Opening the dossier…
Opening the dossier…
Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4.6B
Average progress
96.3%
Completion rate
82.6%
Average risk score
36.6
Medium risk on average, out of 100
Flagged as unusual
11
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 98 | ₱4.2B | 35.9 | 11 | 95.7% |
| Region IX | 12 | ₱95.7M | 40.2 | 0 | 100.0% |
| Region XI | 3 | ₱222.9M | 42.9 | 0 | 100.0% |
| Region VI | 1 | ₱22.3M | 44.9 | 0 | 100.0% |
| Region XIII | 1 | ₱30.1M | 43.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 42 | ₱2.4B | 34.5 | 0 | 99.4% |
| Bridges | 37 | ₱521.1M | 28.5 | 1 | 97.4% |
| Buildings and Facilities | 12 | ₱119.6M | 17.8 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱631.5M | 33.0 | 0 | 100.0% |
| OTHER | 7 | ₱556.5M | 76.1 | 4 | 86.5% |
| GAA 2025 SSP | 5 | ₱43.3M | 89.7 | 4 | 69.3% |
| GAA 2025 OO-1 | 2 | ₱280.8M | 94.5 | 2 | 72.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 25MG0087CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BANGA NATIONAL HIGH SCHOOL, BARANGAY BENITEZ, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.019 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 22M00095CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE F, STA 53+100-STA 53+959, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱75.3M | 100% | High risk76 | —-0.025 |
| 17LD0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), DIGOS DIV. RD A. K1562+860 TO K1564+100 B. K1566+000 TO K1566+210, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱48.9M | 100% | High risk75 | —-0.026 |
| 24M00116CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MARBEL-MAKAR RD -K1686+095 - K1686+312, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱8.3M | 97% | High risk75 | —-0.001 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0102CONCRETING OF ROAD, FROM BARANGAY POBLACION TO BARANGAY CROSSING RUBBER, POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱19.2M | 51% | High risk93 | Flagged0.031 |
| 24M00011CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱193M | 95% | High risk78 | Flagged0.030 |
| 24MB0066CONSTRUCTION OF DPWH SOUTH COTABATO 1ST DEO BUILDING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱96.5M | 30% | High risk78 | Flagged0.030 |
| 25MB0109CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY CANNERY SITE, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 59% | High risk91 | Flagged0.029 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MB0112CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) AT SANTOS HILL ELEMENTARY SCHOOL, PUROK 2, BARANGAY POBLACION, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.8M | 66% | High risk90 | Flagged0.025 |
| 25M00052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SURALLAH-LAKE SEBU-MAITUM RD - K1799+460 - K1799+580, K1827+970 - K1828+022, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 53% | High risk95 | Flagged0.024 |
| 25MB0101CONCRETING OF ROAD, PUROK TUKAY-EL, BARANGAY CEBUANO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱9.6M | 71% | High risk90 | Flagged0.024 |
| 23M00174CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱101.3M | 93% | High risk78 | Flagged0.022 |
| 23MB0073WIDENING OF PERMANENT BRIDGES-BAWING BR. (B01027MN) ALONG MAKAR-KIAMBA RD. | Region XII | South Cotabato 1st DEO | On-Going | ₱32.1M | 3% | Low risk29 | Flagged0.022 |
| 25MB0055CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSIO | Region XII | South Cotabato 1st DEO | On-Going | ₱33.3M | 90% | High risk73 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20M00044CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO MT. MATUTUM JUMP-OFF POINT, BRGY. KABLON-SITO GLANDANG, STA. 4+680-STA. 5+400, STA. 5+900-STA. 8+780 TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱120.6M | 100% | Medium risk48 | —-0.073 |
| 27 | 24M00170PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD - K1733 + 161 - K1734 + 015, SURALLAH, SOUTH COTABATO | Region XII | Region XII | Completed | ₱115.9M | 100% | Medium risk46 | —-0.075 |
| 28 | 24M00216ASPHALT OVERLAY MAKAR-MARBEL ROAD (S00253MN) - K1692+788-K1693+503 , TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱95.9M | 100% | Medium risk46 | —-0.042 |
| 29 | 18M00023CONSTRUCTION OF CONCRETE ROAD TUPI-SARANGANI ROAD (NHW JCT. TUPI-JCT LINAN-MIASONG ROAD), PACKAGE B, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱144.7M | 100% | Medium risk45 | —-0.033 |
| 30 | 20GJ0056UPGRADING OF DRAINAGE STRUCTURE ALONG I. DELA RAMA ST. - (S00062PN) CHAINAGE 381 - CHAINAGE 858 | Region VI | Iloilo City DEO | Completed | ₱22.3M | 100% | Medium risk45 | —-0.082 |
| 31 | 18MB0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PUROK 3A, POBLACION - LOTE, LINAN ROAD CONNECTING TO COFFEE AND CACAO PROCESSING AREAS AND TUPI PUBLIC MARKET IN SUPPORT TO AGRIBUSINESS INDUSTRY, TUPI, SOUTH COT. | Region XII | South Cotabato 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.054 |
| 32 | 21M00047CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE E, STA. 55+720 - STA. 56+600, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.072 |
| 33 | 25MB0059CONSTRUCTION OF ROAD FROM NATIONAL HIGHWAY TO LASEDECO ROAD, PUROK 3, BARANGAY CROSSING RUBBER, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱6.8M | 100% | Medium risk44 | —-0.051 |
| 34 | 19M00019CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION), PACKAGE A, STA. 46+769 TO STA. 46+873, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk44 | —-0.074 |
| 35 | 23M00173CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA. 46+986 - STA. 47+141.65, STA. 48+749 - STA. 48+769.24, STA. 49+602 - STA. 49+665.28, BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION), TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱96.5M | 100% | Medium risk44 | —-0.037 |
| 36 | 24M00129OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF BIKE LANES - MARBEL-MAKAR RD, K1686+793 - K1690+800, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱96.1M | 83% | Medium risk44 | —-0.041 |
| 37 | 17NB0120WIDENING OF HUPAS BRIDGE FROM TWO LANES TO FOUR ALONG (DAANG MAHARLIKA) AGUSAN-DAVAO ROAD, BRGY. POBLACION, SIBAGAT, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱30.1M | 100% | Medium risk43 | —-0.025 |
| 38 | 20M00038CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-BANGA-TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION), PACKAGE C, STA. 53+220- STA. 55+080, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk43 | —-0.074 |
| 39 | 19M00020CONSTRUCTION OF BY-PASS AND DIVERSION ROAD- BANGA TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION), STA. 51+564 TO STA. 52+689, STA. 52+689 TO STA. 53+220, PACKAGE B, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk43 | —-0.074 |
| 40 | 18MB0004RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - SOUTH TUPI BR. (B01032MN) ALONG MARBEL-MAKAR RD | Region XII | South Cotabato 1st DEO | Completed | ₱9.8M | 100% | Medium risk38 | —-0.031 |
| 41 | 22M00072CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱80.7M | 100% | Medium risk38 | —-0.066 |
| 42 | 22M00021CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA-CAPITON-TANUEL RIVER , (TAMONTAKA SECTION-PHASE II), STA 0 + 421 - STA 0 + 851, DATU ODIN SINSUAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱82M | 100% | Medium risk38 | —-0.069 |
| 43 | 22MB0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARBEL-MAKAR ROAD (PAGALUNGAN SECTION), (APOPONG-SILWAY-SINAWAL RIVER BASIN), PAGALUNGAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱71M | 100% | Medium risk37 | —-0.067 |
| 44 | 24M00117CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - MARBEL-MAKAR RD - K1692+000 - K1692+835, K1693+586 - K1692+827, K1694+414 - K1695+596, TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱77.2M | 93% | Medium risk36 | —-0.045 |
| 45 | 22M00096CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD ( TUPI-MALUNGON SECTION) PACKAGE G, STA.53+959 - STA.54+770, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱65.6M | 100% | Medium risk34 | —-0.081 |
| 46 | 20MB0132CONSTRUCTION OF MULTI-PURPOSE BUILDING (FRUIT HALL), TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱9.4M | 100% | Medium risk33 | —-0.055 |
| 47 | 25M00056PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (COTABATO-MARBEL RD) - K1728 + 418 - K1730 + 270, SURALLAH, SOUTH COTABATO | Region XII | Region XII | Completed | ₱56.2M | 100% | Medium risk32 | —-0.081 |
| 48 | 23M00070CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA. 0+000 STA. 0+375, BARANGAY UPPER MACULAN, LAKE SEBU, SOUTH COTABATO | Region XII | Region XII | Completed | ₱57.9M | 100% | Medium risk32 | —-0.072 |
| 49 | 18JD0046RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BIAYON BRIDGE (BOO423MN) ALONG DIPOLOG-PUNTA-DANSULLAN S. OSMEÑA, ZAMBOANGA DEL NORTE/SUR BDRY. ROAD | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱3M | 100% | Medium risk31 | —-0.054 |
| 50 | 18JC0028RETROFITTING/ STRENGTHENING OF SIBALIC BR. (B01187MN) ALONG LILOY-SIOCON RD, GUTALAC, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.7M | 100% | Medium risk31 | —-0.054 |