Contractor dossier
59 projects on file, including joint ventures this contractor is part of.
Total projects
59
Total budget
₱661.9M
Average progress
97.9%
Completion rate
76.3%
Average risk score
52.5
Medium risk on average, out of 100
Flagged as unusual
7
11.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 59 | ₱661.9M | 52.5 | 7 | 97.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 23 | ₱223.5M | 45.8 | 0 | 100.0% |
| Roads | 20 | ₱218.5M | 50.5 | 0 | 100.0% |
| Water Provision and Storage | 4 | ₱14.4M | 28.9 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱23.2M | 95.5 | 3 | 66.2% |
| OTHER | 3 | ₱38.4M | 82.4 | 3 | 95.7% |
| Flood Control and Drainage | 3 | ₱43.4M | 49.6 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱93.8M | 93.5 | 1 | 95.9% |
| Bridges | 1 | ₱6.8M | 46.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
| 25PB0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, DANGLA ELEMENTARY SCHOOL, DANGLA-KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.8M | 65% | High risk95 | Flagged0.019 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 25PB0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, ABBUT-CONNER RD-K0548+630-K0548+702 | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱27.2M | 99% | High risk93 | —-0.003 |
| 24PB0063BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND: CONSTRUCTION OF 2STY6CL WITH LABORATORY, CONNER NATIONAL HS, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.4M | 97% | High risk88 | Flagged0.049 |
| 25PB0037CONCRETING OF SITIO GASSUD, BRGY. KARIKITAN TO SITIO GANGAN, BRGY. MAWIGUE FMR, BRGY. KARIKITAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱14.6M | 90% | High risk88 | Flagged0.048 |
| 24PB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD- K0577+369-K0589+497, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | High risk71 | Flagged0.007 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0063BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND: CONSTRUCTION OF 2STY6CL WITH LABORATORY, CONNER NATIONAL HS, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.4M | 97% | High risk88 | Flagged0.049 |
| 25PB0037CONCRETING OF SITIO GASSUD, BRGY. KARIKITAN TO SITIO GANGAN, BRGY. MAWIGUE FMR, BRGY. KARIKITAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱14.6M | 90% | High risk88 | Flagged0.048 |
| 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
| 25PB0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, DANGLA ELEMENTARY SCHOOL, DANGLA-KUMAO, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.8M | 65% | High risk95 | Flagged0.019 |
| 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 24PB0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD- K0577+369-K0589+497, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | High risk71 | Flagged0.007 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22PC0018BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, HIGHWAY PATROL GROUP AND CRIME LABORATORY, APAYAO POLICE PROVINCIAL OFFICE, BARANGAY SAN GREGORIO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.9M | 100% | Medium risk52 | —-0.071 |
| 27 | 19PC0083CONSTRUCTION OF PNP MPB, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5.8M | 100% | Medium risk52 | —-0.072 |
| 28 | 22PC0066BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, APAYAO MUSEUM AND CULTURAL CENTER, BARANGAY SAN GREGORIO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.9M | 100% | Medium risk52 | —-0.071 |
| 29 | 19PC0053CONSTRUCTION OF MOTORPOOL, PAYANAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk52 | —-0.072 |
| 30 | 22PC0067LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MATERIALS TESTING LABORATORY BUILDING OF DPWH APAYAO 2ND DEO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.072 |
| 31 | 18PC0074CONSTRUCTION OF 2 STY 6 CL W/ WATER SUPPLY SYSTEM, PUDTOL CS, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱16M | 100% | Medium risk51 | —-0.038 |
| 32 | 24PB0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF PAVEMENT MARKINGS ALONG APAYAO-ILOCOS NORTE ROAD - K0609 + 000 - K0613 + 000, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.3M | 100% | Medium risk51 | —-0.043 |
| 33 | 19PC0030CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABANGAN FLOOD CONTROL ALONG APAYAO RIVER, SABANGAN, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk51 | —-0.062 |
| 34 | 18PC0069CONSTRUCTION OF 2STY 4CL W/ WATER SYSTEM, BUTAO ES, CALANASAN(BAYAG), APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱13.3M | 100% | Medium risk51 | —-0.022 |
| 35 | 24PB0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) -SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF PAVEMENT MARKINGS AND TRAFFIC SIGNAGE ALONG ABBUT-CONNER ROAD-K0540+000-K0565+855, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱7.7M | 100% | Medium risk51 | —-0.042 |
| 36 | 24PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF PAVEMENT MARKINGS ALONG CONNER-KABUGAO ROAD - K0589+497 - K0606+005, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱5.4M | 100% | Medium risk51 | —-0.043 |
| 37 | 24PB0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF PAVEMENT MARKINGS ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BOUNDARY ROAD -K0592+000-K0605+536-KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱6.4M | 100% | Medium risk51 | —-0.042 |
| 38 | 24PB0015SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF APAYAO ROAD - POBLACION, KABUGAO-BALIWANAN-LUNA RD (PACKAGE 1), KAB | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱19.2M | 100% | Medium risk51 | —-0.044 |
| 39 | 23PB0047CY 2023 BASIC EDUCATIONAL FACILITIES FUND (BEFF)- BATCH 1, CONSTRUCTION OF 1STY3CL, TALIFUGO ES, CONNER,APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱8.7M | 100% | Medium risk51 | —-0.042 |
| 40 | 19PC0001PACKAGE I: ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (SECONDARY ROADS) KABUGAO-PUDTOL-LUNA-CAGAYAN ROAD, 1.) K0623+446-K0624+112, 2.) K0626+(-072)-K0626+(-006), 3.) K0626+278-K0626+331(RS), | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱21.3M | 100% | Medium risk51 | —-0.075 |
| 41 | 23PB0006ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, CONNER-KABUGAO RD- K0581+090-K0581+319 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.081 |
| 42 | 18PC0071CONSTRUCTION OF 2STY 6CL W/ WATER SUPPLY SYSTEM, LUNA CS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.7M | 100% | Medium risk50 | —-0.039 |
| 43 | 23PB0001FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL ALONG CHICO RIVER BASIN, STA. 37+414 - STA. 37+664 (R/S), BARANGA | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱24.5M | 100% | Medium risk49 | —-0.066 |
| 44 | 18PC0047CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG CLAVERIA(CABICUNGAN) RIVER, BRGY STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.3M | 100% | Medium risk49 | —-0.062 |
| 45 | 18PC0092CONSTRUCTION OF 1STY 3CL W/ TOILET EACH ROOM, TUMOG ES, TUMOG, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱7.7M | 100% | Medium risk48 | —-0.039 |
| 46 | 19PC0078CONSTRUCTION OF STA ROSA BRIDGE (STEEL GIRDER) 10M ONE WAY BRGY STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱6.8M | 100% | Medium risk47 | —-0.033 |
| 47 | 18PC0067IMPROVEMENT OF MALIBANG-UPPER ATOK ROAD(PAMANA) 0+000-3+640, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱12.4M | 100% | Medium risk46 | —-0.033 |
| 48 | 18PC0056CONCRETING OF TUMOG FMR,000+000-000+570, BRGY TUMOG, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.030 |
| 49 | 19PC0096CONCRETING OF SITIO MAWANAN - SITIO CASSIGAMAN - SITIO LALATNGAN FMR, BRGY. STA. FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱6.8M | 100% | Medium risk45 | —-0.028 |
| 50 | 24PB0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239, INSTALLATION OF TRAFFIC SIGNAGE ALONG CONNER-KABUGAO ROAD-K0566+081-K0589+156, CONNER AND KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱4.3M | 100% | Medium risk33 | —-0.044 |