Contractor dossier
115 projects on file, including joint ventures this contractor is part of.
Total projects
115
Total budget
₱4.2B
Average progress
94.0%
Completion rate
80.9%
Average risk score
43.5
Medium risk on average, out of 100
Flagged as unusual
10
8.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 114 | ₱4.1B | 43.4 | 10 | 93.9% |
| Region VIII | 1 | ₱94M | 59.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 42 | ₱2B | 46.5 | 0 | 94.3% |
| Buildings and Facilities | 36 | ₱215.1M | 28.1 | 1 | 97.2% |
| Flood Control and Drainage | 22 | ₱1.1B | 46.3 | 0 | 100.0% |
| Bridges | 8 | ₱486.3M | 50.9 | 3 | 79.3% |
| GAA 2025 SSP | 3 | ₱87.2M | 96.4 | 3 | 52.7% |
| OTHER | 3 | ₱218M | 81.2 | 3 | 84.9% |
| GAA 2025 OO-2 | 1 | ₱96.3M | 83.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0119BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BYPASS/DIVERSION ROAD, TUGUEGARAO NORTH DIVERSION ROAD, PACKAGE B | Region II | Cagayan 3rd DEO | On-Going | ₱48.5M | 44% | High risk96 | Flagged0.026 |
| 25BD0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BASI WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.2M | 53% | High risk96 | Flagged0.024 |
| 25BD0094SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CENTRO NORTH WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.5M | 61% | High risk96 | Flagged0.023 |
| 24BD0156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING RD PHASE III | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 86% | High risk84 | Flagged0.018 |
| 25BC0014ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTUR | Region II | Cagayan 2nd DEO | Completed | ₱96.3M | 100% | High risk83 | —-0.021 |
| 23BD0041BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGUEGARAO EAST CENTRAL SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱49.4M | 72% | High risk82 | Flagged0.025 |
| 24BC0083CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, PHASE 2, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱72.3M | 97% | High risk78 | Flagged0.014 |
| 23B00048OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2 | Region II | Region II | On-Going | ₱285.9M | 82% | High risk69 | Flagged0.030 |
| 24B00018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULUYANBAGAY-BUNTUN), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱149.4M | 97% | High risk64 | —-0.030 |
| 24B00106OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, DIADI, NUEVA VIZCAYA | Region II | Region II | On-Going | ₱101.2M | 42% | High risk61 | Flagged0.004 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23B00048OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2 | Region II | Region II | On-Going | ₱285.9M | 82% | High risk69 | Flagged0.030 |
| 25BD0119BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BYPASS/DIVERSION ROAD, TUGUEGARAO NORTH DIVERSION ROAD, PACKAGE B | Region II | Cagayan 3rd DEO | On-Going | ₱48.5M | 44% | High risk96 | Flagged0.026 |
| 24B00158DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - NUEVA VIZCAYA PROVINCIAL HOSPITAL | Region II | Region II | On-Going | ₱47.7M | 0% | Medium risk49 | Flagged0.026 |
| 23BD0041BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGUEGARAO EAST CENTRAL SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱49.4M | 72% | High risk82 | Flagged0.025 |
| 25BD0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BASI WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.2M | 53% | High risk96 | Flagged0.024 |
| 25BD0094SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CENTRO NORTH WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.5M | 61% | High risk96 | Flagged0.023 |
| 24BD0156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING RD PHASE III | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 86% | High risk84 | Flagged0.018 |
| 24BC0083CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, PHASE 2, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱72.3M | 97% | High risk78 | Flagged0.014 |
| 25B00025OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON - CORDON - DIADI BYPASS ROAD, DIADI, NUEVA VIZCAYA - PACKAGE 1 | Region II | Region II | On-Going | ₱52.8M | 10% | Medium risk51 | Flagged0.004 |
| 24B00106OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, DIADI, NUEVA VIZCAYA | Region II | Region II | On-Going | ₱101.2M | 42% | High risk61 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BD0119BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BYPASS/DIVERSION ROAD, TUGUEGARAO NORTH DIVERSION ROAD, PACKAGE B | Region II | Cagayan 3rd DEO | On-Going | ₱48.5M | 44% | High risk96 | Flagged0.026 |
| 2 | 25BD0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BASI WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.2M | 53% | High risk96 | Flagged0.024 |
| 3 | 25BD0094SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CENTRO NORTH WEST, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱19.5M | 61% | High risk96 | Flagged0.023 |
| 4 | 24BD0156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING RD PHASE III | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 86% | High risk84 | Flagged0.018 |
| 5 | 25BC0014ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTUR | Region II | Cagayan 2nd DEO | Completed | ₱96.3M | 100% | High risk83 | —-0.021 |
| 6 | 23BD0041BASIC INFRASTRUCTURE PROGRAM - MULTI- PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, TUGUEGARAO EAST CENTRAL SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱49.4M | 72% | High risk82 | Flagged0.025 |
| 7 | 24BC0083CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, PHASE 2, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱72.3M | 97% | High risk78 | Flagged0.014 |
| 8 | 23B00048OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: CONSTRUCTION OF MISSING LINKS/NEW ROADS -TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 2 | Region II | Region II | On-Going | ₱285.9M | 82% | High risk69 | Flagged0.030 |
| 9 | 24B00018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULUYANBAGAY-BUNTUN), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱149.4M | 97% | High risk64 | —-0.030 |
| 10 | 24B00106OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, DIADI, NUEVA VIZCAYA | Region II | Region II | On-Going | ₱101.2M | 42% | High risk61 | Flagged0.004 |
| 11 | 23B00017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 2, CAGAYAN | Region II | Region II | On-Going | ₱106.1M | 71% | Medium risk60 | —-0.024 |
| 12 | 23B00006OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱106.1M | 92% | Medium risk60 | —-0.028 |
| 13 | 24B00052CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ) - K0249 + 000 - K0251 + 000, K0284 + 542.70 - | Region II | Region II | On-Going | ₱181.3M | 68% | Medium risk59 | —-0.020 |
| 14 | 20I00036NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS ORMOC - BAYBAY - SOUTHERN LEYTE BDRY. RD. K1079+145 - K1080+K794, K1080+827 - K1081+254, K1101+900 - K1102+351, K1102+372 - K1103+199, LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱94M | 100% | Medium risk59 | —-0.085 |
| 15 | 22B00017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS: SAN JOSE-QUIBAL ROAD, PACKAGE 1, CAGAYAN | Region II | Region II | On-Going | ₱115M | 92% | Medium risk59 | —-0.017 |
| 16 | 23B00026OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 3, CAGAYAN | Region II | Region II | Completed | ₱100.4M | 100% | Medium risk59 | —-0.065 |
| 17 | 18B00029OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: NETWORK DEV'T: ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA (LZ), K0309+000-K0309+467, K0314+000-K0314+208, K0317+000-K0317+245, K0335+000-K0336+000, CORDON, SAN ISIDRO, ECHAGUE, ISABELA | Region II | Region II | Completed | ₱166.9M | 100% | Medium risk59 | —-0.052 |
| 18 | 22B00018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS: SAN JOSE-QUIBAL ROAD, PACKAGE 2, CAGAYAN | Region II | Region II | On-Going | ₱100M | 100% | Medium risk58 | —-0.019 |
| 19 | 25BC0016ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CANAYUN FLOOD CONTROL STRUCTRE | Region II | Cagayan 2nd DEO | Completed | ₱96.4M | 100% | Medium risk58 | —-0.050 |
| 20 | 24BD0155ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING RD PHASE II | Region II | Cagayan 3rd DEO | On-Going | ₱96.4M | 100% | Medium risk57 | —-0.041 |
| 21 | 21BD0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN JOSE - QUIBAL ROAD, PEÑABLANCA, PACKAGE 3, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱91.9M | 100% | Medium risk57 | —-0.063 |
| 22 | 24B00014OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAYOMBONG-QUEZON-BAGABAG ROAD, NUEVA VIZCAYA | Region II | Region II | On-Going | ₱95.1M | 96% | Medium risk56 | —-0.041 |
| 23 | 17BH0024CONSTRUCTION OF BRGY. QUEZON FMR | Region II | Isabela 4th DEO | Completed | ₱4.7M | 100% | Medium risk52 | —-0.001 |
| 24 | 21BH0203REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS/ SLOPE COLLAPSE AND LANDSLIDE, DIGUMASED, DINAPIGUE, ISABELA | Region II | Isabela 4th DEO | Completed | ₱81.7M | 100% | Medium risk51 | —-0.068 |
| 25 | 22BD0050002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - PINACANAUAN RIVER FLOOD MANAGEMENT PROJECTS, SAN ROQUE, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.048 |