Contractor dossier
57 projects on file, including joint ventures this contractor is part of.
Total projects
57
Total budget
₱2.4B
Average progress
89.8%
Completion rate
64.9%
Below 70%
Average risk score
58.1
Medium risk on average, out of 100
Flagged as unusual
3
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 57 | ₱2.4B | 58.1 | 3 | 89.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 39 | ₱1.4B | 57.6 | 1 | 92.2% |
| Bridges | 7 | ₱353.1M | 52.4 | 0 | 96.5% |
| OTHER | 4 | ₱377.6M | 71.1 | 1 | 80.0% |
| Buildings and Facilities | 3 | ₱25.7M | 56.9 | 0 | 96.4% |
| Bridges, Roads | 2 | ₱184.4M | 61.2 | 0 | 69.0% |
| Flood Control and Drainage | 2 | ₱53.8M | 59.9 | 1 | 50.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 25DF0086CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAINE I, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱5.9M | 89% | High risk73 | —-0.038 |
| 20DF0178LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF INDANG-CABUCO-NAIC DIVERSION ROAD, TRECE MARTIRES CITY | Region IV-A | Cavite 1st DEO | Completed | ₱94.6M | 100% | High risk72 | —-0.017 |
| 18DF0092LOCAL PROGRAM -CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REMULLA AVENUE CONNECTION ROAD TO TRES CRUSES, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱137.5M | 100% | High risk71 | —-0.018 |
| 25DF0122CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY LIMBON, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
| 24DF0128ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0060 + (-318) - K0060 + 728 | Region IV-A | Cavite 1st DEO | On-Going | ₱56.2M | 0% | High risk71 | —-0.003 |
| 24DF0126ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0060 + 084- K0061 + 097 | Region IV-A | Cavite 1st DEO | On-Going | ₱52.9M | 90% | High risk70 | —-0.032 |
| 25DF0063ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY RDSTANZA-TRECE MARTIRES CITY-INDANG RD - K0058 + 000 - K0059 + 137 | Region IV-A | Cavite 1st DEO | Completed | ₱50.3M | 100% | High risk70 | —-0.069 |
| 25DF0058ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0041 + 000 - K0042 + 338 | Region IV-A | Cavite 1st DEO | Completed | ₱55.1M | 100% | High risk70 | —-0.067 |
| 20DF0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, CALIBUYO ROAD LEADING TO CAVITE GATEWAY TERMINAL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk68 | —-0.041 |
| 25DF0179ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0056 + 154 - K0056 + 262, K0058 + 558 - K0058 + 735, K0058 + 746 - K0059 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱38M | 100% | High risk67 | —-0.053 |
| 25DF0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0071 + 398 - K0072 + 306 | Region IV-A | Cavite 1st DEO | Completed | ₱30.4M | 100% | High risk67 | —-0.071 |
| 25DF0042ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSCRISANTO M. DE LOS REYES AVE - K0056 + 607 - K0057 + 506 | Region IV-A | Cavite 1st DEO | Completed | ₱32.9M | 100% | High risk67 | —-0.071 |
| 24DF0037ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMOFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0067 + 896 - K0069 + 767 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.3M | 0% | High risk67 | —-0.005 |
| 24DF0084ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMCONST/ UPGRADING/ REHAB OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS TANZA-TRECE MARTIRES CITY-INDANG RD - K0052 + (-385) -K0052+562 | Region IV-A | Cavite 1st DEO | On-Going | ₱26.4M | 50% | High risk67 | —-0.019 |
| 24DF0122ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0053 + 802 - K0053 + 963, K0057 + 573 - K0058 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱19.2M | 100% | High risk67 | —-0.039 |
| 25DF0108ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0064 + 669 - K0065 + 313 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.8M | 100% | High risk67 | —-0.051 |
| 25DF0040ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSJUANITO R. REMULLA, SR. RD - K0043 + 093 - K0043 + 434 | Region IV-A | Cavite 1st DEO | On-Going | ₱17M | 100% | High risk67 | —-0.052 |
| 24DF0048ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0038 + 770 - K0039 + 606 | Region IV-A | Cavite 1st DEO | Completed | ₱16.5M | 100% | High risk67 | —-0.070 |
| 25DF0009ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0046 + 189 - K0046 + 761 | Region IV-A | Cavite 1st DEO | Completed | ₱22.2M | 100% | High risk67 | —-0.070 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 22DF0362OPENING AND CONCRETING OF BRGY. KAYQUIT I TO BRGY. KAYQUIT III FMR, BRGY. KAYQUIT I AND KAYQUIT III, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Terminated | ₱15.8M | 100% | High risk65 | Flagged0.011 |
| 25DF0122CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY LIMBON, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22D00021CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST-WEST ROAD), INDANG-WEST SECTION, CAVITE | Region IV-A | Region IV-A | Completed | ₱95.4M | 100% | High risk61 | —-0.085 |
| 27 | 21DF0058LOCAL PROGRAMCONST. / REPAIR / REHAB. / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTSLOCAL ROADS AND BRIDGESLOCAL ROADSCONSTRUCTION OF SAHUD-ULAN-TRES CRUSES-TMC ROAD (PHASE 4), TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱92.6M | 100% | Medium risk59 | —-0.095 |
| 28 | 18DF0086ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱91.7M | 58% | Medium risk57 | —-0.017 |
| 29 | 23D00010CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), INDANG - EAST SECTION, PACKAGE 3, CAVITE | Region IV-A | Region IV-A | On-Going | ₱87.9M | 67% | Medium risk57 | —-0.022 |
| 30 | 23DF0186ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSDASMARINAS-GENERAL TRIAS-TANZA (TANZA SECTION), TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱76.4M | 100% | Medium risk55 | —-0.022 |
| 31 | 21DG0014CONST .OF CONCRETE BRIDGE - GEN. AGUINALDO-MAGALLANES-NASUGBU RD. (EAST-WEST RD), PACKAGE 2, GEN. A, | Region IV-A | Cavite 2nd DEO | Completed | ₱77.2M | 100% | Medium risk55 | —-0.055 |
| 32 | 20DF0122LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS REHABILITATION OF CONCHU RD., AMADEO SECTION, PHASE 1, STA. 4+800 - STA. 7+200, AMADEO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.103 |
| 33 | 20DF0125LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS REHABILITATION OF CONCHU RD., TRECE STATION, PHASE 2, STA. 02+400 - STA. 04+800, AMADEO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.103 |
| 34 | 18DF0076ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, TANZA-TRECE MARTIRES CITY-INDANG ROAD - K0049+472 - K0051+622 | Region IV-A | Cavite 1st DEO | Completed | ₱66.2M | 100% | Medium risk54 | —-0.103 |
| 35 | 24D00048CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), INDANG WEST SECTION, CAVITE | Region IV-A | Region IV-A | On-Going | ₱47.5M | 75% | Medium risk52 | —-0.020 |
| 36 | 23DF0146ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHAB./ RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0058 + 340 - K0058 +500 | Region IV-A | Cavite 1st DEO | Completed | ₱53.2M | 100% | Medium risk51 | —-0.104 |
| 37 | 24DF0127ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0052 + (-385) - K0053 + 231 | Region IV-A | Cavite 1st DEO | Completed | ₱52.3M | 100% | Medium risk51 | —-0.102 |
| 38 | 22DF0217ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADSSAN AGUSTIN - LUCIANO BY - PASS ROAD, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱52.9M | 100% | Medium risk51 | —-0.102 |
| 39 | 23DF0018CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES, AT DAUNGAN PROGRAM - KATUPARAN) CALIBUYO ROAD LEADING TO CAVITE GATEWAY TERMINAL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 40 | 21DF0103LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION OF MULTI-PURPOSE BUILDING (TRECE MARTIRES MEMORIAL PARK), BARANGAY AGUADO, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.103 |
| 41 | 21DF0040LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAGTAS, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.104 |
| 42 | 22DF0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONSTRUCTION OF REVETMENT ALONG CAÑAS RIVER, BRGY. DE OCAMPO SECTION, PHAS | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 43 | 22DF0047CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF HARASAN BRIDGE, INDANG CAVI | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.067 |
| 44 | 24D00001CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), AMADEO SECTION, CAVITE | Region IV-A | Region IV-A | On-Going | ₱32.8M | 96% | Medium risk47 | —-0.063 |
| 45 | 21DF0106ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMBRIDGE PROGRAMREHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGESOBISPO BR. (B02900LZ) ALONG NOVELETA - NAIC - TAGAYTAY ROAD | Region IV-A | Cavite 1st DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.068 |
| 46 | 22DF0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES, AT DAUNGAN PROGRAM - KATUPARAN),CALIBUYO ROAD LEADING TO CAVITE GATEWAY TERMINAL, TAN | Region IV-A | Cavite 1st DEO | Completed | ₱46.2M | 100% | Medium risk47 | —-0.103 |
| 47 | 21DF0101ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMBRIDGE PROGRAMREHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES CALIBUYO BR. (B02901LZ) ALONG NOVELETA-NAIC-TAGAYTAY ROAD | Region IV-A | Cavite 1st DEO | Completed | ₱9.3M | 100% | Medium risk47 | —-0.067 |
| 48 | 24DF0049ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0050 + 000 - K0050+ 866 | Region IV-A | Cavite 1st DEO | Completed | ₱28.3M | 100% | Medium risk47 | —-0.104 |
| 49 | 20DF0070ORGANIZATIONAL OUTCOME 1, ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, JUANITO R. REMULLA, SR. RD - K0040+916 - K0041+232, K0041+262 - K0 | Region IV-A | Cavite 1st DEO | Completed | ₱25.7M | 100% | Medium risk46 | —-0.105 |
| 50 | 21DF0211ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN AGUSTINE- LUCIANO BY-PASS ROAD, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱23.5M | 100% | Medium risk46 | —-0.107 |