Contractor dossier
79 projects on file, including joint ventures this contractor is part of.
Total projects
79
Total budget
₱4.9B
Average progress
88.9%
Completion rate
72.2%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
5
6.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 79 | ₱4.9B | 54.0 | 5 | 88.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 30 | ₱1.9B | 53.1 | 0 | 94.0% |
| Roads | 25 | ₱1.3B | 48.8 | 2 | 86.7% |
| Buildings and Facilities | 20 | ₱1.3B | 55.1 | 1 | 84.8% |
| GAA 2025 OO-2 | 2 | ₱216.9M | 93.5 | 0 | 91.4% |
| OTHER | 2 | ₱145.4M | 81.9 | 2 | 79.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ID0048CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG HIBUGA RIVER BASIN(DOWNSTREAM),BARANGAY STA. ANA, LA PAZ,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱96.4M | 93% | High risk94 | —-0.007 |
| 25I00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM), BARANGAY SANTOL, SAN MIGUEL, LEYTE | Region VIII | Region VIII | On-Going | ₱120.4M | 90% | High risk93 | —-0.006 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IC0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MAINIT - SAN MIGUEL - SANTOL ROAD, K0943+677 - K0944+077, K0944+097 - K0945+000, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49M | 66% | High risk81 | Flagged0.015 |
| 23I00129BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF FOUR (4) STOREY BUILDING WITH ROOF DECK FOR THE PROFESSIONAL REGULATION COMMISSION (PRC) REGIONAL OFFICE VIII - TACLOBAN IN GOVERNMENT CENTER, BRGY. CAND | Region VIII | Region VIII | On-Going | ₱328.9M | 0% | High risk69 | Flagged0.025 |
| 25IM0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER, PHASE 2, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 50% | High risk68 | —-0.012 |
| 24IM0003CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGBAO RIVER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱144.7M | 75% | High risk68 | —-0.011 |
| 22I00107CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Region VIII | On-Going | ₱123.3M | 93% | High risk67 | —-0.021 |
| 17I00055CONSTRUCTION OF EVACUATION CENTER, CATBALOGAN, SAMAR | Region VIII | Region VIII | Completed | ₱31.5M | 100% | High risk66 | —-0.065 |
| 24IC0107CONSTRUCTION OF TANAUAN BY-PASS ROAD, LEYTE BRGY. CAMIRE, TANAUAN TO BRGY. CABARASAN GUTI, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 51% | High risk65 | —-0.023 |
| 23IC0117CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TANAUAN BYPASS ROAD, BRGY. MARIBI, BRGY. CABALAGNAN, BRGY. BARAS, AND BRGY. CAMIRE, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 73% | High risk65 | —-0.024 |
| 24I00402SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF TOLOSA - DULAG BY-PASS ROAD, LEYTE | Region VIII | Region VIII | On-Going | ₱144.7M | 0% | High risk65 | —-0.012 |
| 23IM0104CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 50% | High risk65 | Flagged0.028 |
| 23IC0118CONSTRUCTION OF BYPASS AND DIVERSION ROADS - TOLOSA - SAN VICTOR - TABONTABON ROAD, BRGY. SAN VICTOR, BRGY. ADA, BRGY. CABONGA-AN AND BRGY. CANBALISARA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱144.6M | 53% | High risk65 | —-0.018 |
| 23IM0102OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 44% | High risk65 | Flagged0.030 |
| 24IC0115CONSTRUCTION OF MULTI-PURPOSE BUILDING (DANIEL Z. ROMUALDEZ MEMORIAL AUDITORIUM), TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱99M | 61% | High risk65 | —-0.028 |
| 20IC0039CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-CONST. OF FLOOD STRUCTURE AND DRAINAGE, BRGY. CAMPETIC AND PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱95.1M | 100% | High risk64 | —-0.067 |
| 23IM0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 3, CAMANSIHAY, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | Completed | ₱96.1M | 100% | High risk64 | —-0.069 |
| 24IC0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (UPSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.9M | 73% | High risk63 | —-0.015 |
| 24IC0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAMBULAWAN RIVER (DOWNSTREAM), BRGY. PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱97M | 85% | High risk63 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23IM0102OPENING/CONCRETING OF BRGY. 103 PALANOG TO BRGY. 104 SALVACION FMR, BRGY. 103 PALANOG AND BRGY. 104 SALVACION, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 44% | High risk65 | Flagged0.030 |
| 23IM0104CONCRETING OF BRGY. 103-A PAGLAUM TO BRGY. 103 PALANOG FMR, BRGY. 103-A PAGLAUM AND BRGY. 103 PALANOG, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱99.4M | 50% | High risk65 | Flagged0.028 |
| 23I00129BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF FOUR (4) STOREY BUILDING WITH ROOF DECK FOR THE PROFESSIONAL REGULATION COMMISSION (PRC) REGIONAL OFFICE VIII - TACLOBAN IN GOVERNMENT CENTER, BRGY. CAND | Region VIII | Region VIII | On-Going | ₱328.9M | 0% | High risk69 | Flagged0.025 |
| 23IK0104CONST. OF MULTI-PURPOSE BLDG.- CONST. OF DPWH SAMAR 2ND DEO NEW BLDG., CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.5M | 93% | High risk83 | Flagged0.020 |
| 24IC0007NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - MAINIT - SAN MIGUEL - SANTOL ROAD, K0943+677 - K0944+077, K0944+097 - K0945+000, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49M | 66% | High risk81 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20I00082CONSTRUCTION OF HOSPITAL BUILDING EASTERN VISAYAS REGIONAL MEDICAL CENTER, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱72.3M | 100% | High risk62 | —-0.080 |
| 27 | 18IM0055CONSTRUCTION OF DPWH STANDARD THREE-STOREY (15 CLASSROOMS) SCHOOL BUILDING (9.5M X 55.00M) 2 UNITS, NORTH HILL ARBOURS INTEGRATED SCHOOL, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱70.4M | 100% | High risk60 | —-0.040 |
| 28 | 19ID0029NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS,PALO-CARIGARA-ORMOC RD. K0947+277-K0947+576,K0947+607-K0950+229 | Region VIII | Leyte 2nd DEO | Completed | ₱96.4M | 100% | Medium risk60 | —-0.085 |
| 29 | 17IC0060NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-OTHER PRIMARY ALONG PALO-CARIGARA-ORMOC ROAD, K0916+(-107) - K0916+795, K0916+809 - K0916+(-107), K0926+407 - K0927+221, K0927+233 - K0928+673, PALO-ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱108.1M | 100% | Medium risk59 | —-0.047 |
| 30 | 18IM0054CONSTRUCTION OF DPWH STANDARD FOUR-STOREY (20 CLASSROOMS) SCHOOL BUILDING (9.5M X 46.00M), GUADALUPE HEIGHTS INTEGRATED SCHOOL, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱56M | 100% | Medium risk59 | —-0.031 |
| 31 | 18I00078RECONSTRUCTION / REHABILITATION OF DTI RO 8 BUILDINGS - CLUSTERED, DTI REGIONAL OFFICE VIII, PAWING, PALO, LEYTE: 1) RECONST./IMPRVT. OF DTI MAIN OFFICE BLDG; 2) REPAIR/REHAB. OF RCITC BLDG. WITH FENCE, PAWING, PALO, LEYTE | Region VIII | Region VIII | Completed | ₱61.6M | 100% | Medium risk59 | —-0.036 |
| 32 | 20IM0024IMPROVEMENT OF TACLOBAN CITY CONVENTION CENTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱48.9M | 100% | Medium risk59 | —-0.092 |
| 33 | 25IC0080CONSTRUCTION OF MULTI-PURPOSE BUILDING (ABC HALL BUILDING), ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱49.5M | 56% | Medium risk59 | —-0.042 |
| 34 | 22IM0054REHABILITATION OF TACLOBAN CONVENTION CENTER (PHASE 2), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱39.2M | 100% | Medium risk57 | —-0.094 |
| 35 | 21IM0021CONSTRUCTION OF MULTI-PURPOSE BUILDING (TACLOBAN CITY CONVENTION CENTER), TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱38.8M | 100% | Medium risk57 | —-0.095 |
| 36 | 17ID0027PREVENTIVE MAINTENANCE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4(HDM-4)-TERTIARY BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA ROAD(S00069LT)K0937+888-K0938+800,K0943+728-K0944+371 | Region VIII | Leyte 2nd DEO | Completed | ₱11.6M | 100% | Medium risk57 | —-0.059 |
| 37 | 17ID0047NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE STA. FE-PASTRANA-DAGAMI ROAD (S0096LT) K0930+ -252 - K0931+309; K0931+480 - K0931+758; K0931+774 - K0933+000 | Region VIII | Leyte 2nd DEO | Completed | ₱24.2M | 100% | Medium risk55 | —-0.060 |
| 38 | 20ID0045CONSTRUCTION OF TWO-STOREY DPWH ENGINEERING OFFICE BUILDING,MAC ARTHUR, LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱37.9M | 100% | Medium risk55 | —-0.089 |
| 39 | 18IM0053CONSTRUCTION OF DPWH STANDARD THREE-STOREY (15 CLASSROOMS) SCHOOL BUILDING (9.5M X 55.00M), GREENDALE RESIDENCES INTEGRATED SCHOOL, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱42.5M | 100% | Medium risk55 | —-0.047 |
| 40 | 21IC0042CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE AND DRAINAGE, BRGY. CAMPETIC AND PAWING, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱88.4M | 100% | Medium risk55 | —-0.071 |
| 41 | 21IC0041CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE AND DRAINAGE, BRGY. PAWING, BARAS AND CANDAHUG, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱87.4M | 100% | Medium risk55 | —-0.071 |
| 42 | 21IA0121REHABILITATION OF SHORELINE PROTECTION AT BRGY. LANGGAO AND BRGY. TALIBONG (11.514568, 124.615821 TO 11.507178, 124.613369) | Region VIII | Biliran DEO | Completed | ₱47.3M | 100% | Medium risk54 | —-0.027 |
| 43 | 19IC0017REHAB./MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REHAB. OF FLOOD CONTROL WALL ALONG BAHAY CREEK, BRGY. GUINDAPUNAN, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱70.3M | 100% | Medium risk53 | —-0.077 |
| 44 | 19I00103CONSTRUCTION (COMPLETION) OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, SECTION 5 PHASE 13A, STATION 6+100 - STATION 6+221, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱66.6M | 100% | Medium risk53 | —-0.060 |
| 45 | 20IH0021REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CATARMAN - CALBAYOG RD. - K0782+524 - K0782+599; K0765+460 - K0765+480; K0767+473 - K0767+505, BRGY. MAGSAYSAY AND BRGY. GERATIGAN, LOPE DE VEGA AND BRGY. C | Region VIII | Northern Samar 1st DEO | Completed | ₱48M | 100% | Medium risk52 | —-0.094 |
| 46 | 21ID0068CONSTRUCTION OF SLOPE PROTECTION ALONG BURAUEN-MAHAGNAO ROAD K0991+763-K0993+425,BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱49.3M | 100% | Medium risk52 | —-0.094 |
| 47 | 20ID0064REHABILITATION AND IMPROVEMENT OF ROAD ALONG SAN ANTONIO-LANAWAN-SAN VICENTE-KAGBANA MAC ARTHUR-BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.094 |
| 48 | 20IG0058IMPROVEMENT OF POBLACION - MABAGON ROAD, HINDANG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱47.8M | 100% | Medium risk52 | —-0.094 |
| 49 | 18IC0063CONST./REHAB. OF VARIOUS FMR IN TANAUAN, LEYTE:1.) BRGY. PASIL TO BRGY. TUGOP-P4,570,862.42; 2.)BRGY. CAMIRE TO BRGY. BALUD-P 2,688,742.83 3.)BRGY. CATMON TO BRGY. ARADO - P 1,980,706.89 4.) BRGY. CATMON TO BRGY. CANBALISARA - P 4,526,050.73 5.) BRGY. PAS | Region VIII | Leyte 1st DEO | Completed | ₱35.4M | 100% | Medium risk51 | —-0.038 |
| 50 | 20IC0067CONSTRUCTION OF TWO (2) STOREY SCHOOL BUILDING EASTERN VISAYAS STATE UNIVERSITY, TANAUAN CAMPUS, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱8.7M | 100% | Medium risk51 | —-0.097 |