Contractor dossier
221 projects on file, including joint ventures this contractor is part of.
Total projects
221
Total budget
₱9.4B
Average progress
93.2%
Completion rate
80.5%
Average risk score
43.3
Medium risk on average, out of 100
Flagged as unusual
9
4.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 88 | ₱1.4B | 41.0 | 0 | 95.1% |
| Region III | 66 | ₱2B | 34.6 | 2 | 96.0% |
| Region IV-A | 26 | ₱1.4B | 50.0 | 0 | 90.8% |
| Region IV-B | 17 | ₱2.7B | 59.1 | 3 | 88.1% |
| Region XI | 9 | ₱338.5M | 47.5 | 0 | 100.0% |
| Region I | 5 | ₱432.6M | 61.5 | 0 | 100.0% |
| Region VIII | 4 | ₱726M | 70.3 | 2 | 74.8% |
| Region VI | 4 | ₱378.6M | 66.0 | 2 | 30.3% |
| Negros Island Region | 2 | ₱90.2M | 45.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 84 | ₱1B | 36.9 | 2 | 94.5% |
| Flood Control and Drainage | 70 | ₱6.3B | 55.0 | 5 | 88.6% |
| Roads | 61 | ₱1.8B | 38.0 | 1 | 96.4% |
| OTHER | 2 | ₱116.2M | 73.3 | 1 | 85.5% |
| Bridges | 2 | ₱28.2M | 31.0 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱108.6M | 61.6 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 25.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 24CL0048CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 6, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.7M | 90% | High risk82 | —-0.009 |
| 24CL0046CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 5, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 91% | High risk81 | —-0.009 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
| 24CC0024CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PHASE III) AT BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0326CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BAMBANG, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.061 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 25CC0083CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA ANA, BULACAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱38.6M | 48% | High risk75 | —-0.025 |
| 23AA0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PRINCIPAL RIVER (BISLAK RIVER), BARANGAY TAMBIDAO-ABKIR, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱48.2M | 100% | High risk71 | —-0.020 |
| 23A00308BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, PIDDIG - CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO - CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 4) | Region I | Region I | Completed | ₱99M | 100% | High risk69 | —-0.067 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24I00052CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱177.9M | 82% | High risk68 | —-0.007 |
| 25E00138CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱230.1M | 90% | High risk68 | —-0.012 |
| 23E00151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SHORE PROTECTION STRUCTURE AND COASTAL DEVELOPMENT ALONG BRGY. MULAWIN,STA. CRUZ, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 25OG0027REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXVI), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱145.5M | 15% | High risk67 | —-0.014 |
| 25E00151BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱247.5M | 93% | High risk67 | —-0.010 |
| 25E00150BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY | Region IV-B | Region IV-B | On-Going | ₱247.5M | 94% | High risk67 | —-0.010 |
| 25E00147FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱229.8M | 88% | High risk67 | —-0.011 |
| 24E00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱236.4M | 100% | High risk67 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0250CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG AKLAN RIVER (PACKAGE 2), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱95.5M | 55% | High risk83 | Flagged0.059 |
| 23CC0530CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. HINUKAY BALIUAG, BULACAN STA. 005+241 TO STA. 005+541 | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 0% | High risk76 | Flagged0.056 |
| 24E00279CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- NAUJAN SUPER HEALTH CENTER, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱11.7M | 0% | Medium risk37 | Flagged0.021 |
| 23G00051REHABILITATION OF MANSAYA CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱101.3M | 0% | High risk64 | Flagged0.018 |
| 24I00196SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, ALONG BRGY. CAROLINA, CAN-AVID - DOLORES ROAD, STA. 27+371 - 28+767 | Region VIII | Region VIII | On-Going | ₱96.4M | 71% | High risk84 | Flagged0.015 |
| 24E00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ARACELI SUPER HEALTH CENTER, ARACELI, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱11.7M | 64% | Medium risk34 | Flagged0.011 |
| 24I00023NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS, LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱271.5M | 46% | High risk65 | Flagged0.004 |
| 24E00148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱232.4M | 85% | High risk68 | Flagged0.001 |
| 24CL0028CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE V | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 69% | High risk80 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20OB0055REHABILITATION OF MULTI-PURPOSE BUILDING AT E. RODRIGUEZ INTEGRATED SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.104 |
| 202 | 20OB0301REHABILITATION OF MULTI-PURPOSE BUILDING AT PEDRO P. CRUZ ELEMENTARY SCHOOL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱1.9M | 100% | Low risk16 | —-0.099 |
| 203 | 21CC0110REHABILITATION OF ROAD INCLUDING DRAINAGE, DUHAT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2.9M | 100% | Low risk15 | —-0.104 |
| 204 | 20CC0282IMPROVEMENT OF LOCAL ROAD INCLUDING DRAINAGE, GATE 2, KAMAGONG & NARRA STS., LEGARDA SUBD., TIBAGAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2.9M | 100% | Low risk14 | —-0.047 |
| 205 | 21CD0035CONSTRUCTION (COMPLETION) OF DRAINAGE CANAL, SAN AGUSTIN, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱2.2M | 100% | Low risk14 | —-0.090 |
| 206 | 21CC0108REHABILITATION OF ROAD INCLUDING DRAINAGE, BAGONG NAYON, BALIWAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2.9M | 100% | Low risk13 | —-0.105 |
| 207 | 21CD0002REHABILITATION OF ROAD, GLADIOLA ST., PANDAYAN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.101 |
| 208 | 21CD0006CONSTRUCTION OF ROAD, SALUD ST., PANDAYAN, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk13 | —-0.101 |
| 209 | 21CC0146REHABILITATION OF ROAD INCLUDING SLOPE PROTECTION, NIA ROAD, (D. MACAM ST. TO ST. PETER OF ALCANTARA PARISH CHURCH), TAAL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱1.9M | 100% | Low risk12 | —-0.102 |
| 210 | 20CD0142CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. HULO, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱2.8M | 100% | Low risk12 | —-0.108 |
| 211 | 20CC0156CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING) BRGY. BINANG 2ND | Region III | Bulacan 1st DEO | Completed | ₱1.9M | 100% | Low risk11 | —-0.106 |
| 212 | 21CC0098REHABILITATION OF CREEK (DE-CLOGGING & RIPRAPPING), TIAONG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱1.5M | 100% | Low risk11 | —-0.091 |
| 213 | 20CD0138CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BRGY. CAINGIN, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱2.8M | 100% | Low risk11 | —-0.108 |
| 214 | 20CD0150REHABILITATION OF ROAD SITIO GULOD, HERNANDEZ ST., PULONG BUHANGIN, STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk11 | —-0.102 |
| 215 | 21CC0157PACKAGE 3 - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL IMPROVEMENT), MALIS AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2M | 100% | Low risk11 | —-0.106 |
| 216 | 21CC0122CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BARANGAY LALANGAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱1.9M | 100% | Low risk10 | —-0.106 |
| 217 | 21CD0012CONCRETING OF ROAD, PULONG BAYABAS, SAN RAFAEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk10 | —-0.103 |
| 218 | 20CC0261IMPROVEMENT OF PANDI DISTRICT HOSPITAL (FENCING), POBLACION ,PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2.8M | 100% | Low risk9 | —-0.055 |
| 219 | 20CD0140CONSTRUCTION OF MULTI-PURPOSE COVERED COURT BRGY. PATUBIG, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk9 | —-0.106 |
| 220 | 20CC0281SCHOOL IMPROVEMENT, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALIWAG NORTH CENTRAL SCHOOL, POBLACION, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱2.8M | 100% | Low risk9 | —-0.055 |
| 221 | 21CD0057CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. LUCIA ES, STA. LUCIA, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱1.9M | 100% | Low risk8 | —-0.106 |