Contractor dossier
296 projects on file, including joint ventures this contractor is part of.
Total projects
296
Total budget
₱9.1B
Average progress
86.5%
Completion rate
65.5%
Below 70%
Average risk score
56.9
Medium risk on average, out of 100
Flagged as unusual
35
11.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 290 | ₱8.9B | 57.0 | 34 | 86.3% |
| Negros Island Region | 3 | ₱200.3M | 56.7 | 0 | 100.0% |
| Region VII | 3 | ₱36.8M | 49.0 | 1 | 92.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 204 | ₱6.5B | 54.5 | 3 | 91.0% |
| Buildings and Facilities | 43 | ₱941.4M | 47.9 | 3 | 89.0% |
| OTHER | 12 | ₱509.8M | 81.1 | 11 | 71.4% |
| GAA 2025 OO-1 | 11 | ₱587.7M | 93.0 | 11 | 31.5% |
| Flood Control and Drainage | 9 | ₱264.4M | 54.5 | 0 | 91.1% |
| GAA 2025 SSP | 5 | ₱132.7M | 94.3 | 5 | 52.5% |
| Water Provision and Storage | 5 | ₱78.3M | 50.6 | 0 | 100.0% |
| Bridges | 4 | ₱63.8M | 53.1 | 1 | 59.3% |
| GAA 2025 OO-2 | 2 | ₱29.4M | 87.0 | 1 | 57.6% |
| Bridges, Roads | 1 | ₱49M | 58.2 | 0 | 51.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JG0026BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, PUROK YACAL - PUROK ACACIA, BARANGAY WALING-WALING, VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱9.9M | 52% | High risk95 | Flagged0.027 |
| 25JG0015ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY GAWIL TO BARANGAY BOLISONG, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱49M | 67% | High risk94 | Flagged0.023 |
| 25J00052NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (TUCURAN JCT - KAROMATAN JCT RD) | Region IX | Region IX | On-Going | ₱153M | 31% | High risk94 | Flagged0.028 |
| 25J00107ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO - PA-GADIAN - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱91.3M | 18% | High risk94 | Flagged0.024 |
| 25JE0015BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY BANALE, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱4.9M | 65% | High risk94 | Flagged0.020 |
| 25JE0010SUSTAINABLE INFASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, BARANGAY NANGAN- NANGAN- BARANGAY LISON VALLEY- BARANGAY LOURDES- BARANGAY LOWER SIBATANG- NRJ BARANGAY MACASING, TIGBAO AND PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱39.2M | 62% | High risk94 | Flagged0.024 |
| 25J00059ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱90.9M | 23% | High risk94 | Flagged0.020 |
| 25J00020CONSTRUCTION OF BY-PASS & DIVERSION ROADS - SOMINOT - MAHAYAG ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱47.2M | 41% | High risk94 | Flagged0.011 |
| 25JG0038CONSTRUCTION OF MULTI-PURPOSE BUILDING, TIGBAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱29.7M | 17% | High risk94 | Flagged0.035 |
| 25JE0047NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- PRIMARY ROADS JCT. AURORA- JCT. MONTE ALEGRE- JCT. LABANGAN ROAD K1655+187- K1655+975 | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱38.6M | 13% | High risk93 | Flagged0.019 |
| 25J00055ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱35.9M | 10% | High risk93 | Flagged0.019 |
| 25JE0041NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- PRIMARY ROADS JCT. AURORA- JCT. MONTE ALEGRE- JCT. LABANGAN RD. K1650+939- K1652+000, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱37.8M | 66% | High risk93 | Flagged0.007 |
| 25J00113CONSTRUCTION OF MISSING LINKS/NEW ROADS - MIDSALIP - BU-BOAN ROAD, MIDSALIP, ZAMBOANGA DEL SUR 1ST LD (PACKAGE 2) | Region IX | Region IX | On-Going | ₱43.4M | 40% | High risk93 | Flagged0.010 |
| 25J00025CONSTRUCTION OF MISSING LINKS/ NEW ROADS - MIDSALIP - BUBOAN ROAD, BAYOG, ZAMBOANGA DEL SUR 2ND PACKAGE 2 | Region IX | Region IX | On-Going | ₱27.3M | 77% | High risk92 | Flagged0.002 |
| 25J00019ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (TUCURAN JCT - KAROMATAN JCT ROAD), K 1648+(-262).00 TO K 1648+045.00 | Region IX | Region IX | On-Going | ₱12.6M | 21% | High risk92 | Flagged0.015 |
| 25JE0078ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS EASTERN BOBONGAN - SOMINOT - MIDSALIP RD. (2) K1679+677 - K1679+729, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱9.8M | 7% | High risk90 | Flagged0.018 |
| 25JE0071CONCRETING OF BRGY. SANTO ROSARIO FMR, BRGY. SANTO ROSARIO, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱14.9M | 51% | High risk88 | Flagged0.058 |
| 25JE0072CONCRETING OF BRGY. DEBOROK FMR, BRGY. DEBOROK, PAGADIAN, ZAMBOANGA DEL SUR, PAGADIAN CITY, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱14.9M | 25% | High risk88 | Flagged0.065 |
| 24J00246CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, ZAMBOANGA DEL SUR 1ST DISTRICT SUPER HEALTH CENTER | Region IX | Region IX | On-Going | ₱11.9M | 66% | High risk87 | Flagged0.054 |
| 25JG0037FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SABO DAM UPSTREAM PORTION OF DIVERSION STRUCTURES, SAN PABLO CIS, SAN PABLO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱14.7M | 100% | High risk87 | —-0.018 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JE0072CONCRETING OF BRGY. DEBOROK FMR, BRGY. DEBOROK, PAGADIAN, ZAMBOANGA DEL SUR, PAGADIAN CITY, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱14.9M | 25% | High risk88 | Flagged0.065 |
| 25JE0071CONCRETING OF BRGY. SANTO ROSARIO FMR, BRGY. SANTO ROSARIO, RAMON MAGSAYSAY, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱14.9M | 51% | High risk88 | Flagged0.058 |
| 25JE0084CONSTRUCTION OF SCHOOL BUILDING, DULOP NATIONAL HIGH SCHOOL, BARANGAY DULOP, MUNICIPALITY OF DUMINGAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱9.9M | 42% | High risk86 | Flagged0.057 |
| 24J00246CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RURAL HEALTH UNIT, ZAMBOANGA DEL SUR 1ST DISTRICT SUPER HEALTH CENTER | Region IX | Region IX | On-Going | ₱11.9M | 66% | High risk87 | Flagged0.054 |
| 24JE0082CONSTRUCTION OF 1 STOREY 2 CLASSROOM SCHOOL BUILDING IN BALAS NATIONAL HIGH SCHOOL, BARANGAY BALAS, MUNICIPALITY OF AURORA, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱5M | 100% | High risk82 | Flagged0.040 |
| 25JE0083CONSTRUCTION OF SCHOOL BUILDING, BOKONG NATIONAL HIGH SCHOOL, BARANGAY BOKONG, MUNICIPALITY OF LABANGAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱9.9M | 1% | Medium risk36 | Flagged0.039 |
| 25JG0038CONSTRUCTION OF MULTI-PURPOSE BUILDING, TIGBAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱29.7M | 17% | High risk94 | Flagged0.035 |
| 23J00087CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LABANGAN - PAGADIAN CITY - DUMALINAO BY-PASS ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱97.1M | 65% | High risk82 | Flagged0.030 |
| 25J00052NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (TUCURAN JCT - KAROMATAN JCT RD) | Region IX | Region IX | On-Going | ₱153M | 31% | High risk94 | Flagged0.028 |
| 25JG0026BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, PUROK YACAL - PUROK ACACIA, BARANGAY WALING-WALING, VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱9.9M | 52% | High risk95 | Flagged0.027 |
| 25J00107ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO - PA-GADIAN - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱91.3M | 18% | High risk94 | Flagged0.024 |
| 25JE0010SUSTAINABLE INFASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD, BARANGAY NANGAN- NANGAN- BARANGAY LISON VALLEY- BARANGAY LOURDES- BARANGAY LOWER SIBATANG- NRJ BARANGAY MACASING, TIGBAO AND PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱39.2M | 62% | High risk94 | Flagged0.024 |
| 25JG0015ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY GAWIL TO BARANGAY BOLISONG, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱49M | 67% | High risk94 | Flagged0.023 |
| 24J00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LABANGAN-PAGADIAN CITY-DUMALINAO BY-PASS ROAD PACKAGE I, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱144.3M | 80% | High risk82 | Flagged0.023 |
| 25JG0004CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) ALONG REBOKON-PALARAN-TUBO PAIT-SACBULAN-SENIOR-SAGASAN ROAD LEADING TO SAN PABLO POR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱101.1M | 52% | High risk82 | Flagged0.022 |
| 25JE0015BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION OF ROAD, BARANGAY BANALE, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱4.9M | 65% | High risk94 | Flagged0.020 |
| 24JE0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ROAD BOGO CALABAT- DONTULAN- PARASAN, MOLAVE, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱96.4M | 57% | High risk68 | Flagged0.020 |
| 25J00059ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱90.9M | 23% | High risk94 | Flagged0.020 |
| 25JE0047NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- PRIMARY ROADS JCT. AURORA- JCT. MONTE ALEGRE- JCT. LABANGAN ROAD K1655+187- K1655+975 | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱38.6M | 13% | High risk93 | Flagged0.019 |
| 22J00030CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SOMINOT - DUMINGAG ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱67M | 100% | High risk80 | Flagged0.019 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 22JE0006BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, BARANGAY UPPER PULACAN, OLD BARANGAY HALL, MUNICIPALITY OF LABANGAN, ZAMBONGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.084 |
| 252 | 25JE0014CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, NRJ TO BRGY. KAHAYAGAN WEST- BRGY. PASINGKALAN IN SUPPORT TO VIRGIN COCONUT OIL PROCESSING, AURORA AND RAMON MAGSAYSAY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.082 |
| 253 | 24JE0027CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES NRJ TO BRGY. SAN JUAN, AURORA- BRGY. MAN- ILAN IN SUPPORT TO TUKURAN COCO ACTIVATED CARBON, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.083 |
| 254 | 23JE0065BIP- MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI- PURPOSE BUILDING JOSEFINA, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk50 | —-0.082 |
| 255 | 25JE0004CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES NRJ TO BRGY. SAN JUAN, AURORA- BRGY. MAN- ILAN, IN SUPPORT OF TUKURAN COCO ACTIVATED CARBON, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | On-Going | ₱4.9M | 100% | Medium risk50 | —-0.057 |
| 256 | 24JE0021CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES NRJ TO BRGY. KAHAYAGAN WEST- BRGY. PASINGKALAN IN SUPPORT TO VIRGIN COCONUT OIL PROCESSING, AURORA AND RAMON MAGSAYSAY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.082 |
| 257 | 21JE0062CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO PHILIPPINE EAGLE SANCTUARY, BRGY. DAKAYAKAN, MIDSALIP, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.083 |
| 258 | 23JE0080CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF LABANGAN, PROVINCE OF ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.045 |
| 259 | 24JE0085BIP- MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. STO. NIÑO, TUKURAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk50 | —-0.082 |
| 260 | 23JE0079CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MOLAVE, PROVINCE OF ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.8M | 100% | Medium risk50 | —-0.043 |
| 261 | 21JE0004CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS NRJ LEADING TO BALAS RIVER CRUISE, BRGY. BALAS, AURORA, ZAMBOANGA DEL SUR, BRGY. BALAS, AURORA, ZAMBOANGA DEL SUR. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.083 |
| 262 | 20JG0026REHABILITATION OF MULTI-PURPOSE BUILDING, POBLACION, LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.084 |
| 263 | 23JG0042CONSTRUCTION OF MULTI-PURPOSE BUILDING AT DPWH ZAMBOANGA DEL SUR 2ND DEO, POBLACION, GUIPOS, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.081 |
| 264 | 20JG0064CONSTRUCTION OF COVERED COURT AT BRGY. POBLACION, LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.084 |
| 265 | 20HL0017NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS : DUMAGUETE SOUTH ROAD - K0040 + 628 - K0041 + 775, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱41.2M | 100% | Medium risk46 | —-0.088 |
| 266 | 22JE0076CONCRETING OF BRGY. SEBUKANG FMR, BRGY. SEBUKANG, JOSEFINA, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.037 |
| 267 | 20JG0088CONCRETING OF BRGY. POBLACION FMR, BRGY. POBLACION DIMATALING, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.033 |
| 268 | 25HC0045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS: LOAY INTERIOR RD- K0122+020-K0122+070, TRINIDAD, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱14.6M | 100% | Medium risk44 | —-0.095 |
| 269 | 21JG0101CONCRETING OF BRGY. BUBURAY TO BRGY. BALANAGAN FMR, BRGY. BUBURAY AND BRGY. BALANAGAN, DIMATALING, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱8.8M | 100% | Medium risk43 | —-0.033 |
| 270 | 23JE0068CONCRETING OF BRGY. KAANGAYAN FMR, BRGY. KAANGAYAN, MAHAYAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱12.9M | 100% | Medium risk43 | —-0.035 |
| 271 | 24JE0060CONCRETING OF BRGY. DIMASANGCA FMR, BRGY. DIMASANGCA, LABANGAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk43 | —-0.037 |
| 272 | 20JE0098CONCRETING OF BRGY. LA SUERTE FMR, BRGY. LA SUERTE, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk43 | —-0.037 |
| 273 | 21JE0094CONCRETING OF BRGY. MANGA TO BRGY. BOGO FMR, BRGY. MANGA, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱11.8M | 100% | Medium risk43 | —-0.036 |
| 274 | 23JE0072CONCRETING OF SITIO LUMATAW, BRGY. GUBANG FMR, BGRY. GUBANG, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱11.9M | 100% | Medium risk43 | —-0.036 |
| 275 | 23JE0062CONCRETING OF BRGY. BAGALUPA FMR, BRGY. BAGALUPA, LABANGAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.036 |