Contractor dossier
233 projects on file, including joint ventures this contractor is part of.
Total projects
233
Total budget
₱8.3B
Average progress
98.9%
Completion rate
93.1%
Average risk score
43.9
Medium risk on average, out of 100
Flagged as unusual
10
4.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 233 | ₱8.3B | 43.9 | 10 | 98.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 82 | ₱4.6B | 52.0 | 4 | 98.1% |
| Buildings and Facilities | 66 | ₱342.4M | 27.5 | 0 | 99.9% |
| Bridges | 41 | ₱1.3B | 46.2 | 5 | 97.9% |
| Flood Control and Drainage | 39 | ₱1.6B | 49.7 | 1 | 99.8% |
| Bridges, Roads | 4 | ₱388.5M | 59.8 | 0 | 100.0% |
| OTHER | 1 | ₱44.1M | 78.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19IB0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO PANINIHI-AN ISLAND AND BARANGITAW BEACH, SULAT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱44.1M | 100% | High risk78 | —-0.030 |
| 17IL0040LILO-AN-SAN RICARDO CIRCUMFERENTIAL ROAD (SAN RAMON SECTION), INCLUDING BRIDGES, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.049 |
| 18IB0084CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURIST DESTINATIONS BORONGAN - LLORENTE CLOSED CANOPY AREA, BRGY. SAN GABRIEL - BRGY. TAGASLIAN - BRGY. DEL PILAR INCLUDING BRIDGE, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱194M | 100% | High risk66 | —-0.035 |
| 18I00015ROAD WIDENING - PRIMARY ROADS: PALO - CARIGARA - ORMOC ROAD, KO919+247.92 - KO921+514; KO921+538 - KO926+407, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱192.2M | 100% | High risk65 | —-0.059 |
| 18IL0010CONSTRUCTION OF CONCRETE BRIDGE, LILOAN-SAN RICARDO CIRCUMFERENTIAL ROAD, VIADUCT, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱168.9M | 100% | High risk65 | —-0.014 |
| 21IL0042NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS / NEW ROADS LILOAN - SAN RICARDO CIRCUMFERENTIAL ROAD (CONSTRUCTION OF VIADUCT), SOUTHERN LEYTE, SAN RICARDO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱144.8M | 100% | High risk65 | —-0.030 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 19I00151REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. PINGAN, GEN. MAC ACTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱99.1M | 100% | High risk63 | —-0.021 |
| 18I00036CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 0+720 - STATION 0+982, SECTION 5 PHASE 8, BRGY. COGON, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱101.1M | 100% | High risk63 | —-0.053 |
| 20I00073CONSTRUCTION OF FLOOD CONTROL WALL ALONG MAINIT RIVER, PHASE 2, BRGY. CAVITE, ALANGALANG, LEYTE | Region VIII | Region VIII | Completed | ₱95.1M | 100% | High risk63 | —-0.071 |
| 17IL0005CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SUBA SECTION,STA. 4+640-STA. 5+600, SUBA, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SUBA, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47M | 100% | High risk63 | —-0.051 |
| 19I00146REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPES COLLAPSED AND LANDSLIDE ALONG BRGY. STA. FE, GEN. MAC ARTHUR, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱95.8M | 100% | High risk62 | —-0.025 |
| 20I00015NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - STA. FE - SAN MIGUEL ROAD, LEYTE | Region VIII | Region VIII | Completed | ₱135.1M | 100% | High risk62 | —-0.067 |
| 17IL0001CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, HIBOD-HIBOD SECTION, STA. 3+720 - STA 4+600, HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE LONE DISTRICT, BRGY. HIBOD-HIBOD, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱46.7M | 100% | High risk62 | —-0.051 |
| 18IB0054OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD (S00167SM), K0898+100 - K0898+480; K0909+000 - K0910+710; K0910+1058 - K0911+010; K0911+174 - K0911+330; K0911+351 - K0912+274; K0912+288 - K0912+732; K0912+844 - K0913+344 | Region VIII | Eastern Samar DEO | Completed | ₱94.7M | 100% | High risk61 | —-0.084 |
| 22IB0117CONSTRUCTION OF ROAD, CANYUPAY - BAGONG BARRIO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.081 |
| 17IL0002CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, KANANGKAAN SECTION, STA. 7+920-STA. 8+760, KANANGKAAN, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. KANANGKAAN, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱43.9M | 100% | High risk61 | —-0.050 |
| 21I00055CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF JUNCTION NATIONAL ROAD, CAROLINA-CAN-AVID-DOLORES-MASLOG ROAD (BARANGAY AROGANGA - BARANGAY MAGSA.......DOLORES, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱125.9M | 100% | High risk61 | —-0.076 |
| 20IB0003REHABILITATION/RECONSTRUCTIONO F ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD BORONGAN - GUIUAN ROAD, K0980+450 - K0980+665 | Region VIII | Eastern Samar DEO | Completed | ₱92.9M | 100% | High risk61 | —-0.084 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19I00137REPAIR/REHABILITATION OF BRGY. BAYBAY POB. FLOOD CONTROL, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱30M | 93% | Medium risk50 | Flagged0.045 |
| 19I00136RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO - BRGY. SAN JUAN FARM-TO-MARKET ROAD, STA. 1+900 - STA. 3+257, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.9M | 59% | Medium risk49 | Flagged0.040 |
| 19I00135RE-OPENING/IMPROVEMENT OF BRGY. DEL REMEDIO - BRGY. SAN MATEO FARM-TO-MARKET ROAD, STA. 0+000 - STA. 1+900, SULAT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱32.4M | 64% | Medium risk50 | Flagged0.038 |
| 17IL0056OPENING/CONSTRUCTION/REHABILITATION OF BRGY. MABICAY-BRGY. SAN PEDRO FMR (STA. 1+000 - STA. 1+620) AND (STA. 1+620 -STA. 3+800), BRGYS. MABICAY AND SAN PEDRO, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱47.5M | 100% | Medium risk57 | Flagged0.013 |
| 22IB0095REHABILITATION OF THE JIPAPAD DETOUR BRIDGE, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.5M | 43% | Medium risk53 | Flagged0.012 |
| 18IB0190CONSTRUCTION OF HINOLASO BRIDGE III INCLUDING ROAD COMPONENT, DOLORES, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk52 | Flagged0.009 |
| 22IB0089CONSTRUCTION OF NEW BRIDGES, PAGNAMITAN BR, ALONG GUIUAN - SULANGAN PENINSULA RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 99% | High risk61 | Flagged0.005 |
| 22IB0082REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE DOLORES BR. (B00516SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | On-Going | ₱49M | 72% | Medium risk53 | Flagged0.003 |
| 22IB0088CONSTRUCTION OF NEW BRIDGES, BIGO BR., ALONG ARTECHE - JIPAPAD - LAS NAVAS - RAWIS RD | Region VIII | Eastern Samar DEO | On-Going | ₱96.5M | 100% | High risk63 | Flagged0.003 |
| 17IL0038ROAD WIDENING-DAANG MAHARLIKA (LT) K1031+667-K1036+000, K1036+000-K1037+971, K1038+000-K1039+793, LIBAGON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱227.5M | 100% | Medium risk58 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18IL0035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/CONSTRUCTION OF HABAY FLOOD CONTROL ALONG LILO-AN-SAN RICARDO (S00218LT) HABAY, SAN FRANCISCO, SOUTHERN LEYTE (CONSTRUCTION OF FLOOD MITIGATION STRUCTURE) | Region VIII | Southern Leyte 1st DEO | Completed | ₱22.5M | 100% | Medium risk46 | —-0.077 |
| 152 | 20IB0070CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD, K0978+200 - K0979+100, BRGY. COTICOT, GIPORLOS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.077 |
| 153 | 20IB0048CONSTRUCTION OF FLOOD CONTROL STRUCTURES PROTECTING NATIONAL ROAD ALONG BORONGAN - GUIUAN ROAD, K0955+500 - K0996+600, BRGY. BATANG, HERNANI, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱32M | 100% | Medium risk46 | —-0.076 |
| 154 | 21IB0035CONSTRUCTION OF POBLACION MASLOG FLOOD CONTROL, MASLOG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱32.8M | 100% | Medium risk46 | —-0.078 |
| 155 | 18IL0047CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS/CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SAN MIGUEL SECTION, STA. 0+700-STA. 2+234, SOGOD, SOUTHERN LEYTE (CONSTRUCTION OF FLOOD MITIGATION STRUCTURE), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.079 |
| 156 | 17IB0068RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT 1.) SAN EDUARDO BRIDGE (B00525SM); 2.) CAJAGWAYAN BRIDGE II (B00547SM) ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱23.5M | 100% | Medium risk46 | —-0.032 |
| 157 | 20IB0015CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BORONGAN - GUIUAN ROAD, K01007+150 - K01008+200, GEN. MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱26.8M | 100% | Medium risk46 | —-0.075 |
| 158 | 20IB0065CONSTRUCTION OF FLOOD CONTROL ALONG VIGAN RIVER PROTECTING NATIONAL ROAD & BRIDGES, BRGY. VIGAN, GEN. MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.078 |
| 159 | 20IB0032CONSTRUCTION OF BRGY. RAWIS FLOOD CONTROL, ARTECHE, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.078 |
| 160 | 17IB0092RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES AT BINACALAN BRIDGE (B00502SM), ALONG JCT. BUENAVISTA-LAWAAN-MARABUT ROAD. | Region VIII | Eastern Samar DEO | Completed | ₱11.6M | 100% | Medium risk45 | —-0.035 |
| 161 | 17IL0022REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES CALAG-ITAN BRIDGE (B00460LT)ALONG JCT. HIMAY-ANGAN-SILAGO-ABUYOG BDRY. ROADHINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.033 |
| 162 | 20IB0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOBAGO RIVER PROTECTING NATIONAL ROAD AND BRIDGES, BRGY. MALOBAGO, DOLORES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱28.4M | 100% | Medium risk45 | —-0.078 |
| 163 | 18IL0148CONSTRUCTION OF 1 STY - 2 CL SCHOOL BUILDING @ SAN VICENTE PRIMARY SCHOOL (SCH. ID 122019), BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5.7M | 100% | Medium risk45 | —-0.053 |
| 164 | 18IL0118CONSTRUCTION OF 1 STY UNIQUE WORKSHOP SCHOOL BUILDING AT SOGOD NATIONAL HIGH SCHOOL (SCH. ID 303487), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5.2M | 100% | Medium risk45 | —-0.054 |
| 165 | 17IL0024REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES DAGSA BRIDGE (B00346LT)ALONG BDRY. SOUTHERN LEYTE-MAASIN-MACROHON-SOGOD-JCT DAANG MAHARLIKASOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱6.5M | 100% | Medium risk44 | —-0.031 |
| 166 | 17IL0018REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AG-AGAN BRIDGE (B00479LT)ALONG JCT HIMAY-ANGAN-SILAGO-ABUYOG BDRY. ROADSILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.031 |
| 167 | 17IL0029REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MINOYHO BRIDGE, (B00385LT) ALONG JCT. HIMAY-ANGAN-SILAGO-ABUYOG BDRY. RD SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱12.2M | 100% | Medium risk44 | —-0.032 |
| 168 | 17IL0031REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES PINAMUDLAN BRIDGE 1 (B00357LT)ALONG LILOAN-SAN RICARDO ROADSAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱6.8M | 100% | Medium risk43 | —-0.031 |
| 169 | 17IL0027REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MALIBAGO BRIDGE, (B00384LT) ALONG JCT. HIMAY-ANGAN-SILAGO-ABUYOG BDRY. RD ST. BERNARD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱7.8M | 100% | Medium risk43 | —-0.031 |
| 170 | 20IL0201CONCRETING OF HIGHWAY JUNCTION TO BRGY. ESPERANZA FMR BRGY. ESPERANZA, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱12.5M | 100% | Medium risk42 | —-0.044 |
| 171 | 19IL0083CONCRETING OF SITIO HUGPA, BRGY. POBLACION - BRGY. KAGINGKINGAN FMR, BRGY. POBLACION & BRGY. KAGINGKINGAN, ANAHAWAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.042 |
| 172 | 17IL0061CONCRETING OF BRGY. MAHALO - BRGY. MANIGAWONG FMR, BRGYS. MAHALO & MANINGAWONG, ANAHAWAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱4.7M | 100% | Medium risk39 | —-0.005 |
| 173 | 17IL0187CONSTRUCTION OF 3STY/6CL SCHOOL BUILDING, HINGATUNGAN NATIONAL HIGH SCHOOL (SCH. ID#303466), SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱14.7M | 100% | Medium risk37 | —-0.026 |
| 174 | 17IL0188CONSTRUCTION OF 3STY/6CL SCHOOL BUILDING, SILAGO NATIONAL VOCATIONAL HIGH SCHOOL (SCH. ID#303486), SILAGO, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱14.7M | 100% | Medium risk37 | —-0.026 |
| 175 | 18IL0109CONCRETING OF BRGY. SAN VICENTE-BRGY. PANCIL-BRGY. AURORA FMR, BRGYS. SAN VICENTE, PANCIL & AURORA, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱4.7M | 100% | Medium risk36 | —-0.041 |