Contractor dossier
150 projects on file, including joint ventures this contractor is part of.
Total projects
150
Total budget
₱10.9B
Average progress
84.3%
Completion rate
63.3%
Below 70%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
31
20.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 140 | ₱10.1B | 57.4 | 25 | 83.7% |
| Region XIII | 8 | ₱781M | 70.7 | 6 | 91.2% |
| Negros Island Region | 2 | ₱26.8M | 41.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 58 | ₱5.3B | 59.9 | 8 | 83.6% |
| Roads | 30 | ₱2B | 53.2 | 3 | 90.0% |
| Bridges | 26 | ₱2B | 54.3 | 9 | 76.2% |
| Buildings and Facilities | 18 | ₱349.6M | 46.4 | 1 | 93.6% |
| GAA 2025 SSP | 4 | ₱246.2M | 93.0 | 3 | 80.4% |
| GAA 2025 OO-2 | 4 | ₱411.6M | 92.7 | 3 | 79.6% |
| OTHER | 4 | ₱368.4M | 75.1 | 3 | 86.1% |
| Water Provision and Storage | 4 | ₱85.7M | 38.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱71.4M | 94.3 | 1 | 49.5% |
| Bridges, Roads | 1 | ₱100.3M | 64.1 | 0 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0137CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775) | Region VII | Cebu 6th DEO | On-Going | ₱141.9M | 83% | High risk96 | Flagged0.030 |
| 25HN0127SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱94.6M | 72% | High risk96 | Flagged0.026 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25H00061CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BECERRIL, BOLJOON, CEBU | Region VII | Region VII | On-Going | ₱4.9M | 67% | High risk93 | Flagged0.020 |
| 25HN0014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, PHASE 3, BARANGAY S | Region VII | Cebu 6th DEO | On-Going | ₱122.4M | 86% | High risk93 | —-0.005 |
| 25NB0038CONSTRUCTION OF GIBONG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG BARANGAY LAS NAVAS, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 75% | High risk93 | Flagged0.002 |
| 25NB0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GIBONG RIVER (LA SUERTE SECTION), PROSPERIDAD, AGUSAN DEL SUR PHASE III, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 76% | High risk93 | Flagged0.002 |
| 25NB0015CONSTRUCTION OF RIVER BANK PROTECTION ALONG GIBONG RIVER, PHASE II, BARANGAY LA SUERTE, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 81% | High risk93 | Flagged0.000 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
| 25HN0026SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BARANGAY CATARMAN, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.023 |
| 23HO0284CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TALAYONG SECTION, | Region VII | Cebu 7th DEO | On-Going | ₱115.7M | 0% | High risk86 | Flagged0.073 |
| 23HO0262ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM LEFT SIDE), ALEGRIA, C | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.077 |
| 23HO0279CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER, SITIO TUBOD, BARANGAY BANA | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.067 |
| 24HO0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANDUONG - SITIO LAWAAN PA | Region VII | Cebu 7th DEO | On-Going | ₱57.8M | 99% | High risk82 | Flagged0.034 |
| 23HO0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, MALABUYOC SECTION, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 0% | High risk74 | Flagged0.062 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 24HC0157BIP- PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATERWORKS SYSTEM, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.4M | 52% | High risk70 | Flagged0.010 |
| 22HN0069CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DAY-AS-BANGBANG COASTAL ROAD, CORDOBA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | High risk69 | —-0.031 |
| 24H00032CSSP, SUSTAINABLE INFRASTRUCTURE PROJ. ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, BARANGAY SUBANGDAKU,MANDAUE CITY, CEBU (PACKAGE II) | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk67 | —-0.013 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0262ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM LEFT SIDE), ALEGRIA, C | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.077 |
| 23HO0284CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TALAYONG SECTION, | Region VII | Cebu 7th DEO | On-Going | ₱115.7M | 0% | High risk86 | Flagged0.073 |
| 23HO0279CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER, SITIO TUBOD, BARANGAY BANA | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.067 |
| 23HO0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, MALABUYOC SECTION, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 0% | High risk74 | Flagged0.062 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
| 24HO0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANDUONG - SITIO LAWAAN PA | Region VII | Cebu 7th DEO | On-Going | ₱57.8M | 99% | High risk82 | Flagged0.034 |
| 25H00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG OREL CREEK (PHASE 2), BARANGAY BANILAD, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱98.9M | 0% | High risk66 | Flagged0.034 |
| 25HN0137CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775) | Region VII | Cebu 6th DEO | On-Going | ₱141.9M | 83% | High risk96 | Flagged0.030 |
| 25HN0127SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱94.6M | 72% | High risk96 | Flagged0.026 |
| 24HO0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM RIGHT SIDE) PAC | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 90% | High risk64 | Flagged0.025 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 24H00169LGU HOSPITALS-LAPU LAPU CITY HOSPITAL, CEBU | Region VII | Region VII | On-Going | ₱14.8M | 0% | Medium risk45 | Flagged0.020 |
| 25H00061CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BECERRIL, BOLJOON, CEBU | Region VII | Region VII | On-Going | ₱4.9M | 67% | High risk93 | Flagged0.020 |
| 24H00133CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱192.8M | 0% | High risk64 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 24NB0093INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NJR BAHBAH-TALACOGON ROAD - K1294+(-499) - K1300+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 100% | Medium risk51 | Flagged0.015 |
| 24NB0095INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ BAYUGAN-ESPERANZA ROAD - K1270+(-976) - K1276+221, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 100% | Medium risk53 | Flagged0.012 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
| 24HC0157BIP- PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATERWORKS SYSTEM, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.4M | 52% | High risk70 | Flagged0.010 |
| 25HO0154CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG ALEGRIA RIVER (DOWNSTREAM, RI | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 4% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25HN0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 57% | High risk65 | —-0.013 |
| 27 | 22H00002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, CANSAGA BAY BR. (B00613CB) ALONG CANSAGA BAY BRIDGE, CEBU | Region VII | Region VII | Completed | ₱173.7M | 100% | High risk65 | —-0.027 |
| 28 | 25H00038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES | Region VII | Region VII | On-Going | ₱173.6M | 61% | High risk65 | Flagged0.008 |
| 29 | 24H00012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES | Region VII | Region VII | Completed | ₱173.7M | 100% | High risk65 | —-0.032 |
| 30 | 24HN0009OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BRGY. MAGUIKAY, PHASE 3, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱123M | 100% | High risk65 | —-0.063 |
| 31 | 25HN0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION FACILITY ALONG JAGOBIAO CREEK, PHASE 3, BRGY. CASILI,MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱125.4M | 82% | High risk65 | —-0.023 |
| 32 | 21H00065ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, PHASE II, CEBU PROVINCE | Region VII | Region VII | Completed | ₱144.7M | 100% | High risk65 | —-0.033 |
| 33 | 23H00008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES (PHASE IV), CEBU PROVINCE | Region VII | Region VII | Completed | ₱144.7M | 100% | High risk65 | —-0.034 |
| 34 | 24HN0040OO2: FLOOD MANAGEMENT PROGRAM - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BRGY. NANGKA, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱135M | 100% | High risk65 | —-0.061 |
| 35 | 24HN0057OO2: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY PAKNA-AN (LEVEL 2), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱122.9M | 91% | High risk65 | —-0.016 |
| 36 | 24HN0064OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY UMAPAD (LEVEL 2), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱122.9M | 94% | High risk65 | —-0.016 |
| 37 | 23H00057OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER (UPSTREAM-PHASE 2), BRGY. MAGUIKAY, MANDAUE CITY | Region VII | Region VII | Completed | ₱115.6M | 100% | High risk65 | —-0.063 |
| 38 | 25H00014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, PHASE 6, BRGY. TINGUB TO BRGY.CANDUMAN,MANDAUE | Region VII | Region VII | On-Going | ₱101.2M | 69% | High risk64 | —-0.023 |
| 39 | 25H00005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU SOUTH COASTAL RD - (S00015CB) CHAINAGE 510 - CHAINAGE 1019 | Region VII | Region VII | On-Going | ₱221.4M | 89% | High risk64 | —-0.032 |
| 40 | 23HO0133ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM RIGHT SIDE), ALEGRIA, C | Region VII | Cebu 7th DEO | Completed | ₱96.1M | 100% | High risk64 | —-0.067 |
| 41 | 24H00029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU SOUTH COASTAL RD - CHAINAGE 0 - CHAINAGE 510 | Region VII | Region VII | On-Going | ₱192.9M | 97% | High risk64 | —-0.030 |
| 42 | 25HN0003OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, PHASE 4, BARANGAY MAGUIKAY, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 59% | High risk64 | —-0.022 |
| 43 | 23HO0121ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM LEFT SIDE), ALEGRIA, CEB | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.067 |
| 44 | 25HN0053OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA RIVER, BRGY. SUBANGDAKU (PHASE 4), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 65% | High risk64 | —-0.024 |
| 45 | 24H00181OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF FLYOVERS/ INTERCHANGES/ UNDERPASSES/ LONG SPAN BRIDGES, TRI-LEVEL INTERCHANGE ALONG CEBU NORTH HAGNAYA WHARF ROAD (M.C. BRIONES STREET) CORNER U.N. AVENUE | Region VII | Region VII | On-Going | ₱100.3M | 0% | High risk64 | —-0.009 |
| 46 | 25HO0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANG-IRONG TO SITIO LOWER POBLACION, B | Region VII | Cebu 7th DEO | On-Going | ₱96.4M | 54% | High risk64 | —-0.021 |
| 47 | 25HO0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL, PACKAGE 2, SITIO KANDUONG TO SITIO LAWAAN, BAR | Region VII | Cebu 7th DEO | On-Going | ₱96.4M | 66% | High risk64 | —-0.025 |
| 48 | 23HO0014ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LUWAK - SITIO KANG-IRONG, BRGY. S | Region VII | Cebu 7th DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.066 |
| 49 | 24H00018OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF WAHIG RIVER CONTROL, PHASE 4, SIERRA BULLONES, BOHOL | Region VII | Region VII | On-Going | ₱173.6M | 85% | High risk64 | —-0.004 |
| 50 | 24H00133CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱192.8M | 0% | High risk64 | Flagged0.019 |