Contractor dossier
91 projects on file, including joint ventures this contractor is part of.
Total projects
91
Total budget
₱3B
Average progress
94.2%
Completion rate
81.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 50 | ₱1.1B | 42.5 | 4 | 95.5% |
| Region XI | 7 | ₱499.4M | 57.5 | 1 | 88.4% |
| Region IV-A | 7 | ₱138M | 46.7 | 0 | 100.0% |
| Region III | 7 | ₱374.6M | 35.2 | 1 | 99.4% |
| Region II | 4 | ₱175.6M | 79.6 | 2 | 83.3% |
| Region I | 4 | ₱256.3M | 47.6 | 0 | 84.5% |
| Region X | 3 | ₱183.5M | 50.4 | 0 | 85.0% |
| Region IX | 2 | ₱58.6M | 53.2 | 0 | 97.5% |
| Region VI | 2 | ₱49.2M | 46.5 | 0 | 100.0% |
| National Capital Region | 2 | ₱5.5M | 11.0 | 0 | 100.0% |
| Region V | 1 | ₱46.9M | 57.6 | 0 | 100.0% |
| Region XIII | 1 | ₱80.1M | 45.1 | 0 | 55.1% |
| Region XII | 1 | ₱48.2M | 29.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 33 | ₱1.3B | 41.3 | 0 | 93.2% |
| Flood Control and Drainage | 18 | ₱655.1M | 43.0 | 1 | 99.8% |
| Bridges | 16 | ₱474.3M | 40.5 | 0 | 100.0% |
| Buildings and Facilities | 10 | ₱229M | 34.1 | 0 | 100.0% |
| OTHER | 6 | ₱188.2M | 72.5 | 3 | 80.8% |
| GAA 2025 OO-1 | 3 | ₱65.6M | 91.1 | 2 | 57.0% |
| GAA 2025 SSP | 2 | ₱18.6M | 93.2 | 2 | 70.1% |
| Water Provision and Storage | 2 | ₱10.6M | 25.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱49M | 44.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EB0059CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAOTAO, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱11.9M | 77% | High risk93 | Flagged0.016 |
| 25EB0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱6.7M | 63% | High risk93 | Flagged0.022 |
| 25BA0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 49% | High risk92 | Flagged0.012 |
| 25EB0003REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT. TLLR-BINACAS RD (S00012LB) - K0006+340- K0006+610 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.1M | 22% | High risk91 | Flagged0.015 |
| 25EB0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TAGBAC-LUBANG-LOOC RD (S00004LB) - K0005+118- K0005+317 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.6M | 100% | High risk91 | —-0.000 |
| 24BA0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SUMNANGA, SABTANG, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱48.9M | 84% | High risk78 | Flagged0.017 |
| 24LI0114REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE III, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.5M | 30% | High risk76 | Flagged0.037 |
| 25EB0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUYANG BAGA CAVE, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱9.6M | 70% | High risk74 | Flagged0.003 |
| 23BA0040ORGANIZATION OUTCOME 1: ENSURE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 2 | Region II | Batanes DEO | Completed | ₱39.8M | 100% | High risk74 | —-0.010 |
| 23BA0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS ; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 1, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱37.9M | 100% | High risk74 | —-0.010 |
| 24L00237CONSTRUCTION OF ROAD, SATURNINO R. SILVA ROAD, CARMEN, DAVAO DEL NORTE PHASE 2 | Region XI | Region XI | On-Going | ₱96.1M | 94% | High risk62 | —-0.039 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LI0114REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE III, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.5M | 30% | High risk76 | Flagged0.037 |
| 25EB0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱6.7M | 63% | High risk93 | Flagged0.022 |
| 24BA0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SUMNANGA, SABTANG, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱48.9M | 84% | High risk78 | Flagged0.017 |
| 25EB0059CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAOTAO, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱11.9M | 77% | High risk93 | Flagged0.016 |
| 25EB0003REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT. TLLR-BINACAS RD (S00012LB) - K0006+340- K0006+610 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.1M | 22% | High risk91 | Flagged0.015 |
| 25BA0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 49% | High risk92 | Flagged0.012 |
| 24CI0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBATO RIVER (LEFT DIKE), BARANGAYS SAPANGBATO AND MARGOT, ANGELES CITY | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 96% | Medium risk45 | Flagged0.010 |
| 25EB0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUYANG BAGA CAVE, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱9.6M | 70% | High risk74 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23LF0057CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CATEEL RIVER (BARANGAY CENTRAL), STA. 0+000 - STA. 0+540, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱67.5M | 100% | Medium risk49 | —-0.061 |
| 27 | 24K00027CONSTRUCTION OF MISSING LINKS/NEW ROADS ILIGAN CITY-CAGAYAN DE ORO CITY ALTERNATE ROUTE (DIGKILAAN-BULUA SECTION), PACKAGE 9, LANAO DEL NORTE | Region X | Region X | On-Going | ₱46.8M | 100% | Medium risk49 | —-0.052 |
| 28 | 20EB0064CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO CABRA ISLAND, CABRA LIGHTHOUSE AND WHITE SAND BEACH, LUBANG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱71.9M | 100% | Medium risk48 | —-0.072 |
| 29 | 19EB0001RECONST. TO CONCRETE PAVEMENT - ALONG TAGBAC-LUBANG-LOOC RD (S00004LB) K0000+080 - K0000+774, K0001+417 - K0001+527, K0002+711 - K0003+000, K0005+675 - K0006+279, K0007+355 - K0007+395, K0007+631 - K0008+000, K0012+900 - K0013+000, LUBANG, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱62.5M | 100% | Medium risk47 | —-0.078 |
| 30 | 24AE0066REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - SN FERNANDO-BAGULIN RD K0275+000-K0275+258 | Region I | La Union 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.082 |
| 31 | 22DN0074CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ANGONO RIVER, BARANGAY SAN VICENTE (PACKAGE 2), ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱42.3M | 100% | Medium risk47 | —-0.086 |
| 32 | 20DN0099CONSTRUCTION OF CREEK WALL PROTECTION AT BILIBIRAN RIVER (DOWNSTREAM), BRGY. BILIBIRAN, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱14.4M | 100% | Medium risk47 | —-0.088 |
| 33 | 21DN0080CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE, SAMBERGA CREEK, CAINTA, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱24.7M | 100% | Medium risk47 | —-0.088 |
| 34 | 20DN0001CONSTRUCTION OF CREEK WALL PROTECTION, BILIBIRAN CREEK, BRGY. BILIBIRAN, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱20.9M | 100% | Medium risk47 | —-0.083 |
| 35 | 21DN0111CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE, BILIBIRAN CREEK (UPSTREAM) BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.090 |
| 36 | 19DN0039REHABILITATION OF DRAINAGE SYSTEM, MAGALLANES ST., BRGY. PILA-PILA, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱7.9M | 100% | Medium risk47 | —-0.089 |
| 37 | 19DN0038REHABILITATION OF OPEN CANAL FROM MAGALLANES ST. TO SITIO GUPIING, LUNSAD, BRGY. PILA PILA, BINANGONAN, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱7.9M | 100% | Medium risk47 | —-0.089 |
| 38 | 21GA0096TANGALAN BYPASS ROAD, AKLAN TANGALAN, AKLAN | Region VI | Aklan DEO | Completed | ₱31.5M | 100% | Medium risk47 | —-0.080 |
| 39 | 19GA0071CONST. OF FLOOD CONTROL STRUCTURE ALONG AKLAN RIVER, BRGY. BAKHAW NORTE (SITIO LIBOTON), KALIBO, AKLAN | Region VI | Aklan DEO | Completed | ₱17.6M | 100% | Medium risk46 | —-0.071 |
| 40 | 24CI0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBATO RIVER (LEFT DIKE), BARANGAYS SAPANGBATO AND MARGOT, ANGELES CITY | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 96% | Medium risk45 | Flagged0.010 |
| 41 | 23NE0031REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT-LORETO RD. K0027+990-K0028+316, BASILISA, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | On-Going | ₱80.1M | 55% | Medium risk45 | —-0.037 |
| 42 | 19EB0011WIDENING OF BRIDGE-ARIBUGAN BR. (B00107MR) ALONG MINDORO WEST COASTAL RD, STA.CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱47.8M | 100% | Medium risk45 | —-0.037 |
| 43 | 20EB0028RETROFITTING/STRENGTHENING OF BRIDGE-AMNAY BR. (B00102MR) ALONG MINDORO WEST COASTAL RD, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk44 | —-0.050 |
| 44 | 19EB0008CONSTRUCTION OF CONCRETE ROAD-JUNSTION MWCR (LABANGAN)-MURTHA-JUCTION IRIRON ROAD, MINDORO OCCIDENTAL | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk44 | —-0.050 |
| 45 | 24AE0067REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - ALILEM-SUGPON-SUDIPEN ROAD K0317+302-K0317+400, LA UNION | Region I | La Union 1st DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.085 |
| 46 | 19AH0128CONCRETING OF ROAD AT BRGY. PANGASCASAN, BUGALLON, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.088 |
| 47 | 22EB0039CONSTRUCTION OF CONCRETE BRIDGE - ACCESS ROAD LEADING TO DEVIL'S MOUNTAIN AND FARMS, BRGY. BATASAN, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱41.8M | 100% | Medium risk41 | —-0.052 |
| 48 | 20EB0044WIDENING OF BRIDGE - MAGNOT BR. 1 (B00197MR) ALONG MINDORO WEST COASTAL RD | Region IV-B | Mindoro Occidental DEO | Completed | ₱35.3M | 100% | Medium risk41 | —-0.043 |
| 49 | 20EB0045WIDENING OF BRIDGE - MAGNOT BR. 2 (B00198MR) ALONG MINDORO WEST COASTAL RD | Region IV-B | Mindoro Occidental DEO | Completed | ₱35.3M | 100% | Medium risk41 | —-0.045 |
| 50 | 19EB0126RETROFITTING/STRENGTHENING OF BRIDGE-MAMBURAO BR. (B00116MR) ALONG MINDORO WEST COASTAL RD | Region IV-B | Mindoro Occidental DEO | Completed | ₱38.3M | 100% | Medium risk40 | —-0.047 |