Contractor dossier
131 projects on file, including joint ventures this contractor is part of.
Total projects
131
Total budget
₱2.4B
Average progress
95.1%
Completion rate
83.2%
Average risk score
38.0
Medium risk on average, out of 100
Flagged as unusual
12
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 130 | ₱2.4B | 38.0 | 12 | 95.1% |
| Region VIII | 1 | ₱39.2M | 45.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 48 | ₱286.8M | 21.6 | 0 | 99.8% |
| Roads | 32 | ₱502.3M | 38.6 | 0 | 99.7% |
| Flood Control and Drainage | 26 | ₱1.2B | 41.0 | 1 | 94.9% |
| GAA 2025 SSP | 8 | ₱39.2M | 94.7 | 7 | 54.4% |
| OTHER | 7 | ₱235.9M | 75.1 | 4 | 85.1% |
| Bridges | 6 | ₱110.9M | 41.2 | 0 | 97.3% |
| Water Provision and Storage | 3 | ₱12.1M | 25.4 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱22.5M | 39.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0064CONSTRUCTION OF ROAD, BRGY. SABANG, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk95 | —-0.022 |
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
| 16NF0149CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG SURIGAO-SAN JUAN COASTAL ROAD/SURIGAO CITY, K1119+485 - K1119+625.03, L/S K1119+633.09 - K1119+730.90, L/S, K1119+740 - K1119+813.25, L/S, K1119+823.45 - K1119+951, L/S | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.7M | 100% | High risk74 | —-0.023 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 24NG0007CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES, CAMPO-CABUGAO ROAD IN SUPPORT TO AGRIBUSINESS INDUSTRY, BACUAG, SURIGAO DEL NORTE / BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱32.6M | 100% | High risk74 | —-0.019 |
| 16NF0141WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO (2) LANES/SIANA BRIDGE (B00859MN) ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) K1157+163.00 - K1157+179.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱15M | 100% | High risk74 | —-0.023 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24NG0092CONSTRUCTION OF ANOMAR FLOOD MITIGATING STRUCTURE/ BARANGAY ANOMAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86.8M | 84% | High risk89 | Flagged0.050 |
| 24NG0106CONSTRUCTION OF DRRM BUILDING, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱979.3K | 96% | High risk64 | Flagged0.037 |
| 25NG0062CONSTRUCTION OF ROAD AT SITIO SABANG, BRGY. TAYAGA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 3% | High risk95 | Flagged0.034 |
| 25NG0101CONSTRUCTION OF SAN PEDRO - SAN ISIDRO - MAYAG ROAD, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 7% | High risk95 | Flagged0.031 |
| 25NG0093CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 44% | High risk95 | Flagged0.022 |
| 25NG0087CONSTRUCTION OF EVACUATION CENTER, BRGY. SAPA, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 61% | High risk95 | Flagged0.019 |
| 25NG0024NRJ BRGY. CAMPO-BRGY. PAYAPAG ROAD LEADING TO SITIO LITTLE BAGUIO FALLS AND FARM, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 19% | High risk74 | Flagged0.018 |
| 23NG0155REPAIR OF CABUGAO FLOOD CONTROL / BRGY. CABUGAO, BACUAG, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱30M | 0% | Medium risk59 | Flagged0.016 |
| 25NG0027CONSTRUCTION OF MULTI PURPOSE BUILDING, BRGY. SAN PABLO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 66% | High risk95 | Flagged0.014 |
| 25NG0099CONSTRUCTION OF CAPAYAHAN-MARGA- SAN PABLO ROAD LEADING TO TOURISM AREA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 73% | High risk95 | Flagged0.013 |
| 25NG0105CONSTRUCTION OF EVACUATION CENTER, BRGY. MAGALLANES, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 82% | High risk95 | Flagged0.013 |
| 24NG0045CONSTRUCTION OF BINOCARAN - MALIMONO FLOOD MITIGATION STRUCTURE AT BARANGAY BINOCARAN, MALIMONO, SURIGAO DEL NORTE / BRGY. BINOCARAN, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱86M | 97% | High risk77 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 21NG0040CONSTRUCTION OF FLOOD MITIGATING STRUCTURE ALONG MABUHAY RIVER/BRGY. MABUHAY, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱87.1M | 100% | Medium risk43 | —-0.062 |
| 27 | 24NG0076CONCRETING OF BRGY. TINAGO FMR / BRGY. TINAGO, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk42 | —-0.003 |
| 28 | 24NG0024BRIDGE - CONSTRUCTION OF NEW BRIDGES, PANANAY-AN BR. ALONG SURIGAO-DAVAO COASTAL ROAD/ BRGY. PANANAY-AN, PLACER SURIGAO DEL NORTE, K1158+767.90 - K1158+782.90 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱33.5M | 90% | Medium risk42 | —-0.016 |
| 29 | 25NG0065CONSTRUCTION OF ROAD, PUROK XI, BRGY. SAN JUAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱4.9M | 98% | Medium risk42 | —-0.061 |
| 30 | 23NG0027CONSTRUCTION OF ROAD, BARANGAY BIYABID, SISON, SURIGAO DEL NORTE/BARANGAY BIYABID, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk41 | —-0.088 |
| 31 | 19NG0080CONCRETING OF BARANGAY ROAD / BRGY. JUBGAN, SAN FRANCISCO, SURIGAO DEL NORTE, STA.0+003.05 - STA.0+165.55; STA.0+003.08 - STA.0+79.9 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.083 |
| 32 | 24NG0043CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LOCAL ACCESS ROAD (LADGARON-DAYWAN ROAD) LEADING TO CLACOFARMCO COCONUT PROCESSING PLANT, BRGY. DAYWAN, CLAVER, SURIGAO DEL NORTE FROM SAPA-LADGARON ROAD INTERSECTI | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱18.3M | 94% | Medium risk41 | —-0.018 |
| 33 | 24NG0025BRIDGE - WIDENING OF PERMANENT BRIDGES, BONOT BR. (B00985MN) ALONG SURIGAO-DAVAO COASTAL RD./BRGY. PONIENTE, GIGAQUIT SURIGAO DEL NORTE, STA. K1170+282.00 - K1184+298.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱16.1M | 100% | Medium risk41 | —-0.042 |
| 34 | 21NG0042CONSTRUCTION/IMPROVEMENT OF ANAO-AON FLOOD CONTROL STRUCTURE/BRGY. POBLACION, SAN FRANCISCO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱47M | 100% | Medium risk41 | —-0.072 |
| 35 | 20NG0026BRIDGE PROGRAM WIDENING OF PERMANENT BRIDGES HAYANGGABON BRIDGE 2 (B00994MN) ALONG SURIGAO-DAVAO COASTAL ROAD/ BRGY. HAYANGGABON, CLAVER, SURIGAO DEL NORTE, K1194+876 - K1194+900 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱24.5M | 100% | Medium risk41 | —-0.042 |
| 36 | 24N00110MABUHAY BR. (B00852MN) ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT) | Region XIII | Region XIII | Completed | ₱4.8M | 100% | Medium risk41 | —-0.049 |
| 37 | 22NG0087CONSTRUCTION OF WATER SUPPY SYTEM (LEVEL II), BARANGAY SAN ISIDRO, SISON, SURIGAO DEL NORTE/BARANGAY SAN ISIDRO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk41 | —-0.047 |
| 38 | 21NG0112CONCRETING OF ROAD, BARANGAY MAYAG, SISON, SURIGAO DEL NORTE / BRGY. MAYAG, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱7.8M | 100% | Medium risk41 | —-0.089 |
| 39 | 22NG0119CONSTRUCTION OF ROAD, BARANGAY IMA, SISON, SURIGAO DEL NORTE/BARANGAY IMA, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk41 | —-0.087 |
| 40 | 20NH0027JCT. GAMUT-SAN MIGUEL BAYUGAN RD. K1311+012 -K1311+048 , K1311 + 063 - K1311+472, K1311 + 485 -K1312 + 795, K1312 + 809 - K1313 + 000 ROAD WIDENING, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱47.2M | 100% | Medium risk41 | —-0.075 |
| 41 | 18NF0066WIDENING OF PERMANENT BRIDGES, LADGARON BRIDGE (B00988MN) ALONG SURIGAO-DAVAO COASTAL ROAD, CLAVER, SURIGAO DEL NORTE, K1177+510 - K1177+525 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱13.7M | 100% | Medium risk41 | —-0.043 |
| 42 | 23NG0026CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, SISON, SURIGAO DEL NORTE/ BARANGAY SAN ISIDRO, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk41 | —-0.088 |
| 43 | 21NG0034CONSTRUCTION OF FLOOD MITIGATING STRUCTURE / BRGY. MOTORPOOL, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.070 |
| 44 | 22NG0021CONSTRUCTION OF TIMAMANA FLOOD CONTROL STRUCTURE, TUBOD, SURIGAO DEL NORTE / BRGY. TIMAMANA, TUBOD, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.072 |
| 45 | 21NG0035CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (BAD-AS FLOOD CONTROL) / BRGY. BAD-AS, PLACER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.071 |
| 46 | 22NG0034CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGANA-AN RIVER, TAGANA-AN, SURIGAO DEL NORTE/TAGANA-AN, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱48.5M | 100% | Medium risk40 | —-0.070 |
| 47 | 22NG0045CONSTRUCTION OF DAPJA-KATUNGGAN FLOOD CONTROL STRUCTURE, TAGANA-AN, SURIGAO DEL NORTE/TAGANA-AN SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱48.5M | 100% | Medium risk40 | —-0.071 |
| 48 | 20NE0098CONSTRUCTION OF EVACUATION CENTER, BRGY. IMEE, BASILISA, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱34.7M | 100% | Medium risk40 | —-0.062 |
| 49 | 20NE0005OFF-CARRIAGEWAY IMPROVEMENT ALONG DINAGAT-LORETO ROAD K0087+036-K0087+211,K0087+242-K0087+378,K0087+566-K0087+605, LORETO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱10.6M | 100% | Medium risk40 | —-0.090 |
| 50 | 22NG0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GACEPAN, SISON, SURIGAO DEL NORTE / BARANGAY GACEPAN, SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱4.9M | 100% | Medium risk40 | —-0.084 |