |
| 182 | 20OB0025REHABILITATION OF DRAINAGE AT NCMH BARANGAY MAUWAY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.8M | 100% | Low risk25 | —-0.089 |
| 183 | 19CD0348CONCRETING OF SITIO PINAGAKSAN, BRGY. CAINGIN FMR, BRGY. CAINGIN, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱5.7M | 100% | Low risk24 | —-0.048 |
| 184 | 19OB0425REPAIR/REHABILITATION SSS ELEMENTARY SCHOOL BUILDING INCLUDING SITE DEVELOPMENT BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.9M | 100% | Low risk24 | —-0.103 |
| 185 | 20OH0054LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHAB. OF ROADS AND A | National Capital Region | South Manila DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.098 |
| 186 | 20OH0042LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BLDGS. & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. | National Capital Region | South Manila DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.103 |
| 187 | 22OH0161CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FACILITIES FOR PERSON WITH THE DISABILITIES (PWD) AND ELDERLIES/SENIOR CITIZENS, INCLUDING GENDER-RESPONSIVE FACILITIES, MANILA | National Capital Region | South Manila DEO | Completed | ₱2.4M | 100% | Low risk24 | —-0.100 |
| 188 | 20OH0038LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS & OTHER STRUCTURES-SCHOOL BUILDINGS-CONST. OF V | National Capital Region | South Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.097 |
| 189 | 20DO0008LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD LEADING TO CARDONA GOVERNMENT CENTER, BRGY. SAN ROQUE CARDONA RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.100 |
| 190 | 20DI0060ASPHALTING OF ROAD AT SITIO KABARITAN, BRGY. STO. DOMINGO, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.102 |
| 191 | 20OH0057LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-REHAB. OF ROADS & ALLEYS,ZONE 85,STA.ANA,MANILA | National Capital Region | South Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.098 |
| 192 | 20OH0059LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-REHAB. OF ROADS & ALLEY | National Capital Region | South Manila DEO | Completed | ₱1.9M | 100% | Low risk22 | —-0.099 |
| 193 | 20CC0277IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, KALYE 11 & LUMABAS ST., MAKINABANG, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.7M | 100% | Low risk22 | —-0.047 |
| 194 | 20CD0159CONSTRUCTION / REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS BRGY. STO. TOMAS, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱4.7M | 100% | Low risk19 | —-0.107 |
| 195 | 20OE0155REHABILITATION OF MULTI - PURPOSE FACILITIES, BARANGAY 640, PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.101 |
| 196 | 20OB0285REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. BAGONG SILANG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.097 |
| 197 | 20OB0302REHABILITATION OF MULTI-PURPOSE BUILDING AT PLAINVIEW ELEMENTARY SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.097 |
| 198 | 20OB0298REHABILITATION OF MULTI-PURPOSE BUILDING AT MANDALUYONG HIGH SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.098 |
| 199 | 20OB0304REHABILITATION OF MULTI-PURPOSE BUILDING AT RENATO LOPEZ ELEMENTARY SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.099 |
| 200 | 20OB0058REHABILITATION OF MULTI-PURPOSE BUILDING AT MANDALUYONG CITY SCIENCE HIGH SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.103 |