Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱5.8B
Average progress
98.6%
Completion rate
92.9%
Average risk score
35.9
Medium risk on average, out of 100
Flagged as unusual
7
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 140 | ₱5.8B | 35.9 | 7 | 98.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 59 | ₱278.4M | 20.4 | 0 | 100.0% |
| Roads | 42 | ₱2.2B | 43.3 | 0 | 99.1% |
| Flood Control and Drainage | 14 | ₱1.9B | 57.0 | 2 | 98.6% |
| Bridges | 14 | ₱829.7M | 47.0 | 1 | 96.0% |
| Bridges, Roads | 4 | ₱295.8M | 49.9 | 1 | 83.0% |
| Water Provision and Storage | 4 | ₱22.8M | 33.3 | 0 | 100.0% |
| OTHER | 2 | ₱289.5M | 64.4 | 2 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱36.1M | 90.2 | 1 | 90.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EE0048WIDENING OF PERMANENT BRIDGES-LINAPAWAN BRIDGE (B00214PW) ALONG PUERTO PRINCESA NORTH ROAD, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱36.1M | 90% | High risk90 | Flagged0.007 |
| 23E00095SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, | Region IV-B | Region IV-B | On-Going | ₱186.1M | 32% | High risk67 | Flagged0.024 |
| 25E00131CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 85% | High risk67 | Flagged0.011 |
| 25E00130CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 95% | High risk67 | Flagged0.008 |
| 24E00133SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY,PTO. PRINCESA SOUTH ROAD (DOWNSTREAM LEFTYSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.4M | 100% | High risk66 | —-0.033 |
| 24E00180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVER BANK PROTECTION STRUCTURE ALONG IRAWAN RIVER UPSTREAM, BRGY. IRAWAN, PTO. PRINCESA CITY, PALA | Region IV-B | Region IV-B | Completed | ₱194.9M | 100% | High risk66 | —-0.025 |
| 24E00172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITUIES- CONST. OF PUNANG RIVER FLOOD CONTROL STRUCTURE, SOFRONIO, ESPANOLA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk66 | —-0.021 |
| 23E00187SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG IRAAN RIVER UPSTREAM, BRGY. IRAAN, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱212.3M | 100% | High risk65 | —-0.020 |
| 23E00188SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVER BANK PROTECTION STRUCTURES ALONG IRAWAN RIVER DOWNSTREAM (R/S), BRGY. IRAWAN, PTO. PRINCESA CITY, PALAW | Region IV-B | Region IV-B | Completed | ₱212.3M | 100% | High risk65 | —-0.023 |
| 20E00023CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE D, STA. 304+565.00-STA. 313+166.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk65 | Flagged0.028 |
| 20E00024CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE E, ROAD 1: STA. 294+850-STA. 295+776; ROAD 2: STA. 294+864-STA. 303+246 & ROAD 3: STA. 303+334-STA. 304+565; BRIDGE 1: STA. 295+776-STA. 295+864 & BRIDGE 2: | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | Flagged0.025 |
| 23E00076SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF MARABAHAY SHORE PROTECTION STRUCTURE/CAUSEWAY, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk63 | —-0.013 |
| 23E00090WIDENING OF PERMANENT BRIDGES- BABUYAN BRIDGE (B00095PW) ALONG PUERTO PRINCESA NORTH ROAD, PALAWAN | Region IV-B | Region IV-B | Completed | ₱159.2M | 100% | High risk62 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20E00023CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE D, STA. 304+565.00-STA. 313+166.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk65 | Flagged0.028 |
| 20E00024CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE E, ROAD 1: STA. 294+850-STA. 295+776; ROAD 2: STA. 294+864-STA. 303+246 & ROAD 3: STA. 303+334-STA. 304+565; BRIDGE 1: STA. 295+776-STA. 295+864 & BRIDGE 2: | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | Flagged0.025 |
| 23E00095SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, | Region IV-B | Region IV-B | On-Going | ₱186.1M | 32% | High risk67 | Flagged0.024 |
| 25E00131CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 85% | High risk67 | Flagged0.011 |
| 25E00130CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱229.9M | 95% | High risk67 | Flagged0.008 |
| 25EE0048WIDENING OF PERMANENT BRIDGES-LINAPAWAN BRIDGE (B00214PW) ALONG PUERTO PRINCESA NORTH ROAD, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱36.1M | 90% | High risk90 | Flagged0.007 |
| 25E00136COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, PHASE II, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱92.3M | 44% | Medium risk57 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20EE0080CONSTRUCTION OF 1 UNIT 2 CLASSROOM SCHOOL BUILDING IN SAN ISIDRO ELEMENTARYSCHOOLBUSUANGA, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱3M | 100% | Low risk19 | —-0.077 |
| 102 | 19EE0079CONSTRUCTION OF MULTI-PURPOSE BUILDING, PSU EL NIDO BRGY. PASADENA, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱3M | 100% | Low risk19 | —-0.070 |
| 103 | 18EE0018CONSTRUCTION OF MULTI-PURPOSE BUILDING BGY. CULANGO CULION, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk18 | —-0.078 |
| 104 | 20EE0086CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. SAN RAFAELBUSUANGA, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk17 | —-0.073 |
| 105 | 23EG0031CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY ISAUB, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱3M | 100% | Low risk17 | —-0.062 |
| 106 | 20EE0090CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. BAROTUAN, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2.5M | 100% | Low risk16 | —-0.070 |
| 107 | 21EE0003CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY PASADEÑA, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 108 | 18EE0004CONSTRUCTION OF MULTI-PURPOSE BUILDING BGY. BAROTUAN EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 109 | 21EE0013CONSTRUCTION OF MULTI-PURPOSE BUILDING-1 UNIT 2 CLASSROOM VILLAPAZ ELEMENTARY SCHOOL BARANGAY VILLAPAZ, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |
| 110 | 20EE0074CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. VILLA LIBERTADEL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.071 |
| 111 | 21EE0023CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER) , IN BARANGAY MASAGANA, EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 112 | 21EE0034CONSTRUCTION OF MULTI-PURPOSE BUILDING(EVACUATION CENTER), IN BARANGAY BATAS, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |
| 113 | 21EE0035CONSTRUCTION OF MULTI-PURPOSE BUILDING(EVACUATION CENTER), IN BARANGAY CALAWAG, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.068 |
| 114 | 20EE0093CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LIBERTAD, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 115 | 21EE0017CONSTRUCTION OF MULTI-PURPOSE BUILDING 1 UNIT 2 CLASSROOM DEBANGAN ELEMENTARY SCHOOL DEBANGAN, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.071 |
| 116 | 21EE0016CONSTRUCTION OF MULTI-PURPOSE BUIDING- 1 UNIT 2 CLASSROOM BUSYBEES NATIONAL HIGH SHOOL BARANGAY BUSY BEES, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 117 | 21EE0062CONSTRUCTION OF MULTI-PURPOSE BUILDING(EVACUATION CENTER) IN BARANGAY SAN JOSE, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.068 |
| 118 | 21EE0040CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY CORONG CORONG EL NIDO, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |
| 119 | 21EE0014CONSTRUCTION OF MULTI-PURPOSE BUILDING 1-UNIT 2 CLASSROOM BARAS ELEMENTARY SCHOOL , BARANGAY BARAS,TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |
| 120 | 21EE0021CONSTRUCTION OF MULT- PURPOSE BUILDING - 1 UNIT 2 CLASSROOM SILANGA ELEMENTARY SCHOOL BARANGAY SILANGA, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 121 | 21EE0025CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY BANTULAN (PROPER) TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.068 |
| 122 | 21EE0015CONSTRUCTION OF MULTI-PURPOSE BUILDING - 1 UNIT 2 CLASSROOM BETON ELEMENTARY SCHOOL BARANGAY, BETON,TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |
| 123 | 21EE0004CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY CATABAN, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.068 |
| 124 | 21EE0022CONSTRUCTION OF MULTI-PURPOSE BUILDING 1-UNIT 2 CLASSROOM SANDOVAL ELEMENTARY SCOOL BARANGAY SANDOVAL, TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.069 |
| 125 | 18EE0003CONSTRUCTION OF MULTI-PURPOSE BUILDING BGY. SANDOVAL TAYTAY, PALAWAN | Region IV-B | Palawan 1st DEO | Completed | ₱2M | 100% | Low risk16 | —-0.070 |