Opening the dossier…
Opening the dossier…
Contractor dossier
199 projects on file, including joint ventures this contractor is part of.
Total projects
199
Total budget
₱20.5B
Average progress
97.2%
Completion rate
88.9%
Average risk score
49.9
Medium risk on average, out of 100
Flagged as unusual
10
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 193 | ₱19.9B | 49.7 | 10 | 97.1% |
| Region X | 6 | ₱620.9M | 55.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱7.8B | 47.0 | 1 | 96.7% |
| Flood Control and Drainage | 63 | ₱5.6B | 47.8 | 0 | 98.8% |
| Bridges | 45 | ₱4.9B | 48.4 | 1 | 98.1% |
| OTHER | 9 | ₱947.8M | 75.2 | 5 | 93.5% |
| Bridges, Roads | 6 | ₱914.8M | 52.1 | 0 | 97.5% |
| GAA 2025 OO-1 | 3 | ₱244M | 93.7 | 3 | 78.5% |
| GAA 2025 OO-2 | 1 | ₱144.6M | 92.4 | 0 | 83.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00161WAWA BR. (B00896MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱48.1M | 95% | High risk94 | Flagged0.001 |
| 25N00176SIMULAO BR. (B00928MN) ALONG DAANG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱47.9M | 58% | High risk94 | Flagged0.018 |
| 25N00158ESPERANZA BR. ALONG BAYUGAN-ESPERANZA RD (PHASE VIII) | Region XIII | Region XIII | On-Going | ₱147.9M | 82% | High risk94 | Flagged0.018 |
| 25N00258CONSTRUCTION OF RIVERBANK SLOPE PROTECTION (UPSTREAM) L/S, BARANGAY SACOL, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱144.6M | 84% | High risk92 | —-0.002 |
| 24N00076DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE- LAS NIEVES- SIBAGAT), PACKAGE E, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱147.6M | 95% | High risk80 | Flagged0.021 |
| 24N00021ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱147.2M | 96% | High risk80 | Flagged0.019 |
| 17N00073CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, NRJ DAANG MAHARLIKA (TAGUIBO SECTION) - MASAO PORT INCL. BRIDGE (BANZA BRIDGE), AGUSAN DEL NORTE 1ST LD. PACKAGE 2, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱144.4M | 100% | High risk79 | —-0.010 |
| 24N00162CABADBARAN-PUTING BATO- LANUZA ROAD, PACKAGE 10, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱96.5M | 100% | High risk79 | Flagged0.008 |
| 20N00020NRJ DAANG MAHARLIKA (TAGUIBO SECTION)-MASAO PORT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱106.1M | 100% | High risk79 | —-0.019 |
| 17N00034WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES, INCLUDING ROW, GUIHAO-AN BR. (B00871MN) ALONG BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS OR RD) (CONSTRUCTION OF PARALLEL BRIDGE), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱105.3M | 100% | High risk78 | Flagged0.000 |
| 25N00130ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱47.8M | 51% | High risk77 | Flagged0.011 |
| 24ND0027TUNGAO PARALLEL BR. ALONG BUTUAN CITY-MALAYBALAY RD | Region XIII | Butuan City DEO | Completed | ₱37M | 100% | High risk74 | —-0.025 |
| 20K00348CONSTRUCTION/ REHABILITATION OF CAGAYAN DE ORO RIVER BASINS, CALA-CALA SECTION, BRGY. MACASANDIG, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱268M | 100% | High risk63 | —-0.038 |
| 17NC0037CONSTRUCTION OF FLOOD CONTROL DIKE OF SIMULAO RIVER (0+110--0+300 UPSTREAM) & (0+017-0+057 DOWNSTREAM), BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.026 |
| 17N00155CONSTRUCTION OF FLOOD MITIGATION-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE I, PHASE I & II, URBAN DRAINAGE SYSTEM IN BUTUAN CITY, AGUSAN PEQUEÑO RIVER CHANNEL IMPROVEMENT, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱96.5M | 100% | High risk62 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00076DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE- LAS NIEVES- SIBAGAT), PACKAGE E, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱147.6M | 95% | High risk80 | Flagged0.021 |
| 24N00021ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱147.2M | 96% | High risk80 | Flagged0.019 |
| 25N00176SIMULAO BR. (B00928MN) ALONG DAANG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱47.9M | 58% | High risk94 | Flagged0.018 |
| 25N00158ESPERANZA BR. ALONG BAYUGAN-ESPERANZA RD (PHASE VIII) | Region XIII | Region XIII | On-Going | ₱147.9M | 82% | High risk94 | Flagged0.018 |
| 17N00108COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, BILAY-DULAG SECTION INCL. BRIDGE (AGUSAN BRIDGE) AND ROW, AGUSAN DEL NORTE, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱228.7M | 100% | Medium risk51 | Flagged0.011 |
| 25N00130ACCESS ROAD LEADING TO NASIPIT-AGUSAN DEL NORTE INDUSTRIAL ESTATE SPECIAL ECONOMIC ZONE (NANIE-SEZ), NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱47.8M | 51% | High risk77 | Flagged0.011 |
| 24N00162CABADBARAN-PUTING BATO- LANUZA ROAD, PACKAGE 10, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱96.5M | 100% | High risk79 | Flagged0.008 |
| 25N00161WAWA BR. (B00896MN) ALONG MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT) | Region XIII | Region XIII | On-Going | ₱48.1M | 95% | High risk94 | Flagged0.001 |
| 17N00170CONCRETING OF ROAD FROM 1ST BOX CULVERT (TALIGAMAN) TO BUGSUKAN ROAD SENTRO (EASTING) PAVED ROAD (PHASE 2), TALIGAMAN, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱48.2M | 100% | Medium risk46 | Flagged0.001 |
| 17N00034WIDENING OF PERMANENT BRIDGE TO MORE THAN 2 LANES, INCLUDING ROW, GUIHAO-AN BR. (B00871MN) ALONG BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS OR RD) (CONSTRUCTION OF PARALLEL BRIDGE), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱105.3M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17ND0040DREDGING/DESILTING AT MASAO RIVERMOUTH AND CONST. OF CUT-OFF CHANNEL AT MASAO RIVER, BUTUAN CITY, AGUSAN DEL NORTE 1ST LD | Region XIII | Butuan City DEO | Completed | ₱44.1M | 100% | Medium risk55 | —-0.035 |
| 27 | 25N00260CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER BASIN, PACKAGE 4, PROTECTING BARANGAY POBLACION, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.3M | 61% | Medium risk55 | —-0.009 |
| 28 | 25N00259CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER BASIN, PACKAGE 3, BARANGAY POBLACION, LAS NIEVES, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱149.3M | 62% | Medium risk55 | —-0.009 |
| 29 | 23N00178CONSTRUCTION OF BUGTA - BALATAKAN ROAD, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk55 | —-0.058 |
| 30 | 17NA0034CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM IMPROVEMENT OF STA. ANA RIVER, TUBAY, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱39.1M | 100% | Medium risk55 | —-0.047 |
| 31 | 22N00132CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG AGUSAN RIVER BASIN PROTECTIG BARANGAY POBLACION, LAS NIEVES, PACKAGE 1, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱173.7M | 100% | Medium risk55 | —-0.039 |
| 32 | 24N00085CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER BASIN PROTECTING BARANGAY POBLACION OF LAS NIEVES, PACKAGE 2, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱168.6M | 100% | Medium risk55 | —-0.042 |
| 33 | 17ND0028CONSTRUCTION OF LOWER AGUSAN RIVER BANK PROTECTION, BUTUAN CITY, AGUSAN DEL NORTE 1ST LD | Region XIII | Butuan City DEO | Completed | ₱46.4M | 100% | Medium risk54 | —-0.047 |
| 34 | 20N00084CONSTRUCTION/ IMPROVEMENT OF FLOOD MITIGATION STRUCTURES WITH RECHANNELIZATION ALONG ANDANAN RIVER BANK (DOWNSTREAM), BAYUGAN CITY, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱289.5M | 100% | Medium risk54 | —-0.019 |
| 35 | 17ND0051IMPROVEMENT OF TAGUIBO RIVERBANK PROTECTION, STA. 0+000-STA.0+200, BUTUAN CITY | Region XIII | Butuan City DEO | Completed | ₱24.1M | 100% | Medium risk54 | —-0.046 |
| 36 | 18N00039CONSTRUCTION OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, POBLACION - MAPASO ROAD LEADING TO MAPASO HOT AND COLD SPRINGS, INCL. BRIDGE, BRGY. LA PAZ, SANTIAGO, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱241.2M | 100% | Medium risk54 | —-0.024 |
| 37 | 17NC0005CONSTRUCTION OF SLOP/RIVER BANK PROTECTION OF BAHAYAN RIVER PROTECTION DAANG MAHARLIKA (AGUSAN-DAVAO SECTION) (BACK OF TRENTO BUS TERMINAL), 0+410.00 - 0+560.00, TRENTO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱46.5M | 100% | Medium risk54 | —-0.045 |
| 38 | 18N00049ROAD WIDENING, BUTUAN CITY-MASAO PORT RD-K1244+620-K1246+000, K1246+080-K1246+500, K1248+900 - K1251+216.65, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱171.6M | 100% | Medium risk54 | —-0.050 |
| 39 | 18N00061CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, NRJ DAANG MAHARLIKA (TAGUIBO SECTION) MASAO PORT, (PAGATPATAN-LUMBOCAN-MASAO SECTION), INCL. BRIDGE, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱154.8M | 100% | Medium risk54 | —-0.028 |
| 40 | 18N00023ROAD WIDENING, DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION) (S00339MN), K1131+500 - K1132+000, K1136+000 - K1136+127, K1136+176 - K1136+300, K1139+330 - K1139+447- K1141+778, K1148+000 - K1148+700, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱159.8M | 100% | Medium risk54 | —-0.060 |
| 41 | 22N00090CONSTRUCTION OF SLOPE PROTECTION STRUCTURES PROTECTING ABUTMENT OF BANZA BR. 3 ALONG BANZA- MAGALLANES ROAD, PACKAGE 1, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱168.9M | 100% | Medium risk54 | —-0.063 |
| 42 | 18N00038CONSTRUCTION OF MISSING LINKS, CABADBARAN - PUTING BATO - LANUZA ROAD, PACKAGE 1 AGUSAN DEL NORTE, CABADBARAN, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk54 | —-0.055 |
| 43 | 24N00187CONSTRUCTION OF JALIOBONG-SAN ISIDRO RIVER CONTROL PROJECT, KITCHARAO, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱241.2M | 100% | Medium risk54 | —-0.038 |
| 44 | 18N00026CONSTRUCTION OF BYPASS/DIVERSION ROADS, DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ - DEMOCRITO D. PLAZA II AVENUE-LAS NIEVES - SIBAGAT), PACKAGE 5, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.056 |
| 45 | 18N00093WIDENING OF PERMANENT BRIDGES, MANDACPAN BR. (B01670MN) ALONG MAYOR DEMOCRITO D. PLAZA II AVE., BUTUAN CITY | Region XIII | Region XIII | Completed | ₱148.3M | 100% | Medium risk53 | —-0.025 |
| 46 | 23N00085CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG JCT MONTILLA BOULEVARD-T. CALO STREET-NRJ BCIR TO MAIN LADP MAIN DRAINAGE CANAL (T. CALO-OCHOA SECTION), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.034 |
| 47 | 20N00023EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, BILAY- DULAG SECTION, (AGUSAN BRIDGE), BUTUAN CITY | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk52 | —-0.008 |
| 48 | 25N00192CONSTRUCTION OF SLOPE PROTECTION STRUCTURE PROTECTING ABUTMENT OF BANZA BRIDGE 3 ALONG BANZA-MAGALLANES ROAD, PACKAGE 2, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱143.8M | 100% | Medium risk52 | —-0.026 |
| 49 | 25N00095NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE, PACKAGE A | Region XIII | Region XIII | On-Going | ₱120.4M | 68% | Medium risk52 | —-0.005 |
| 50 | 17NC0033CONSTRUCTION OF SLOPE/BANK PROTECTION OF BAHAYAN RIVER PROTECTING SALVACION BRIDGE ALONG NRJ CUEVAS-BISLIG ROAD, K0+004.70-K0+074.70, TRENTO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱14M | 100% | Medium risk52 | —-0.035 |