Opening the dossier…
Opening the dossier…
Contractor dossier
56 projects on file, including joint ventures this contractor is part of.
Total projects
56
Total budget
₱5.1B
Average progress
98.0%
Completion rate
76.8%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
6
10.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 42 | ₱4B | 57.7 | 4 | 98.4% |
| Region X | 12 | ₱846.7M | 49.2 | 1 | 100.0% |
| Central Office | 2 | ₱261.6M | 76.8 | 1 | 78.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 40 | ₱3.3B | 53.8 | 1 | 98.7% |
| Bridges, Roads | 6 | ₱864.5M | 71.3 | 5 | 90.0% |
| OTHER | 3 | ₱161.5M | 74.6 | 0 | 100.0% |
| Bridges | 3 | ₱188.4M | 49.3 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱222.3M | 55.9 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱294.5M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17L00069WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON ROAD INCLUDING RROW, (BRGY. BUDA SECT.),DAVAO CITY 3RD L | Region XI | Region XI | Completed | ₱104.4M | 100% | High risk80 | —-0.013 |
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Central Office | Bridges Management Cluster | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 17Z00026BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP II), CONTRACT PACKAGE 12, KAY TIALO BRIDGE (BRGY. STO CRISTO, DEL MONTE NORZAGARAY ROAD, SAN JOSE DEL MONTE, BULACAN, REGION III | Central Office | Bridges Management Cluster | Terminated | ₱52.7M | 100% | High risk75 | —-0.024 |
| 17LD0029WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, QUINOKOL BR. (BO0122MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO ROAD, (DAVAO CITY-JCT. DIGOS SECT.), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱45.1M | 100% | High risk72 | —-0.026 |
| 17LD0033WIDENING OF PERMANENT BRIDGES TO MORE THAN 2 LANES, INAWAYAN BR. (BO1491MN) INCLUDING APPROACHES AND RROW ALONG DAVAO-COTABATO RD. (DAVAO CITY-JCT. DIGOS SECT.) (PHASE II), DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱12M | 100% | High risk72 | —-0.027 |
| 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 20L00083REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱132.5M | 98% | High risk68 | Flagged0.008 |
| 20L00084REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱130.9M | 95% | High risk68 | Flagged0.009 |
| 21L00093CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, BARANGAY RUPARAN, BARANGAY TRES DE MAYO, BARANGAY COGON, BARANGAY ZONE 1 & BARANGAY APLAYA, DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱173.4M | 100% | High risk66 | —-0.037 |
| 20L00055REPLACEMENT OF BRIDGE (2 INTO 4 LANES) - ANGALAN BRIDGE 3 (B00216MN) ALONG DAVAO - BUKIDNON ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱143.8M | 100% | High risk65 | —-0.020 |
| 18L00188CONST. OF CONCRETE ROAD-BYPASS ROAD AT JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (AL | Region XI | Region XI | Completed | ₱270.5M | 100% | High risk65 | —-0.042 |
| 18L00040CONC. OF JCT. PADADA (ALONG DIGOS-MAKAR RD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR RD) BYPASS RD, | Region XI | Region XI | Completed | ₱186.3M | 100% | High risk65 | —-0.057 |
| 18L00017WIDENING (2 INTO 4 LANES) OF DVO.-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT. | Region XI | Region XI | Completed | ₱137.4M | 100% | High risk64 | —-0.062 |
| 18K00149ROAD WIDENING OF BUKIDNON DAVAO CITY RD-K1606+987-K1608+271,K1608+315-K1611+000, BUKIDNON | Region X | Region X | Completed | ₱145.6M | 100% | High risk62 | —-0.067 |
| 18K00148ROAD WIDENING OF BUKIDNON-DAVAO CITY RD-K1592+203-K1597+300, BUKIDNON | Region X | Region X | Completed | ₱145M | 100% | High risk62 | —-0.068 |
| 22LB0274CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD - K1509+340 - K1509+440 | Region XI | Davao City DEO | On-Going | ₱94.6M | 58% | High risk62 | —-0.010 |
| 22L00077CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 1, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱116.7M | 98% | High risk62 | —-0.015 |
| 22L00078CONSTRUCTION OF CONCRETE ROAD - JCT. SULOP (ALONG DIGOS - MAKAR ROAD) WATERFALL - LABON - OSMEÑA - BANATE (ALONG DIGOS - MAKAR ROAD), PACKAGE 2, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱117.6M | 99% | High risk62 | —-0.016 |
| 22LD0093RECONSTRUCTION TO CONCRETE PAVEMENT-JCT. SULOP (ALONG DIGOS-MAKAR ROAD) WATERFALL-LABON-OSMEÑA-BANATE (ALONG DIGOS-MAKAR ROAD), PACKAGE 3, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Central Office | Bridges Management Cluster | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 20L00084REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE D, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱130.9M | 95% | High risk68 | Flagged0.009 |
| 20L00083REPLACEMENT OF BRIDGE-BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD)-KIBLAWAN-JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱132.5M | 98% | High risk68 | Flagged0.008 |
| 16KB0014CONCRETING OF BARANGAY MAGSAYSAY FARM TO MARKET, BARANGAY MAGSAYSAY, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱12.8M | 100% | Medium risk36 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22L00119ROAD WIDENING - BYPASS ROAD, JCT. PADADA (ALONG DIGOS-MAKAR ROAD) - KIBLAWAN - JCT. MALUNGON (ALONG DIGOS-MAKAR ROAD), DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱73.4M | 99% | Medium risk57 | —-0.023 |
| 27 | 20LD0021PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-ALONG DIGOS-MAKAR RD(S00202MN)-K1581+953-K1583+882, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱86.9M | 100% | Medium risk56 | —-0.076 |
| 28 | 18LD0017PREVENTIVE MAINTENANCE ALONG DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECT) K1564+(-478) - K1564+(-278), K1566+000 - K1566+603, K1567+616 - K1568+240, K1569+727 - K1569+978, K1581+434 - K1582+252, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱71.5M | 100% | Medium risk56 | —-0.079 |
| 29 | 21LH0083CONCRETING OF ROAD, INCLUDING DRAINAGE STRUCTURE, BARANGAY MALAGOS TO BARANGAY KAWAYAN, BAGUIO DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱86.8M | 100% | Medium risk56 | —-0.080 |
| 30 | 20LB0186PREVENTIVE MAINTENANCE ALONG ABS-CBN QUIMPO BLVD. DIV. RD. - K1511+(-084) - K1511+409, K1515+198 - K1515+267 | Region XI | Davao City DEO | Completed | ₱84.2M | 100% | Medium risk56 | —-0.078 |
| 31 | 22LB0111PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - DAANG MAHARLIKA (MN) - K1493+287 - K1494+410 | Region XI | Davao City DEO | Completed | ₱64.9M | 100% | Medium risk54 | —-0.084 |
| 32 | 18LH0007REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROAD AT DAVAO-BUKIDNON ROAD, MARILOG DISTRICT, DAVAO CITY, K1622+080-K1622+800, K1623+210-K1625+500, K1628+081-K1629+120 | Region XI | Davao City 2nd DEO | Completed | ₱64.3M | 100% | Medium risk54 | —-0.086 |
| 33 | 21LB0268PREVENTIVE MAINTENANCE OF ROADS - PACKAGE 4 PROJECT A: PREVENTIVE MAINTENANCE OF ROAD, ASPHALT OVERLAY - CHAVEZ ST. (JCT 5TH AVENUE - JCT PONCE ST), DAVAO CITY PROJECT B: PREVENTIVE MAINTENANCE OF ROAD, ASPHALT OVERLAY - SALES ST. - JUAN LUNA | Region XI | Davao City DEO | Completed | ₱52.2M | 100% | Medium risk53 | —-0.089 |
| 34 | 22LH0007REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1633+050-K1633+252, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱54.5M | 100% | Medium risk53 | —-0.088 |
| 35 | 21LD0019PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DIGOS-MAKAR RD-K1587+558- K1588+462, K1591+160-K1591+358, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱47.6M | 100% | Medium risk52 | —-0.088 |
| 36 | 20K00199ROAD WIDENING, SAYRE HIGHWAY (JCT. BUKIDNON - DAVAO CITY RD - COTABATO BDRY) - K1575+000 - K1575+500, K1577+100 - K1579+400, BUKIDNON | Region X | Region X | Completed | ₱84.2M | 100% | Medium risk52 | —-0.080 |
| 37 | 20KB0081REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE - SECONDARY ROADS ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1605+560 - K1605+675, OMONAY, DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱79.1M | 100% | Medium risk52 | —-0.081 |
| 38 | 17L00083WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCL. REHAB./RECONST./UPGRADING (ASPHALT TO CONCRETE | Region XI | Region XI | Completed | ₱124.5M | 100% | Medium risk51 | —-0.041 |
| 39 | 19KB0024ROAD WIDENING ON SPECIFIC LOCATION ALONG BUKIDNON-DAVAO CITY ROAD, K1616+558-K1617+852, K1619+682-K1619+787, SINUDA-TAWAS, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱53.4M | 100% | Medium risk50 | —-0.085 |
| 40 | 17L00040WIDENING (2-4 INTO 6 LANES & 2 INTO 4 LANES) INCL. REHAB./RECONST. OF DAMAGED PAVED NAT'L. & RROW OF | Region XI | Region XI | Completed | ₱121.7M | 100% | Medium risk50 | —-0.040 |
| 41 | 17L00034WIDENING (2 INTO 4 LANES) OF DVO.-COT. ROAD (JCT.DIGSO-COTABATO SECT.) INLC. RROW (BRGY. SINAWILAN-B | Region XI | Region XI | Completed | ₱173.9M | 100% | Medium risk50 | —-0.027 |
| 42 | 24LD0088CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY KIBLAGON, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.091 |
| 43 | 25L00078PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DIGOS - MAKAR RD) - K1572 + 006 - K1572 + 179, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱17.3M | 96% | Medium risk47 | —-0.058 |
| 44 | 25L00077PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DIGOS MAKAR RD.) - K1567+400 - K1567+590, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱19.1M | 99% | Medium risk47 | —-0.060 |
| 45 | 18LD0005PREVENTIVE MAINTENANCE-SECONDARY ROADS, ALONG DIGOS DIV. RD-K1564+584 - K1565+000, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱18.9M | 100% | Medium risk47 | —-0.088 |
| 46 | 22LH0011PREVENTIVE MAINTENANCE ALONG CALINAN-BAGUIO-CADALIAN RD.- K1684+246-K1686+300, K1686+300-K1688+000, K1690+465-K1690+577, K1694+827-K1697+200, CALINAN AND BAGUIO DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.088 |
| 47 | 21LB0093PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - DACUDAO RD - K1507 + 070 - K1507 + 800 | Region XI | Davao City DEO | Completed | ₱34.2M | 100% | Medium risk47 | —-0.091 |
| 48 | 19LH0024PREVENTIVE MAINTENANCE ALONG DAVAO-BUKIDNON ROAD, K1621+(-315) TO K1621+360, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱31.4M | 100% | Medium risk46 | —-0.091 |
| 49 | 20LD0067PREVENTIVE MAINTENENCE OF ROAD:ASPHALT OVERLAY-ALONG DIGOS-MAKAR RD(S00184MN)-K1564+395-K1564+635, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.087 |
| 50 | 18LB0044CONST. OF REINFORCED CONCRETE REVETMENT ON STEEL SHEET PILES ALONG DAVAO RIVER, BOLTON BRIDGE DOWNS | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.075 |