Contractor dossier
108 projects on file, including joint ventures this contractor is part of.
Total projects
108
Total budget
₱4.3B
Average progress
96.4%
Completion rate
77.8%
Average risk score
55.9
Medium risk on average, out of 100
Flagged as unusual
12
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 108 | ₱4.3B | 55.9 | 12 | 96.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱1.9B | 51.3 | 0 | 99.5% |
| Flood Control and Drainage | 16 | ₱1.1B | 57.6 | 0 | 96.0% |
| Buildings and Facilities | 14 | ₱92M | 46.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱802.3M | 92.1 | 7 | 74.5% |
| OTHER | 3 | ₱108.1M | 79.0 | 3 | 91.1% |
| Bridges | 2 | ₱100M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱66.1M | 94.9 | 1 | 18.9% |
| GAA 2025 OO-1 | 1 | ₱66.6M | 94.2 | 1 | 93.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 18P00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL-PINUKPUK), APAYAO STA 3+960 - STA 4+900, STA 4+960 - STA 7+520 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱93.5M | 100% | High risk60 | —-0.069 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22PC0014CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURES, SWAN SECTION, STA.37+121 - STA.37+682 (R/S) PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱79.6M | 100% | Medium risk56 | —-0.054 |
| 27 | 22PC0005NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - AYAGA-STA.MARCELA-FLORA-LASAM RD - K0697+507 - K0699+082 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱60.3M | 100% | Medium risk56 | —-0.075 |
| 28 | 25PC0023OO 2 : PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, POBLACION SECTION | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱52.5M | 66% | Medium risk56 | —-0.019 |
| 29 | 19PC0051CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SANTA MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, HANDICRAFTS, BANANA, RICE, CORN AND TOURISM INDUSTRIES, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk56 | —-0.073 |
| 30 | 22PC0025(CSSP)CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - PUDTOL-BAGUTONG ROAD IN SUPPORT OF FURNITURE HANDICRAFTS, LOOMWEAVING, BANANA, PINEAPPLE, VEGETABLES, AND ROOT CROPS, CORN AND RICE, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.7M | 100% | Medium risk55 | —-0.077 |
| 31 | 22PC0010NETWORK DEVELOPMENT PROGRAM PAVING OF UNPAVED ROADS - TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD K0710+539 - K0711+061, K0711+126 - K0711+868 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱62M | 100% | Medium risk55 | —-0.075 |
| 32 | 18PC0011CONSTRUCTION OF MPB, POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk55 | —-0.075 |
| 33 | 25PC0034OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS&PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE,APAYAO-ABULUG RIVER BASIN,POBLACION SECTION,STA.136+127.68-STA.136+247.6 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱27.1M | 72% | Medium risk55 | —-0.022 |
| 34 | 24PC0004ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - ADAMS(ILOCOS NORTE)-CALANASAN(APAYAO) ROAD, PACKAGE 1, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱21.7M | 100% | Medium risk55 | —-0.046 |
| 35 | 22PC0043CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDIC | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.076 |
| 36 | 20PC0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS LYDIA-LALANGGAN ROAD LEADING TO PUDTOL TOURISM SITES, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.8M | 100% | Medium risk55 | —-0.079 |
| 37 | 23PC0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD PACKAGE 1, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱50.2M | 100% | Medium risk55 | —-0.075 |
| 38 | 24PB0005OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 80+321 - STA. 81+162 (R/S), KARAGAWAN, | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱74.8M | 100% | Medium risk55 | —-0.023 |
| 39 | 18PC0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES STA. MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, BANANA, CORN RICE, TOURISM INDUSTRIES 0+000-1+120, STA. MARIA-MALLIG, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.9M | 100% | Medium risk55 | —-0.078 |
| 40 | 23PC0050ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-ADAMS (ILOCOS NORTE)-CALANASAN(APAYAO) ROAD, PACKAGE 2, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱38.9M | 100% | Medium risk54 | —-0.076 |
| 41 | 18PC0039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PUDTOL-BAGUTONG ROAD IN SUPPORT OF HANDICRAFT 0+000-1+215, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.8M | 100% | Medium risk54 | —-0.080 |
| 42 | 18PC0017CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SABANGAN - DON ROQUE ROAD IN SUPPORT OF COFFEE, CACAO, COCONUT 0+000-0+808, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.7M | 100% | Medium risk54 | —-0.078 |
| 43 | 23PC0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - APAYAO (CALANASAN) - ILOCOS NORTE RD - (S00644LZ) CHAINAGE 4571-CHAINAGE 6571 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | Medium risk54 | —-0.066 |
| 44 | 19PC0050CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN JOSE-SAN SEBASTIAN-SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, PINEAPPLE, BANANA, VEGETABLES, RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk54 | —-0.078 |
| 45 | 20PC0044CONSTRUCTION OF MULTI-PURPOSE BUILDING, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.3M | 100% | Medium risk54 | —-0.070 |
| 46 | 24PC0029ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PENRO APAYAO (BUROT)-SAN ISIDRO-QUIRINO ROAD, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱49M | 100% | Medium risk54 | —-0.041 |
| 47 | 23PC0039ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PENRO APAYAO (BUROT)-SAN ISIDRO SUR-QUIRINO ROAD, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱48.3M | 100% | Medium risk54 | —-0.073 |
| 48 | 20PC0030NETWORK DEVELOPMENT PAVING OF UNPAVED ROADS-TERTIARY CLAVERIA-CALANASAN-KABUGAO ROAD CALANASAN, APAYAO K0710+(-172)-K0710+538 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱30.2M | 100% | Medium risk54 | —-0.076 |
| 49 | 25PC0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PENRO APAYAO (BUROT)-SAN ISIDRO-QUIRINO ROAD, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.4M | 67% | Medium risk54 | —-0.040 |
| 50 | 19PC0055CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYTEMS CONSTRUCTION OF POBLACION FLOOD CONTROL ALONG APAYAO RIVER, POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱23.8M | 100% | Medium risk54 | —-0.058 |