Opening the dossier…
Opening the dossier…
Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱82.9M
Average progress
67.4%
Completion rate
0.0%
Below 70%
Average risk score
60.0
Medium risk on average, out of 100
Flagged as unusual
1
25.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 4 | ₱82.9M | 60.0 | 1 | 67.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3 | ₱35.2M | 57.6 | 0 | 80.1% |
| Flood Control and Drainage | 1 | ₱47.7M | 67.3 | 1 | 29.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24JA0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MERCEDES RIVER, PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱47.7M | 29% | High risk67 | Flagged0.035 |
| 2 | 24JA0057SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE ROAD AT CAMP ABENDAN PRO9, BARANGAY MERCEDES, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱15.6M | 75% | Medium risk59 | —-0.040 |
| 3 | 24JA0053SIPAG- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE ROAD AT BARANGAY MANICAHAN, ZAMBOANGA CTIY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱9.8M | 75% | Medium risk57 | —-0.040 |
| 4 | 24JA0099SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION/RECONSTRUCTION OF ROAD AT ZONE 3B, BRGY. LUMBANGAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱9.8M | 90% | Medium risk57 | —-0.044 |