Contractor dossier
124 projects on file, including joint ventures this contractor is part of.
Total projects
124
Total budget
₱4.3B
Average progress
93.5%
Completion rate
76.6%
Average risk score
48.9
Medium risk on average, out of 100
Flagged as unusual
15
12.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 122 | ₱4.2B | 49.1 | 15 | 93.4% |
| Region III | 1 | ₱96.5M | 56.0 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱1.7M | 19.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 57 | ₱3.5B | 55.8 | 10 | 93.2% |
| Buildings and Facilities | 40 | ₱502.8M | 41.9 | 2 | 93.6% |
| Roads | 19 | ₱160.4M | 43.9 | 1 | 94.7% |
| Bridges | 6 | ₱59.9M | 41.8 | 0 | 100.0% |
| OTHER | 1 | ₱16.4M | 73.4 | 1 | 91.0% |
| Water Provision and Storage | 1 | ₱9.8M | 49.0 | 1 | 53.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23AI0160CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱16.4M | 91% | High risk73 | Flagged0.010 |
| 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23A00439CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 22AI0051CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BARANGAY DIKET-DON JUSTO ABALOS, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱49M | 100% | High risk70 | —-0.045 |
| 22A00182BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL GROUND, BARANGAY POBLACION, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk70 | Flagged0.024 |
| 22A00211SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱47.8M | 0% | High risk70 | Flagged0.036 |
| 23A00441CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 1) | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 17AI0070CONSTN/REHAB/UPGRADING OF DRAINAGE ALONG NATL RD, BAKIT-BAKIT JCTN-UMINGAN RD, KO 180+167; KO 202+26 | Region I | Pangasinan 3rd DEO | Completed | ₱11.1M | 100% | High risk65 | —-0.058 |
| 22A00303BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF ROAD, NANGUNEG-SAN PEDRO BARANGAY ROAD, NARVACAN, ILOCOS SUR | Region I | Region I | On-Going | ₱19.8M | 0% | High risk64 | Flagged0.025 |
| 25AI0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 25AI0155CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱93.6M | 71% | High risk64 | —-0.022 |
| 25AI0032CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
| 25AI0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.3M | 100% | High risk64 | —-0.036 |
| 25AI0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGASIT RIVERS, BALUNGAO-SANTA MARIA, PANGASINAN (PANGASINAN 1) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.2M | 100% | High risk64 | —-0.036 |
| 25AI0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 3) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk64 | —-0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 22A00211SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE, BARANGAY NALSIAN, MANAOAG, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱47.8M | 0% | High risk70 | Flagged0.036 |
| 23A00439CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 23A00441CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 1) | Region I | Region I | Completed | ₱96.5M | 100% | High risk70 | Flagged0.025 |
| 22A00303BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF ROAD, NANGUNEG-SAN PEDRO BARANGAY ROAD, NARVACAN, ILOCOS SUR | Region I | Region I | On-Going | ₱19.8M | 0% | High risk64 | Flagged0.025 |
| 22A00182BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPAL GROUND, BARANGAY POBLACION, AGUILAR, PANGASINAN | Region I | Pangasinan 2nd DEO | On-Going | ₱4.8M | 0% | High risk70 | Flagged0.024 |
| 24AI0237CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING FOR JUAN G. MACARAEG NATIONAL HIGH SCHOOL, CANARVACANAN, BINALONAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱39.2M | 42% | Medium risk49 | Flagged0.020 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23AI0160CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱16.4M | 91% | High risk73 | Flagged0.010 |
| 24AG0185FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION STRUCTURE AT BALINCAGUING RIVER, STA. 18 + 940 - STA. 19+ 340, BARANGAY TAMBACAN, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | Flagged0.006 |
| 23AI0139CONCRETING/IMPROVEMENT OF SOLAR POTABLE WATER SYSTEM AT BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱9.8M | 53% | Medium risk49 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24AI0148CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LAGASIT RIVER, PACKAGE B, BALUNGAO-SANTA MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱96.4M | 100% | High risk63 | —-0.060 |
| 27 | 25A00472CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 2) | Region I | Region I | On-Going | ₱140.4M | 62% | High risk63 | —-0.008 |
| 28 | 25A00471CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 1) | Region I | Region I | On-Going | ₱140.4M | 82% | High risk63 | —-0.017 |
| 29 | 25A00473CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 3) | Region I | Region I | On-Going | ₱93.6M | 67% | High risk62 | —-0.020 |
| 30 | 25AG0020FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN BALINGCAGUING RIVER (DANGLEY SECTION), BRGY. DANGLEY, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱94.6M | 100% | High risk61 | —-0.049 |
| 31 | 24AF0195CONST. OF FLOOD CONTROL STRUCTURE, STO. TOMAS, LA UNION | Region I | La Union 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.058 |
| 32 | 24AG0185FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION STRUCTURE AT BALINCAGUING RIVER, STA. 18 + 940 - STA. 19+ 340, BARANGAY TAMBACAN, BURGOS, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | Flagged0.006 |
| 33 | 24AG0138SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (BOBOY SECTION),STA.000+610-STA.001+040 | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.051 |
| 34 | 24CK0102REHABILITATION OF EXISTING DIKE ALONG MAET CREEK (LEFT AND RIGHT BANK), D/S OF LARA BRIDGE (PHASE V), STA. 3+004.50 TO STA. 3+479.50, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.080 |
| 35 | 21AI0168CONSTRUCTION OF MULTI-PURPOSE BUILDING, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱48.9M | 100% | Medium risk56 | —-0.073 |
| 36 | 25AI0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (CRISIS MANAGEMENT BUILDING) TUMANA WEST, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱43.2M | 0% | Medium risk55 | —-0.015 |
| 37 | 22AI0169CONSTRUCTION OF MULTI-PURPOSE BUILDING (CRISIS MANAGEMENT BUILDING), TUMANA WEST, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱29.4M | 100% | Medium risk55 | —-0.084 |
| 38 | 16AI0266WIDENING OF PERMANENT BRIDGES TO MORE THAN TWO LANES W/ RROW ACQUISITION AT ACOSTA BRIDGE (B00746LZ) | Region I | Pangasinan 3rd DEO | Completed | ₱18.8M | 100% | Medium risk55 | —-0.028 |
| 39 | 25AI0052CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALORAGAT RIVER, PACKAGE 4, BINALONAN - LAOAC, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱48.3M | 99% | Medium risk54 | —-0.040 |
| 40 | 21AI0072CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TIPOSU, URDANETA CITY, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk54 | —-0.088 |
| 41 | 19A00131VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDING AND OTHER STRUCTURES - MULTIPURPOSE FACILITIES - CONSTRUCTION OF 3-STOREY OFFICE AND BARRACKS BUILDING FOR 2ND PROVINCIAL MOBILE FORCE COMPANY (PMFC), TAYUG, PANGASINAN | Region I | Region I | Completed | ₱19.3M | 100% | Medium risk54 | —-0.084 |
| 42 | 24AI0242CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) BALUNGAO, PANGASINAN (PHASE 2) | Region I | Pangasinan 3rd DEO | On-Going | ₱19.6M | 100% | Medium risk53 | —-0.051 |
| 43 | 23AI0069CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) BARANGAY CASANTAAN, URDANETA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱5.9M | 100% | Medium risk53 | —-0.086 |
| 44 | 22AI0170CONSTRUCTION OF TUMANA MULTI-PURPOSE BUILDING, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱19.4M | 100% | Medium risk53 | —-0.087 |
| 45 | 17AH0039REHAB/MAJOR REPAIR OF PERMANENT BR AT TATAG BR (B02138LZ) ALONG PANG-ZAMB RD, LABRADOR, PANG | Region I | Pangasinan 2nd DEO | Completed | ₱8.1M | 100% | Medium risk53 | —-0.025 |
| 46 | 21AI0124CONSTRUCTION OF MULTI-PURPOSE BUILDING AT STA. MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.075 |
| 47 | 22AI0015CONSTRUCTION OF MULTI-PURPOSE BUILDING, CONVERTIBLE TO EVACUATION CENTER, BARANGAY SAN PEDRO APARTADO, ALCALA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱6.9M | 100% | Medium risk52 | —-0.088 |
| 48 | 24AI0112CONSTRUCTION OF MULTI-PURPOSE BUILDING BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱14.8M | 100% | Medium risk52 | —-0.088 |
| 49 | 21AI0058CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAYAMBANAN, URDANETA CITY, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱5.3M | 100% | Medium risk52 | —-0.086 |
| 50 | 19AI0208CONSTRUCTION OF MULTI-PURPOSE BUILDING AT STA. MARIA, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱8.1M | 100% | Medium risk52 | —-0.090 |