94 projects on file, including joint ventures this contractor is part of.
Total projects
94
Total budget
₱1.6B
Average progress
96.5%
Completion rate
85.1%
Average risk score
44.9
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 82 | ₱746.1M | 40.2 | 0 | 100.0% |
| Region III | 12 | ₱859.6M | 77.2 | 0 | 72.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 37 | ₱249.9M | 40.1 | 0 | 100.0% |
| Roads | 28 | ₱468.2M | 45.9 | 0 | 100.0% |
| Water Provision and Storage | 15 | ₱48.4M | 30.0 | 0 | 100.0% |
| Flood Control and Drainage | 11 | ₱810.7M | 77.7 | 0 | 69.8% |
| Bridges | 2 | ₱25.9M | 40.3 | 0 | 100.0% |
| OTHER | 1 | ₱2.5M | 66.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25C00362FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (UPSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 76% | High risk81 | —-0.019 |
| 25C00372FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALASAG (DOWNSTREAM), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 97% | High risk81 | —-0.026 |
| 25CP0092CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 51% | High risk81 | —-0.009 |
| 25CP0093CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. CAMACHILE, DONA REMEDIO | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 88% | High risk81 | —-0.022 |
| 25CP0098CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS .PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEG. A (SIOJO ST. SEC.), | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 25CP0099CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTS. PRTOTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT B (SIOJO ST. SEC.) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 89% | High risk81 | —-0.022 |
| 25CP0097CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONS. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER (DOWNSTREAM), SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.6M | 64% | High risk74 | —-0.020 |
| 25CP0096CONVERG. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CTRL. STRUCT. ALONG MALANGAAN RIVER, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 73% | High risk74 | —-0.024 |
| 25CP0030FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BULO RIVER, BRGY. KING KABAYO, MIGUEL, BULACAN, PHASE I | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 77% | High risk73 | —-0.027 |
| 25CP0146CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT. | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 20% | High risk73 | —-0.010 |
| 25CP0147CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP- FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS/FACILITIES - CONST. OF MADLUM RIVER RIVERBANK SLOPE PROTECTION STRUCT, PUROK 2, BARANGAY SIBUL, SAN MIGUEL, BULACAN (UPST | Region III | Bulacan 3rd DEO | On-Going | ₱48.8M | 44% | High risk73 | —-0.018 |
| 24C00509BASIC INFRASTRUCTURE PROGRAM-BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MARONQUILLO-PASONG BANGKAL ROAD, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.9M | 100% | High risk72 | —-0.041 |
| 25FN0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE RAIN WATER COLLECTOR SYSTEM (RWCS) | Region V | Camarines Sur 5th DEO | On-Going | ₱2.5M | 100% | High risk66 | —-0.016 |
| 17FD0029CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CAMBALIDIO, LIBMANAN, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.1M | 100% | High risk62 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22FE0081OO1: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0397 + 364 - K0397 + 835 | Region V | Camarines Sur 2nd DEO | Completed | ₱26.7M | 100% | Medium risk52 | —-0.099 |
| 27 | 22FE0050CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGACAY-SAN PABLO ROAD, BRGY. BAGACAY, LIBMANAN, CAMARINES | Region V | Camarines Sur 2nd DEO | Completed | ₱14.4M | 100% | Medium risk52 | —-0.099 |
| 28 | 22FE0057CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - REHABILITATION OF SITIO KALANGKAWAN, SAN VICENTE - DANAWAN ROAD, BARANGAY SAN VICENTE, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱13.6M | 100% | Medium risk51 | —-0.099 |
| 29 | 23FD0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, ROLANDO A. ANDAYA HIGHWAY - K0 339+145 - K0339 + 262 | Region V | Camarines Sur 1st DEO | Completed | ₱12.6M | 100% | Medium risk51 | —-0.100 |
| 30 | 20FE0157CONCRETING OF SITIO SAN CIRILO BRGY. CAMBALIDIO FMR, BRGY. CAMBALIDIO, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱24.6M | 100% | Medium risk51 | —-0.045 |
| 31 | 23FD0035CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱7.4M | 100% | Medium risk51 | —-0.098 |
| 32 | 23FE0034CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF LIBMANAN CABUSAO PUMP IRRIGATION SYSTEM (LCPIS) MAIN CANAL | Region V | Camarines Sur 2nd DEO | Completed | ₱11.6M | 100% | Medium risk51 | —-0.099 |
| 33 | 21FE0025CONCRETING OF BRGY. PLANZA FMR, BRGY. PLANZA, SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱14.9M | 100% | Medium risk51 | —-0.047 |
| 34 | 20FE0155CONCRETING OF BRGY. SAN ISIDRO TO BRGY.ASLONG, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱24.6M | 100% | Medium risk51 | —-0.045 |
| 35 | 22FD0022CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN RAMON, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.099 |
| 36 | 23FE0006(CLUSTERED PROJECTS) CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - A. CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TINALMUD NUEVO, LIBMANAN, CAMARINES SUR; B. CONSTRUCTION (COM | Region V | Camarines Sur 2nd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.096 |
| 37 | 22FD0037CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN VICENTE, SIPOCOT, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.098 |
| 38 | 23FD0033CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABUSAO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱7.4M | 100% | Medium risk48 | —-0.099 |
| 39 | 22FE0003CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY INALAHAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.094 |
| 40 | 22FE0025CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JUAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.096 |
| 41 | 20FE0011LP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MANTALISAY, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.099 |
| 42 | 19FD0039LIP: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TABAN-FUNDADO, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.098 |
| 43 | 20FE0012LP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DANAWAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.099 |
| 44 | 20FE0013LP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAYCATMON, MILAOR, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.098 |
| 45 | 19FD0074LIP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF COVERED COURT, BRGY. BAHAY, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.098 |
| 46 | 20FE0006LP:BUILDINGS AND STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAGBUNGA, PAMPLONA, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.098 |
| 47 | 19FD0075CLUSTER-LIP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), A. BRGY. BUENAVISTA, SAN FERNANDO, CAMARINES SUR AND B. BRGY. DACULANG TUBIG, SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.098 |
| 48 | 20FE0014LP:BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PIPIAN, SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.099 |
| 49 | 20FE0033LP: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN JOAQUIN, SAN FERNANDO, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.099 |
| 50 | 18FN0067CONSTRUCTION OF TWO (2) STOREY, TWO (2) ICT LABORATORY BUILDING, HALUBAN NATIONAL HIGH SCHOOL, LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱12M | 100% | Medium risk44 | —-0.055 |