Contractor dossier
75 projects on file, including joint ventures this contractor is part of.
Total projects
75
Total budget
₱340.1M
Average progress
91.4%
Completion rate
66.7%
Below 70%
Average risk score
42.3
Medium risk on average, out of 100
Flagged as unusual
8
10.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 75 | ₱340.1M | 42.3 | 8 | 91.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 55 | ₱250.6M | 37.4 | 1 | 92.9% |
| Roads | 9 | ₱32M | 33.7 | 0 | 99.6% |
| GAA 2025 SSP | 6 | ₱32.9M | 95.9 | 6 | 64.7% |
| Flood Control and Drainage | 3 | ₱12.3M | 41.1 | 0 | 100.0% |
| OTHER | 1 | ₱9.9M | 85.8 | 1 | 61.6% |
| Water Provision and Storage | 1 | ₱2.3M | 28.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0077BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DASSUN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 72% | High risk97 | Flagged0.013 |
| 25BD0165BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SOLANA, CAGAYAN - PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 91% | High risk97 | Flagged0.007 |
| 25BD0072BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY FURAGUI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 40% | High risk97 | Flagged0.023 |
| 25BD0164SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CSU CARIG, TUGUEGARAO CITY, CAGAYAN - PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱9.6M | 6% | High risk96 | Flagged0.036 |
| 25BD0171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS AND DRAINAGES AT MUNICIPALITY OF SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱6.7M | 80% | High risk96 | Flagged0.011 |
| 25BD0117BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, LANNA ELEMENTARY SCHOOL, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 100% | High risk93 | Flagged0.002 |
| 24BD0198CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING (PHASE 1) IN LAGUM INEGRATED SCHOOL, BARANGAY NABBABALAYAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.9M | 62% | High risk86 | Flagged0.058 |
| 25BD0155BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING(CONVERTIBLE TO EVACUATION CENTER), BARANGAY CENTRO SOUTHEAST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 0% | High risk68 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BD0198CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING (PHASE 1) IN LAGUM INEGRATED SCHOOL, BARANGAY NABBABALAYAN, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱9.9M | 62% | High risk86 | Flagged0.058 |
| 25BD0164SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CSU CARIG, TUGUEGARAO CITY, CAGAYAN - PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱9.6M | 6% | High risk96 | Flagged0.036 |
| 25BD0072BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY FURAGUI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 40% | High risk97 | Flagged0.023 |
| 25BD0077BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DASSUN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 72% | High risk97 | Flagged0.013 |
| 25BD0171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS AND DRAINAGES AT MUNICIPALITY OF SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱6.7M | 80% | High risk96 | Flagged0.011 |
| 25BD0165BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SOLANA, CAGAYAN - PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 91% | High risk97 | Flagged0.007 |
| 25BD0155BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING(CONVERTIBLE TO EVACUATION CENTER), BARANGAY CENTRO SOUTHEAST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.8M | 0% | High risk68 | Flagged0.004 |
| 25BD0117BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDING, LANNA ELEMENTARY SCHOOL, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱1.9M | 100% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24BD0128BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF SENIOR CITIZEN BUILDING, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱5M | 100% | Medium risk53 | —-0.047 |
| 27 | 25BD0100BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY NANUCCAUAN, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk53 | —-0.018 |
| 28 | 24BD0091BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. CAMPO, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk53 | —-0.084 |
| 29 | 22BD0028SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY PALACU, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱6.9M | 100% | Medium risk52 | —-0.085 |
| 30 | 24BD0013BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. DASSUN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱5M | 84% | Medium risk52 | —-0.038 |
| 31 | 24BD0146BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. DUMPAO, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱5M | 100% | Medium risk52 | —-0.083 |
| 32 | 24BD0034BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. ANQUIRAY, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱5M | 100% | Medium risk52 | —-0.084 |
| 33 | 22BD0019BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF CONCEPCION MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱5M | 100% | Medium risk52 | —-0.085 |
| 34 | 23BD0061BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF DRAINAGE AT PENGUE RUYU AND CAGGAY, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.068 |
| 35 | 24BD0203BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DRAINAGE, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.069 |
| 36 | 24BD0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BRGY. CATTARAN, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.084 |
| 37 | 25BD0014CSSP-CONST./IMP. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES - ROLL-IT) JUNCTION SANTIAGO-TUGUEGARAO ROAD-DIVISORIA-KAPITAN MARTIN LEADING TO CAGAYAN ROBINA SUGAR MILLING COMPANY (CARSUMCO) AND AGRI-BUSINESS INDUSTRY, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 96% | Medium risk46 | —-0.055 |
| 38 | 25BD0015CSSP-CONST./IMP.OF ACCESS RDS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-JUNCTION SANTIAGO-TUGUEGARAO ROAD-MAGALALAG-ABA-SAN MIGUEL-ROMA LEADING TO CAGAYAN ROBINA SUGAR MILLING COMPANY (CARSUMCO) AND AGRI-BUSINESS INDUSTRY, ENRILE, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.058 |
| 39 | 23BD0142BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BULAGAO PUROK 5 TO SITIO TURUD ROAD, TUAO, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.082 |
| 40 | 22BB0088CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BARANGAY ROAD AT BARANGAY BACAGAN, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.082 |
| 41 | 21BD0127LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING (WITH GROUND IMPROVEMENT), CARIG, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.6M | 100% | Medium risk33 | —-0.084 |
| 42 | 25BD0049BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LANNA, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱2.9M | 100% | Medium risk32 | —-0.056 |
| 43 | 25BD0054BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BANGAG, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱2.9M | 100% | Medium risk32 | —-0.056 |
| 44 | 23BD0017BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MEDIATION CENTER, HALL OF JUSTICE, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱3.9M | 100% | Medium risk31 | —-0.084 |
| 45 | 24BD0092BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI- PURPOSE BUILDING, BRGY. MAGUIRIG, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱3M | 91% | Medium risk31 | —-0.042 |
| 46 | 23BD0067SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI- PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF BRGY. LINAO MULTI- PURPOSE BUILDING, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.9M | 100% | Medium risk31 | —-0.085 |
| 47 | 22BD0077BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF ABOLO MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.9M | 100% | Medium risk31 | —-0.084 |
| 48 | 23BD0113BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY CENTRO NORTHEAST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.5M | 100% | Low risk29 | —-0.085 |
| 49 | 24BD0202CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION/COMPLETION OF DRAINAGE, BRGY. AJAT, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.5M | 100% | Low risk29 | —-0.068 |
| 50 | 23BD0083BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY MAGUIRIG, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱2.5M | 100% | Low risk29 | —-0.085 |