Contractor dossier
66 projects on file, including joint ventures this contractor is part of.
Total projects
66
Total budget
₱4.4B
Average progress
90.2%
Completion rate
72.7%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
6
9.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 45 | ₱2.7B | 48.8 | 2 | 93.8% |
| Region IX | 13 | ₱1.3B | 70.5 | 4 | 79.7% |
| Region IV-A | 4 | ₱254.3M | 59.0 | 0 | 100.0% |
| National Capital Region | 4 | ₱205.2M | 52.2 | 0 | 73.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 34 | ₱2.4B | 52.4 | 1 | 93.1% |
| Buildings and Facilities | 12 | ₱636M | 47.4 | 2 | 83.3% |
| Flood Control and Drainage | 11 | ₱588.9M | 51.5 | 0 | 90.3% |
| OTHER | 4 | ₱438.4M | 77.4 | 2 | 90.7% |
| GAA 2025 OO-2 | 2 | ₱192.4M | 93.6 | 1 | 63.8% |
| Water Provision and Storage | 2 | ₱75.1M | 46.5 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱76.9M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00029CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱96.2M | 56% | High risk94 | Flagged0.001 |
| 25J00028CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱96.2M | 72% | High risk94 | —-0.001 |
| 24J00041CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱146.2M | 72% | High risk82 | Flagged0.033 |
| 24J00042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱146.2M | 90% | High risk82 | Flagged0.028 |
| 17K00058CONST. OF TANGUB-BONIFACIO BYPASS RD INCL.ROW & BR,MIS.OCC. 2ND LD | Region X | Region X | Completed | ₱87.8M | 100% | High risk76 | —-0.008 |
| 24J00120PAVING OF UNPAVED ROADS - SECONDARY ROADS LILOY - SIOCON ROAD (S01330MN) | Region IX | Region IX | On-Going | ₱143.3M | 85% | High risk73 | —-0.029 |
| 25JI0024CONSTRUCTION OF BUUG COASTAL ROAD, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 1st DEO | On-Going | ₱131M | 55% | High risk72 | —-0.028 |
| 19DC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM | Region IV-A | Batangas 3rd DEO | Completed | ₱58.3M | 100% | High risk70 | —-0.039 |
| 25J00063ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱159.8M | 6% | High risk69 | Flagged0.018 |
| 21J00059REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD | Region IX | Region IX | On-Going | ₱102.9M | 100% | High risk68 | —-0.016 |
| 21OE0022REHABILITATION OF RCBC ALONG E. QUINTOS STREET CHAINAGE 000.00 -CHAINAGE 803.00, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94M | 100% | High risk65 | —-0.077 |
| 23DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE ALONG BATANGAS PORT DIVERSION RD, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.076 |
| 22JD0066SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONST. OF ROAD BRGY. MALIGAYA, POLANCO TO BRGY. SINAAD, SERGIO OSMEÑA,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱62.1M | 100% | High risk62 | —-0.025 |
| 24JD0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF ACCESS ROAD LEADING TO ROCK DIVE INN, CRYSTAL BEACH, AZUL MAR BEACH, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱57M | 100% | High risk61 | —-0.046 |
| 23K00067CONST. OF BY-PASS AND DIVERSION ROADS, ILIGAN CITY COASTAL BYPASS ROAD, PACKAGE 12, LANAO DEL NORTE | Region X | Region X | Completed | ₱141.2M | 100% | High risk60 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00426CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR OFFICER'S QUARTERS | Region X | Region X | On-Going | ₱111.3M | 0% | Medium risk47 | Flagged0.054 |
| 25K00427CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR ENLISTED PERSONNEL | Region X | Region X | On-Going | ₱85.7M | 0% | Medium risk33 | Flagged0.049 |
| 24J00041CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) LEFT | Region IX | Region IX | On-Going | ₱146.2M | 72% | High risk82 | Flagged0.033 |
| 24J00042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY ROAD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱146.2M | 90% | High risk82 | Flagged0.028 |
| 25J00063ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱159.8M | 6% | High risk69 | Flagged0.018 |
| 25J00029CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SIBUGUEY RIVER, SIBUGUEY BR. SECTION (B00480MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD (S01112MN) RIGHT | Region IX | Region IX | On-Going | ₱96.2M | 56% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25K00411CONSTRUCTION OF ROAD LEADING TO LUBILAN FALLS, NAAWAN, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱76.4M | 21% | Medium risk52 | —-0.032 |
| 27 | 21K00067CONST. OF BYPASS & DIVERSION ROADS, OPOL DIVERSION ROAD(OPOL-CANITOAN), CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱85.1M | 100% | Medium risk52 | —-0.066 |
| 28 | 20K00332CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OPOL DIVERSION ROAD (OPOL-CANITOAN), CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱73.3M | 100% | Medium risk52 | —-0.076 |
| 29 | 23KM0056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 9, LANAO DEL NORTE (RE-BID) | Region X | Iligan City DEO | Completed | ₱86.9M | 100% | Medium risk51 | —-0.081 |
| 30 | 20KL0057CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ROAD IN DINUGON CONNECTING PHIVIDEC INDUSTRIAL SITE, STA. ANA, TAGOLOAN, MISAMIS ORIENTAL STA.0+000.00-STA.1+997.40 | Region X | Misamis Oriental 2nd DEO | Completed | ₱60.3M | 100% | Medium risk51 | —-0.091 |
| 31 | 22KH0026NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS OPOL DIVERSION ROAD (OPOL-CANITOAN) PACKAGE 14, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱60.8M | 100% | Medium risk51 | —-0.082 |
| 32 | 23DE0081OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BATANGAS PORT DIVERSION RD - K0102+(-600) - K0102+(-334), K0102+(-043) - K0102+392, | Region IV-A | Batangas 2nd DEO | Completed | ₱48.1M | 100% | Medium risk51 | —-0.105 |
| 33 | 21K00190CONST. OF BYPASS & DIVERSION ROADS, OPOL DIVERSION ROAD (OPOL-CANITOAN), MISAMIS ORIENTAL | Region X | Region X | Completed | ₱76.9M | 100% | Medium risk51 | —-0.051 |
| 34 | 22DE0062ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - BATANGAS PORT DIVERSION RD - K0102+(-334) - K0102+(-170) | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 35 | 21K00276CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG IPONAN RIVER (CANITOAN SECTION), IPONAN, CDO CITY, STA.2+316.80-STA.2+666.61 | Region X | Region X | Completed | ₱73.3M | 100% | Medium risk50 | —-0.056 |
| 36 | 22KL0043CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LUGAIT RIVER (PACKAGE 2) LUGAIT, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱67.6M | 100% | Medium risk50 | —-0.078 |
| 37 | 25OE0058REHABILITATION OF DRAINAGE SYSTEM ALONG SH LOYOLA STREET, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱48.1M | 68% | Medium risk49 | —-0.047 |
| 38 | 19KK0120CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, GINGOOG BY-PASS ROAD, MISAMIS ORIENTAL (PHASE I), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱48.8M | 100% | Medium risk49 | —-0.093 |
| 39 | 22KI0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION / IMPROVEMENT OF ACCESS ROADSLEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP),ACCESS ROAD LEADING TO GUIBAN FALLS, CONCEPCION, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.072 |
| 40 | 22KJ0014CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TANGUB-BONIFACIO BYPASS ROAD, SILANGIT-SAN VICENTE-TUGAS-SUMIRAP SECTION, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱47.5M | 100% | Medium risk49 | —-0.034 |
| 41 | 20OE0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - REHABILITATION OF A.H. LACSON SERVICE ROAD, G. TUAZON AND F. CAYCO ST | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 42 | 21KJ0103CONSTRUCTION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, OZAMIZ CITY, MISAMIS OCCIDENTAL, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱44.6M | 100% | Medium risk48 | —-0.093 |
| 43 | 23KD0047CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY PUERTO CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱47.1M | 100% | Medium risk48 | —-0.051 |
| 44 | 20KI0098CONSTRUCTION OF EVACUATION CENTER, BRGY. SAN VICENTE ALTO, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱34.7M | 100% | Medium risk48 | —-0.087 |
| 45 | 17K00216CONST. OF BY-PASSES/DIVERSION ROADS,SH BY-PASS RD(CLIMBING LANES)INCL. ROW,CARMEN-PUERTO SECT.,CDOC | Region X | Region X | Completed | ₱157.8M | 100% | Medium risk48 | —-0.024 |
| 46 | 21K00318STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS/QUARANTINE FACILITIES, MALANANG, OPOL, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱33.7M | 100% | Medium risk47 | —-0.079 |
| 47 | 19KH0001CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF CAGAYAN DE ORO DRAINAGE SYSTEM (DIVERSION CHANNEL ALONG NHA - KAUSWAGAN SECTION), KAUSWAGAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱47.9M | 100% | Medium risk47 | —-0.066 |
| 48 | 25K00426CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR OFFICER'S QUARTERS | Region X | Region X | On-Going | ₱111.3M | 0% | Medium risk47 | Flagged0.054 |
| 49 | 25OE0144REHABILITATION OF DRAINAGE SYSTEM ALONG DOS CASTILLAS ST. MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱14.2M | 26% | Medium risk46 | —-0.036 |
| 50 | 20KJ0141CONSTRUCTION/IMPROVEMENT OF SINONOC SEAWALL, SINACABAN, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱33.8M | 100% | Medium risk46 | —-0.074 |