Contractor dossier
44 projects on file, including joint ventures this contractor is part of.
Total projects
44
Total budget
₱3.9B
Average progress
76.6%
Completion rate
56.8%
Below 70%
Average risk score
56.1
Medium risk on average, out of 100
Flagged as unusual
5
11.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 34 | ₱1.7B | 53.1 | 3 | 80.0% |
| Region IV-B | 10 | ₱2.2B | 66.4 | 2 | 65.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 22 | ₱1.8B | 52.4 | 0 | 78.6% |
| Flood Control and Drainage | 14 | ₱1.8B | 62.8 | 2 | 67.0% |
| Buildings and Facilities | 4 | ₱161M | 52.7 | 0 | 75.3% |
| OTHER | 3 | ₱120.6M | 60.3 | 3 | 100.0% |
| Bridges | 1 | ₱18.7M | 46.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00157CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 0% | High risk79 | Flagged0.035 |
| 25E00158CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 0% | High risk79 | Flagged0.035 |
| 24E00015FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG ABRA DE ILOG RIVER, CABACAO SECTION, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 24E00017FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION, ARMADO, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.037 |
| 25OH0083CONSTRUCTION OF BOOSTER PUMPING STATION ALONG ESTERO DE PANDACAN, PACKAGE 2B, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱142.8M | 34% | High risk68 | —-0.022 |
| 24E00010FLOOD MANAGEMENT PROGRAM- CONSTRUCTION OF NAGAPI RIVERBANK PROTECTION WORKS ALONG NAGAPI RIVER (UPSTREAM RIGHTSIDE), SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk67 | —-0.042 |
| 25OE0052REHABILITATION OF DRAINAGE ALONG ZONE 58 - 67, MANILA CITY (PHASE IV) | National Capital Region | North Manila DEO | On-Going | ₱93.9M | 16% | High risk65 | —-0.025 |
| 24OE0003INSTALLATION OF BOOSTER PUMP ALONG ESTERO DELA REINA, BARANGAY 9, (PHASE VI) TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94.3M | 100% | High risk65 | —-0.078 |
| 24OE0031INSTALLATION OF BOOSTER PUMP ALONG ESTERO DELA REINA, BARANGAY 9, (PHASE VII) TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.3M | 100% | High risk65 | —-0.078 |
| 24OE0009CONSTRUCTION OF PUMPING STATION ALONG ESTERO DE SAN MIGUEL (EARNSHAW DRAINAGE MAIN OUTFALL) | National Capital Region | North Manila DEO | On-Going | ₱96.5M | 88% | High risk64 | —-0.034 |
| 25E00280SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. TAMBONG, STA. 000=000-STA. 000+332.94, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 25% | High risk63 | —-0.016 |
| 25E00276SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, STA. 000+000-STA. 000+368.64, BANSUD, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.5M | 25% | High risk63 | —-0.016 |
| 24E00027SPECIAL ROAD FUND MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG MINDORO WEST COASTAL ROAD, K0353+000-K0369+000 (INTERMITTENT SECTIONS), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk63 | —-0.053 |
| 22OE0167CONSTRUCTION OF MULTI-PURPOSE BUILDING NORTH CEMETERY COLUMBARIUM, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.080 |
| 24E00119ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE- SECONDARY ROADS- MOGPOG-BALANACAN PORT OAD- K0012+763=-K0013+500 (INTERMITTENT SECTIONS), MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk62 | —-0.049 |
| 25OF0138REHABILITATION OF ROAD ALONG BARANGAY GULOD, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱94.6M | 29% | High risk62 | —-0.039 |
| 24OE0220REHABILITATION OF ROAD WITH DRAINAGE ALONG RODRIGUEZ ST., TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱43.4M | 100% | High risk61 | Flagged0.014 |
| 24OE0226REHABILITATION OF ROAD WITH DRAINAGE ALONG MINDANAO ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱38.6M | 100% | High risk61 | Flagged0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25E00157CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231.2M | 0% | High risk79 | Flagged0.035 |
| 25E00158CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 0% | High risk79 | Flagged0.035 |
| 24OE0220REHABILITATION OF ROAD WITH DRAINAGE ALONG RODRIGUEZ ST., TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱43.4M | 100% | High risk61 | Flagged0.014 |
| 24OE0226REHABILITATION OF ROAD WITH DRAINAGE ALONG MINDANAO ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱38.6M | 100% | High risk61 | Flagged0.012 |
| 24OE0229REHABILITATION OF ROAD WITH DRAINAGE ALONG A. LORENZO ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱38.6M | 100% | Medium risk60 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25OG0086REHABILITATION OF ROAD AT BARANGAY DOÑA AURORA, QUEZON CITY (PACKAGE 1) | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 85% | Medium risk51 | —-0.063 |
| 27 | 25OG0124REHABILITATION OF ROAD, BARANGAY MILAGROSA, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 86% | Medium risk51 | —-0.064 |
| 28 | 25OG0078REHABILITATION OF ROAD BARANGAY TEACHER'S VILLAGE WEST, QUEZON CITY (PPACKAGE 1) | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 87% | Medium risk51 | —-0.065 |
| 29 | 25OF0126PREVENTIVE MAINTENANCE - TERTIARY ROADS - KANLAON ST - K0006 + (-442) - K0007 + 800, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48M | 90% | Medium risk51 | —-0.067 |
| 30 | 25OF0213REHABILITATION OF ROAD ALONG BARANGAY NORTH FAIRVIEW, PACKAGE 1A, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48M | 100% | Medium risk51 | —-0.068 |
| 31 | 25OG0058PREVENTIVE MAINTENANCE - SECONDARY ROADS: AURORA BLVD - K0007 + 615 - K0008 + 740, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱48M | 100% | Medium risk51 | —-0.070 |
| 32 | 25OE0027INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE MAGDALENA, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.084 |
| 33 | 21OE0164REHABILITATION / RECONSTRUCTION OF PRESIDENTIAL SECURITY GROUP (PSG), MULTI -PURPOSE BUILDING (MHQ), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱23.2M | 100% | Medium risk49 | —-0.101 |
| 34 | 22OE0161CONSTRUCTION OF MULTI-PURPOSE BUILDING AT ABAD SANTOS HIGH SCHOOL, MANILA | National Capital Region | North Manila DEO | Completed | ₱11.6M | 100% | Medium risk48 | —-0.096 |
| 35 | 25OE0013REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE IMPROVEMENT ALONG WAGAS STREET, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱43.7M | 100% | Medium risk47 | —-0.093 |
| 36 | 25OE0014REHABILITATION OF ROAD WITH DRAINAGE STRUCTURE IMPROVEMENT ALONG YOUNGER STREET, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱34M | 100% | Medium risk47 | —-0.093 |
| 37 | 25OE0018PREVENTIVE MAINTENANCE - SECONDARY ROADS - ESPANA BLVD - K0005 + (-523) - K0005 + (-015) | National Capital Region | North Manila DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.095 |
| 38 | 25OE0020PREVENTIVE MAINTENANCE - TERTIARY ROADS - OLD STA MESA - K0008 + (-903.10) - K0008 + (-334.80) | National Capital Region | North Manila DEO | Completed | ₱32.7M | 100% | Medium risk47 | —-0.098 |
| 39 | 22OB0395REHABILITATION/MAJOR REPAIR OF PASIG BLVD C5 FLYOVER (SB) (B01876LZ) ALONG C5 ROAD, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.7M | 100% | Medium risk47 | —-0.065 |
| 40 | 23OE0135PREVENTIVE MAINTENANCE - SECONDARY ROADS - R MAGSAYSAY BLVD. - K0004 + (-200.50) - K0004 + (373.50) | National Capital Region | North Manila DEO | Completed | ₱24M | 100% | Medium risk46 | —-0.098 |
| 41 | 25OE0115REHABILITATION OF DRAINAGE SYSTEM ALONG P. PAREDES ST., MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱38.4M | 1% | Medium risk46 | —-0.028 |
| 42 | 23OE0158REHABILITATION OF ESTERO DE SUNOG APOG, (PHASE I), TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱21M | 100% | Medium risk46 | —-0.089 |
| 43 | 23OE0102PREVENTIVE MAINTENANCE - SECONDARY ROADS - C-2 ROAD - K0006 + 048.30 - K0006 +241.10 | National Capital Region | North Manila DEO | Completed | ₱8.8M | 100% | Medium risk46 | —-0.098 |
| 44 | 23OE0139REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CM RECTO -K0004 + 478 - K0004 + 1212.50 | National Capital Region | North Manila DEO | Completed | ₱10.6M | 100% | Medium risk46 | —-0.100 |