Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱5.8B
Average progress
98.6%
Completion rate
92.9%
Average risk score
35.9
Medium risk on average, out of 100
Flagged as unusual
7
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 140 | ₱5.8B | 35.9 | 7 | 98.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 59 | ₱278.4M | 20.4 | 0 | 100.0% |
| Roads | 42 | ₱2.2B | 43.3 | 0 | 99.1% |
| Flood Control and Drainage | 14 | ₱1.9B | 57.0 | 2 | 98.6% |
| Bridges | 14 | ₱829.7M | 47.0 | 1 | 96.0% |
| Bridges, Roads | 4 | ₱295.8M | 49.9 | 1 | 83.0% |
| Water Provision and Storage | 4 | ₱22.8M | 33.3 | 0 | 100.0% |
| OTHER | 2 | ₱289.5M | 64.4 | 2 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱36.1M | 90.2 | 1 | 90.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EE0048WIDENING OF PERMANENT BRIDGES-LINAPAWAN BRIDGE (B00214PW) ALONG PUERTO PRINCESA NORTH ROAD, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱36.1M | 90% | High risk90 | Flagged0.007 |
| 23E00095SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, | Region IV-B | Region IV-B | On-Going | ₱186.1M | 32% | High risk67 | Flagged0.024 |
| 25E00131CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 85% | High risk67 | Flagged0.011 |
| 25E00130CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 95% | High risk67 | Flagged0.008 |
| 24E00133SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY,PTO. PRINCESA SOUTH ROAD (DOWNSTREAM LEFTYSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | High risk66 | —-0.033 |
| 24E00180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVER BANK PROTECTION STRUCTURE ALONG IRAWAN RIVER UPSTREAM, BRGY. IRAWAN, PTO. PRINCESA CITY, PALA | Region IV-B | Region IV-B | Completed | ₱194.9M | 100% | High risk66 | —-0.025 |
| 24E00172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITUIES- CONST. OF PUNANG RIVER FLOOD CONTROL STRUCTURE, SOFRONIO, ESPANOLA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk66 | —-0.021 |
| 23E00187SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG IRAAN RIVER UPSTREAM, BRGY. IRAAN, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱212.3M | 100% | High risk65 | —-0.020 |
| 23E00188SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVER BANK PROTECTION STRUCTURES ALONG IRAWAN RIVER DOWNSTREAM (R/S), BRGY. IRAWAN, PTO. PRINCESA CITY, PALAW | Region IV-B | Region IV-B | Completed | ₱212.3M | 100% | High risk65 | —-0.023 |
| 20E00023CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE D, STA. 304+565.00-STA. 313+166.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk65 | Flagged0.028 |
| 20E00024CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE E, ROAD 1: STA. 294+850-STA. 295+776; ROAD 2: STA. 294+864-STA. 303+246 & ROAD 3: STA. 303+334-STA. 304+565; BRIDGE 1: STA. 295+776-STA. 295+864 & BRIDGE 2: | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | Flagged0.025 |
| 23E00076SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF MARABAHAY SHORE PROTECTION STRUCTURE/CAUSEWAY, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk63 | —-0.013 |
| 23E00090WIDENING OF PERMANENT BRIDGES- BABUYAN BRIDGE (B00095PW) ALONG PUERTO PRINCESA NORTH ROAD, PALAWAN | Region IV-B | Region IV-B | Completed | ₱159.2M | 100% | High risk62 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20E00023CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE D, STA. 304+565.00-STA. 313+166.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk65 | Flagged0.028 |
| 20E00024CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE E, ROAD 1: STA. 294+850-STA. 295+776; ROAD 2: STA. 294+864-STA. 303+246 & ROAD 3: STA. 303+334-STA. 304+565; BRIDGE 1: STA. 295+776-STA. 295+864 & BRIDGE 2: | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | Flagged0.025 |
| 23E00095SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, | Region IV-B | Region IV-B | On-Going | ₱186.1M | 32% | High risk67 | Flagged0.024 |
| 25E00131CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 85% | High risk67 | Flagged0.011 |
| 25E00130CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 95% | High risk67 | Flagged0.008 |
| 25EE0048WIDENING OF PERMANENT BRIDGES-LINAPAWAN BRIDGE (B00214PW) ALONG PUERTO PRINCESA NORTH ROAD, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱36.1M | 90% | High risk90 | Flagged0.007 |
| 25E00136COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, PHASE II, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱92.3M | 44% | Medium risk57 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22E00079CLUSTER 5: ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, PALAWAN 5.1. KO147+000-KO147+820; 5.2. KO158+000-KO158+306; KO158+348-KO158+775; 5.3. KO161+795-KO162+484 AND 5.4. KO180+686-KO180+793; KO180+812-KO181+256, PALAWAN | Region IV-B | Region IV-B | Completed | ₱104.8M | 100% | Medium risk53 | —-0.063 |
| 27 | 21E00055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE - TRIP) CONCRETING OF PUROK 4 STO. NINO ROAD LEADING TO OMBO FALLS VIA BATO NINGNING SITE, STA. 0+000.00 - STA. 1+915.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱101.3M | 100% | Medium risk53 | —-0.063 |
| 28 | 22E00020ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, KO131+870-KO132+432, KO132+712-KO133+456, KO140+(-676)-KO140+478, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱99.4M | 96% | Medium risk53 | —-0.016 |
| 29 | 23E00086NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING - SECONDARY ROADS - PUERTO PRINCESA SOUTH ROAD, KO053+096-KO055+203, PALAWAN | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk52 | —-0.058 |
| 30 | 23E00085NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0060+227-K0061+1068; K0062+002-K0063+089, PALAWAN | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk52 | —-0.058 |
| 31 | 23E00087NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- PUERTO PRINCESA SOUTH ROAD, K0058+(-494)-K0060+227, PALAWAN | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk52 | —-0.058 |
| 32 | 18EE0137CONSTRUCTION OF CONCRETE ROAD-BUSUANGA AIRPORT-KIWIT ROAD LEADING TOVARIOUS BEACHES, ISLAND DESTINATIONS AND WORLD WAR II SHIP WRECK DIVE SITES INCLUDING BRIDGE, STA.31+761.2-STA.32+322.2 BUSUANGA, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱65.9M | 100% | Medium risk50 | —-0.059 |
| 33 | 22E00124WIDENING OF BRIDGES - TAGBOLANTE BR. (B00030PW) ALONG ARAMAYWAN-BERONG PUERTO PRINCESA SOUTH ROAD, APPROACH A: STA. 195+120-STA. 195+204; BRIDGE: STA. 195+204-STA. 195+264.60; APPROACH B: STA. 195+264.60-STA. 195+300, PALAWAN | Region IV-B | Region IV-B | Completed | ₱60.6M | 100% | Medium risk50 | —-0.033 |
| 34 | 21EG0046CONSTRUCTION OF CONCRETE BRIDGE - NAGTAMLANG BR. ALONG ARAMAYWAN-BERONG-PTO. PRINCESA RD, K0226+506.69, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱57.9M | 100% | Medium risk50 | —-0.031 |
| 35 | 21E00039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO MUSSEL PRODUCTION & FISHING INDUSTRY, BRGY. GUINLO, STA. 201+814.50 - STA. 204+455.00, TAYTAY, PALAWAN | Region IV-B | Region IV-B | Completed | ₱67.6M | 100% | Medium risk48 | —-0.071 |
| 36 | 18EE0122CONSTRUCTION OF CONCRETE ROAD - LITTLE CARAMAY - TDC - PAGDANAN LEADING TOPROPOSED PORT, STA. 00+000.00 - STA. 1+210.00SAN VICENTE, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱74.7M | 100% | Medium risk48 | —-0.068 |
| 37 | 18EE0127ROAD WIDENING PUERTO PRINCESA NORTH ROAD K0111+200 - K0112+878 (RBIA STATIONS),K0111+200 - K0112+885 (SURVEY STATIONS) | Region IV-B | Palawan 1st DEO | Completed | ₱83.7M | 100% | Medium risk48 | —-0.066 |
| 38 | 23EG0052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PPSR JCT-NAPSAN-APURAWAN RD., STATION K0035+445 - K0035+541, K0048+400 - K0048+740, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱81.6M | 100% | Medium risk48 | —-0.061 |
| 39 | 23EF0064WIDENING OF PERMANENT BRIDGE PUNANG BR. (B00060PW) ALONG PUERTO PRINCESA SOUTH RD, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱52.8M | 100% | Medium risk47 | —-0.034 |
| 40 | 24EE0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TULARIQUIN RIVER (RS), ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱48.2M | 100% | Medium risk45 | —-0.058 |
| 41 | 23EF0058WIDENING OF PERMANENT BRIDGES OCAYAN BR. (B00128PW) ALONG PUERTO PRINCESA SOUTH RD, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱47.7M | 100% | Medium risk45 | —-0.026 |
| 42 | 21E00096CLUSTER 6: CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION, PALAWAN, 6.1. CONC. OF NEW AGUTAYA TOURISM ACCESS RD. LEADING TO SAN VICENTE LONG BEACH; 6.2. CONC. OF ROADS FROM POBLACION TO CAPARI COVE, SAN VICENTE, PALAWAN | Region IV-B | Region IV-B | Completed | ₱48.2M | 100% | Medium risk44 | —-0.072 |
| 43 | 19EG0080CONSTRUCTION OF NEW ROAD NET, (ABAB), AFP JOINT BASE, STA. 00+000 TO 1+915.00, BRGY. SAN MIGUEL, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱49M | 100% | Medium risk44 | —-0.073 |
| 44 | 24EE0017CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG IRAAN BRIDGE, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱44.1M | 100% | Medium risk42 | —-0.058 |
| 45 | 25EE0040CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CATABAN BRIDGE I, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱29.4M | 100% | Medium risk42 | —-0.031 |
| 46 | 24EE0020CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TAGUMPAY BRIDGE, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱44.1M | 100% | Medium risk42 | —-0.057 |
| 47 | 22EE0040CONSTRUCTION/IMPROVEMENTOF ACCESS ROAD LEADING TO NACPAN BEACH BRGY. BUCANA, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱19.5M | 100% | Medium risk41 | —-0.055 |
| 48 | 20EE0014RECONSTRUCTION OF DAMAGED PAVED ROADS ALONG EL NIDO-JCT. NEW IBAJAY ROAD, KO272+(-738)-KO274+000; KO276+377-KO276+521EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱40M | 100% | Medium risk41 | —-0.075 |
| 49 | 21EE0074WIDENING OF PERMANENT BRDGES, TULARIQUEN RCDG BR.(B00381PW) ALONG PUERT PRICESA NORTH ROAD ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱35.7M | 100% | Medium risk41 | —-0.038 |
| 50 | 20EE0042CONSTRUCTION OF OMAO FLOOD CONTROL PROJECTTAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱9.5M | 100% | Medium risk41 | —-0.057 |