Contractor dossier
179 projects on file, including joint ventures this contractor is part of.
Total projects
179
Total budget
₱1.8B
Average progress
98.9%
Completion rate
95.0%
Average risk score
36.0
Medium risk on average, out of 100
Flagged as unusual
6
3.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 179 | ₱1.8B | 36.0 | 6 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 90 | ₱338.9M | 28.2 | 0 | 100.0% |
| Roads | 64 | ₱909.4M | 40.7 | 4 | 98.4% |
| Flood Control and Drainage | 17 | ₱508.2M | 45.5 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱27.7M | 83.0 | 1 | 100.0% |
| Bridges | 4 | ₱65.8M | 49.1 | 1 | 74.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BG0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING OF ALIBADABAD NATIONAL HIGH SCHOOL,BRGY. ALIBADABAD, SAN MARIANO | Region II | Isabela 3rd DEO | On-Going | ₱2.4M | 100% | High risk91 | Flagged0.002 |
| 25BG0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAYCARE CENTER), BARANGAY ZONE 1, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱5.9M | 100% | High risk81 | —-0.024 |
| 25BG0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONCRETING OF ROAD OF BRGY. GUILINGAN TO BRGY. TAPPA, BRGY. TAPPA | Region II | Isabela 3rd DEO | Completed | ₱9.6M | 100% | High risk81 | —-0.023 |
| 25BG0088CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BARANGAY ROAD,GUILINGAN TO TAPPA | Region II | Isabela 3rd DEO | Completed | ₱9.8M | 100% | High risk79 | —-0.023 |
| 17BF0058CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS:CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (BITABIAN SECTION), SAN MARIANO, ISABELA, STA.0+000-STA.0+250, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.3M | 100% | High risk67 | —-0.044 |
| 21BG0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TIKAS) - CONSTRUCTION OF 5TH SIGNAL BATTALION BUILDING WITH OUTSIDE UTILITIES, CAMP MELCHOR F DELA CRUZ, UPI, GAMU, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱9.8M | 100% | High risk65 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BG0147CONCRETING OF BRGY. BUYASAN TO CADSALAN FMR, BRGY. BUYASAN, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.9M | 0% | Medium risk40 | Flagged0.030 |
| 25BG0157CONCRETING OF BRGY. DICAMAY TO BRGY. GUILINGAN FMR, BRGY. DICAMAY, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱9.7M | 100% | Medium risk58 | Flagged0.019 |
| 24BG0154CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DANIPA BRIDGE, BRGY. DANIPA, BENITO SOLIVEN, ISA | Region II | Isabela 3rd DEO | On-Going | ₱9.9M | 0% | Medium risk46 | Flagged0.010 |
| 17BF0092CONCRETING OF SAN FRANCISCO FMR-ROAD, SAN FRANCISCO, BENITO SOLIVEN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk48 | Flagged0.005 |
| 25BG0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING OF ALIBADABAD NATIONAL HIGH SCHOOL,BRGY. ALIBADABAD, SAN MARIANO | Region II | Isabela 3rd DEO | On-Going | ₱2.4M | 100% | High risk91 | Flagged0.002 |
| 17BF0085CONCRETING OF MALUNO SUR-MALUNO NORTE FMR, MALUNO SUR & MALUNO NORTE BENITO SOLIVEN, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.7M | 100% | Medium risk47 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24BG0003CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-CONSTRUCTION OF ACCESS ROAD LEADING TO AMISAN FALLS, BRGY. DEL PILAR, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱19.3M | 100% | Medium risk44 | —-0.083 |
| 52 | 20BG0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIE AND ECONOMIC ZONES - BARANGAY DARAGUTAN WEST - BALAGAN ROAD LEADING TO SUGARCANE, RICE AND CORN PRODUCTION AREA CONNECTING TO BIO-ETHANOL PLANT | Region II | Isabela 3rd DEO | Completed | ₱19.1M | 100% | Medium risk44 | —-0.083 |
| 53 | 20BG0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES - BARANGAY DIPUSU-DARAGUTAN WEST ROAD LEADING TO RICE AND CORN PRODUCTION AREA AND BIO-ETHANOL PLANT, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱23.5M | 100% | Medium risk44 | —-0.083 |
| 54 | 24BG0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, SITIO DIVIGUEN TO SITIO VILLA ANCHETA, BARANGAY | Region II | Isabela 3rd DEO | Completed | ₱19.8M | 100% | Medium risk44 | —-0.083 |
| 55 | 20BG0010OO2; PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL (MALUNO SECTION | Region II | Isabela 3rd DEO | Completed | ₱34M | 100% | Medium risk44 | —-0.065 |
| 56 | 22BG0085OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, MARANNAO, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱38.6M | 100% | Medium risk44 | —-0.066 |
| 57 | 23BG0094OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY CATAGUING, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱43.8M | 100% | Medium risk44 | —-0.066 |
| 58 | 22BG0082OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BITABIAN, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱29M | 100% | Medium risk44 | —-0.067 |
| 59 | 23BG0096OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY OLD SAN MARIANO, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱46.3M | 100% | Medium risk44 | —-0.067 |
| 60 | 20BG0005002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (BITABI | Region II | Isabela 3rd DEO | Completed | ₱34.4M | 100% | Medium risk44 | —-0.067 |
| 61 | 21BG0106LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BINATUG, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱29.7M | 100% | Medium risk44 | —-0.067 |
| 62 | 22BG0020OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY | Region II | Isabela 3rd DEO | Completed | ₱19.3M | 100% | Medium risk44 | —-0.067 |
| 63 | 20BG0004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK PROTECTION AT PINACANAUAN RIVER FLOOD CO | Region II | Isabela 3rd DEO | Completed | ₱25.1M | 100% | Medium risk44 | —-0.068 |
| 64 | 20BG0009OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK PROTECTION AT PINACANAUAN RIVER FLOOD CONT | Region II | Isabela 3rd DEO | Completed | ₱25M | 100% | Medium risk44 | —-0.068 |
| 65 | 19BF0043PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (DARAGUTAN WEST SECTION), SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.069 |
| 66 | 19BF0098CONSTRUCTION OF DISABUNGAN RIVER TO PINACANAUAN RIVER, BINATUG, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.6M | 100% | Medium risk44 | —-0.067 |
| 67 | 21BG0053LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF MINANGA-PIKUT BARANGAY ROAD, MINANGA, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.084 |
| 68 | 22BG0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BOX CULVERT OF BARANGAY MAKINDOL, BENITO SOLIVEN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.068 |
| 69 | 22BG0102CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD ATBARANGAY ROXAS TO BARANGAY QUEZON, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.084 |
| 70 | 22BG0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY PANNINAN TO BARANGAY DEL PILAR ROAD, SA | Region II | Isabela 3rd DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.084 |
| 71 | 22BG0108CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BARANGAY DEL PILAR - BARANGAY LIBERTAD ROAD SECTION AT BRGY. DEL PILAR, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.084 |
| 72 | 22BG0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY DICAMAY, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.079 |
| 73 | 22BG0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD AT BARANGAY DICAMAY, SAN MARIANO TO BARANGAY GUILINGAN, BEN | Region II | Isabela 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.079 |
| 74 | 22BG0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD AT BARANGAY VILLA LUZ-BARANGAY DAGUPAN, BENITO SOLIVEN, ISA | Region II | Isabela 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.084 |
| 75 | 21BG0044LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, BARANGAY RIZAL, GAMU, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱8.4M | 100% | Medium risk43 | —-0.085 |