Opening the dossier…
Opening the dossier…
Contractor dossier
150 projects on file, including joint ventures this contractor is part of.
Total projects
150
Total budget
₱10.9B
Average progress
84.3%
Completion rate
63.3%
Below 70%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
31
20.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 140 | ₱10.1B | 57.4 | 25 | 83.7% |
| Region XIII | 8 | ₱781M | 70.7 | 6 | 91.2% |
| Negros Island Region | 2 | ₱26.8M | 41.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 58 | ₱5.3B | 59.9 | 8 | 83.6% |
| Roads | 30 | ₱2B | 53.2 | 3 | 90.0% |
| Bridges | 26 | ₱2B | 54.3 | 9 | 76.2% |
| Buildings and Facilities | 18 | ₱349.6M | 46.4 | 1 | 93.6% |
| GAA 2025 SSP | 4 | ₱246.2M | 93.0 | 3 | 80.4% |
| GAA 2025 OO-2 | 4 | ₱411.6M | 92.7 | 3 | 79.6% |
| OTHER | 4 | ₱368.4M | 75.1 | 3 | 86.1% |
| Water Provision and Storage | 4 | ₱85.7M | 38.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱71.4M | 94.3 | 1 | 49.5% |
| Bridges, Roads | 1 | ₱100.3M | 64.1 | 0 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HN0137CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775) | Region VII | Cebu 6th DEO | On-Going | ₱141.9M | 83% | High risk96 | Flagged0.030 |
| 25HN0127SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱94.6M | 72% | High risk96 | Flagged0.026 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25H00061CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BECERRIL, BOLJOON, CEBU | Region VII | Region VII | On-Going | ₱4.9M | 67% | High risk93 | Flagged0.020 |
| 25HN0014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, PHASE 3, BARANGAY S | Region VII | Cebu 6th DEO | On-Going | ₱122.4M | 86% | High risk93 | —-0.005 |
| 25NB0038CONSTRUCTION OF GIBONG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG BARANGAY LAS NAVAS, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 75% | High risk93 | Flagged0.002 |
| 25NB0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GIBONG RIVER (LA SUERTE SECTION), PROSPERIDAD, AGUSAN DEL SUR PHASE III, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 76% | High risk93 | Flagged0.002 |
| 25NB0015CONSTRUCTION OF RIVER BANK PROTECTION ALONG GIBONG RIVER, PHASE II, BARANGAY LA SUERTE, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 81% | High risk93 | Flagged0.000 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
| 25HN0026SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BARANGAY CATARMAN, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.023 |
| 23HO0284CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TALAYONG SECTION, | Region VII | Cebu 7th DEO | On-Going | ₱115.7M | 0% | High risk86 | Flagged0.073 |
| 23HO0262ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM LEFT SIDE), ALEGRIA, C | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.077 |
| 23HO0279CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER, SITIO TUBOD, BARANGAY BANA | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.067 |
| 24HO0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANDUONG - SITIO LAWAAN PA | Region VII | Cebu 7th DEO | On-Going | ₱57.8M | 99% | High risk82 | Flagged0.034 |
| 23HO0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, MALABUYOC SECTION, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 0% | High risk74 | Flagged0.062 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 24HC0157BIP- PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATERWORKS SYSTEM, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.4M | 52% | High risk70 | Flagged0.010 |
| 22HN0069CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DAY-AS-BANGBANG COASTAL ROAD, CORDOBA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱49M | 100% | High risk69 | —-0.031 |
| 24H00032CSSP, SUSTAINABLE INFRASTRUCTURE PROJ. ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, BARANGAY SUBANGDAKU,MANDAUE CITY, CEBU (PACKAGE II) | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk67 | —-0.013 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0262ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM LEFT SIDE), ALEGRIA, C | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.077 |
| 23HO0284CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TALAYONG SECTION, | Region VII | Cebu 7th DEO | On-Going | ₱115.7M | 0% | High risk86 | Flagged0.073 |
| 23HO0279CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER, SITIO TUBOD, BARANGAY BANA | Region VII | Cebu 7th DEO | On-Going | ₱67.4M | 0% | High risk82 | Flagged0.067 |
| 23HO0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, MALABUYOC SECTION, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 0% | High risk74 | Flagged0.062 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
| 24HO0178CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANDUONG - SITIO LAWAAN PA | Region VII | Cebu 7th DEO | On-Going | ₱57.8M | 99% | High risk82 | Flagged0.034 |
| 25H00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG OREL CREEK (PHASE 2), BARANGAY BANILAD, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱98.9M | 0% | High risk66 | Flagged0.034 |
| 25HN0137CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775) | Region VII | Cebu 6th DEO | On-Going | ₱141.9M | 83% | High risk96 | Flagged0.030 |
| 25HN0127SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱94.6M | 72% | High risk96 | Flagged0.026 |
| 24HO0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DIKE AT VALENCIA RIVER (DOWNSTREAM RIGHT SIDE) PAC | Region VII | Cebu 7th DEO | On-Going | ₱72.3M | 90% | High risk64 | Flagged0.025 |
| 24H00019CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 95% | High risk72 | Flagged0.025 |
| 24H00169LGU HOSPITALS-LAPU LAPU CITY HOSPITAL, CEBU | Region VII | Region VII | On-Going | ₱14.8M | 0% | Medium risk45 | Flagged0.020 |
| 25H00061CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BECERRIL, BOLJOON, CEBU | Region VII | Region VII | On-Going | ₱4.9M | 67% | High risk93 | Flagged0.020 |
| 24H00133CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | Region VII | On-Going | ₱192.8M | 0% | High risk64 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 24NB0093INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NJR BAHBAH-TALACOGON ROAD - K1294+(-499) - K1300+000, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 100% | Medium risk51 | Flagged0.015 |
| 24NB0095INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ BAYUGAN-ESPERANZA ROAD - K1270+(-976) - K1276+221, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | On-Going | ₱96.4M | 100% | Medium risk53 | Flagged0.012 |
| 23H00058OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Region VII | On-Going | ₱173.5M | 52% | High risk67 | Flagged0.011 |
| 24HC0157BIP- PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATERWORKS SYSTEM, UBAY, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱49.4M | 52% | High risk70 | Flagged0.010 |
| 25HO0154CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG ALEGRIA RIVER (DOWNSTREAM, RI | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 4% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 25HD0101ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - CONST/UPGRADING/REHAB OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0033+935 -K0034+141, CITY OF CARCAR, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.097 |
| 127 | 24HN0067CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG MACTAN CIRCUMFERENTIAL RD (S0020LP) - K0034 + 775 - K0035 + 702, LAPU-LAPU, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.097 |
| 128 | 24HN0019CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF STREET LIGHTS ALONG CEBU NORTH HAGNAYA WHARF RD-K0011 + 657-K0014 + 505 AND CONSOLACION-TAYUD-LILOAN RD-K0014 + (-470) - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.096 |
| 129 | 24HN0066CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG MACTAN CIRCUMFERENTIAL RD (S0020LP) - K0014 + 073 - K0015 + 076, LAPU-LAPU, CEBU | Region VII | Cebu 6th DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.097 |
| 130 | 25HD0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LINAO - LIPATA, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.098 |
| 131 | 24HN0148CONSTRUCTION OF 4-STOREY, 12-CLASSROOM SCHOOL BUILDING IN MAGUIKAY ELEMENTARY SCHOOL, BARANGAY MAGUIKAY, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱19.9M | 100% | Medium risk46 | —-0.053 |
| 132 | 25HN0093SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, BARANGAY CUBACUB, MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱11.7M | 100% | Medium risk46 | —-0.097 |
| 133 | 24HN0035CSSP: SPECIAL ROAD FUND - MVUC AS PER R.A. 11239 - INSTALLATION OF STREET LIGHTS ALONG PILIPOG-GABI COASTAL ROAD - STA. 0 +000.00 - STA. 2 + 980.00 AND BANGBANG-SAN MIGUEL COASTAL ROAD - STA. 0 + 000.00 - STA. 0 + 450.00, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱11.6M | 100% | Medium risk46 | —-0.095 |
| 134 | 24H00169LGU HOSPITALS-LAPU LAPU CITY HOSPITAL, CEBU | Region VII | Region VII | On-Going | ₱14.8M | 0% | Medium risk45 | Flagged0.020 |
| 135 | 23HB0031ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES DAHILI BR. (B00096BH) ALONG JCT DAT-AN-CARMEN-SIERRA BULLONES -PILAR-ALICIA RD. KO084+942.00, ALICIA, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱14.7M | 100% | Medium risk45 | —-0.055 |
| 136 | 23HB0017ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES PAGINA BR. 2 (B00051BH) ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) KO197+772.00 | Region VII | Bohol 3rd DEO | Completed | ₱10.6M | 100% | Medium risk45 | —-0.054 |
| 137 | 24HB0052ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - MALINAO BR. (B00068BH) ALONG TAGBILARAN EAST RD (TAGBILARAN-JAGNA) KO228+908 | Region VII | Bohol 3rd DEO | Completed | ₱5.8M | 100% | Medium risk45 | —-0.057 |
| 138 | 24HB0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM BUILDING) LOAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱14.8M | 100% | Medium risk44 | —-0.091 |
| 139 | 22HB0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE / FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY POBLACION, BILAR, BOHOL SECTION | Region VII | Bohol 3rd DEO | Completed | ₱32.3M | 100% | Medium risk44 | —-0.075 |
| 140 | 24HB0131CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTER, BRGY. KATIPUNAN, CARMEN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱11.8M | 100% | Medium risk43 | —-0.092 |
| 141 | 24HB0147CONVERGENCE & SPECIAL SUPPORT PROGRAM - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF EVACUATION CENTER, BARANGAY ILAUD, PILAR, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱7.8M | 100% | Medium risk43 | —-0.094 |
| 142 | 24HB0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF EVACUATION CENTER AMBASSADOR PABLO SUAREZ NATIONAL HIGH SCHOOL, BARANGAY BICAO, CARMEN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱6.8M | 100% | Medium risk43 | —-0.094 |
| 143 | 22HB0145REPAIR/REHABILITATION OF FLOOD CONTROL TABAJAN, GUINDULMAN, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱27.6M | 100% | Medium risk43 | —-0.076 |
| 144 | 24HC0057BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF UBAY FLOOD CONTROL STRUCTURE, BARANGAY BONGBONG- BARANGAY SAN PASCUAL, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱39.6M | 100% | Medium risk43 | —-0.074 |
| 145 | 24NB0069CONSTRUCTION OF GIBONG RIVER BANK PROTECTION ALONG BARANGAY LA SUERTE, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱57.9M | 100% | Medium risk42 | —-0.063 |
| 146 | 23HN0125CONCRETING OF BRGY. GARING FMR, BRGY. GARING, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.044 |
| 147 | 23HK0165CONSTRUCTION (COMPLETION) IF MULTI-PURPOSE BUILDING, BRGY. BASAK, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱7.2M | 100% | Medium risk35 | —-0.043 |
| 148 | 22HG0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES | Region VII | Cebu 2nd DEO | Completed | ₱3M | 100% | Medium risk30 | —-0.056 |
| 149 | 22HG0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR SYSTEM | Region VII | Cebu 2nd DEO | Completed | ₱4.4M | 100% | Medium risk30 | —-0.056 |
| 150 | 22HE0025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - MANANGA BR. 1 (B00073CB) ALONG N BACALSO AVE (CEBU SOUTH RD), TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱2.9M | 100% | Low risk23 | —-0.060 |