Contractor dossier
172 projects on file, including joint ventures this contractor is part of.
Total projects
172
Total budget
₱6.7B
Average progress
96.0%
Completion rate
82.0%
Average risk score
46.2
Medium risk on average, out of 100
Flagged as unusual
6
3.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 172 | ₱6.7B | 46.2 | 6 | 96.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 111 | ₱4.3B | 46.0 | 2 | 99.0% |
| Buildings and Facilities | 32 | ₱458.4M | 29.3 | 0 | 96.0% |
| Flood Control and Drainage | 10 | ₱997.3M | 57.1 | 0 | 77.5% |
| Bridges | 7 | ₱164.9M | 45.6 | 0 | 95.7% |
| OTHER | 6 | ₱478.7M | 74.9 | 1 | 100.0% |
| GAA 2025 SSP | 3 | ₱173.5M | 95.0 | 2 | 55.0% |
| GAA 2025 OO-1 | 2 | ₱102M | 92.2 | 1 | 81.9% |
| GAA 2025 OO-2 | 1 | ₱91.2M | 91.2 | 0 | 81.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 25KN0038CONSTRUCTION OF ROAD, BARANGAY NINOY AQUINO, KALILANGAN, BUKIDNON | Region X | Bukidnon 4th DEO | On-Going | ₱19.2M | 95% | High risk95 | —-0.000 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
| 25KB0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY), K1573+350-K1573+450, K1603+435-1603+470, K1604+890-K1604+910, KITAOTAO & DAMULOG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱46.3M | 89% | High risk91 | —-0.006 |
| 25KB0017CONSTRUCTION OF REVETMENT DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 81% | High risk91 | —-0.009 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 23KB0059CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY RD. K1594+056-K1594+340, K1594+390-K1594+440, K1594+440-K1594+593, K1594+593-K1594+729, K1594+858-K1594+944, K1595+073-K1595+129, K1595+129-K1595+340, K1595+340-K1595+415, K1595+4 | Region X | Bukidnon 2nd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.032 |
| 24KB0035CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱91.7M | 100% | High risk75 | —-0.023 |
| 23K00201CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION) BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱85.3M | 100% | High risk75 | —-0.024 |
| 23K00299CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (OLD DAMULOG - MIGCAWAYAN) BUKIDNON, PACKAGE 2 | Region X | Region X | Completed | ₱85.7M | 100% | High risk75 | —-0.026 |
| 23KB0055CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON PACKAGE 2, DOLOGON, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱52.5M | 100% | High risk75 | —-0.037 |
| 24KA0069CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, BRGY. MAGKALUNGAY, SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱144.8M | 100% | High risk63 | —-0.051 |
| 24KA0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱141.9M | 100% | High risk63 | —-0.052 |
| 25KA0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY HALAPITAN, SAN FERNANDO, BUKIDNON, BRGY. HALAPITAN, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱124.5M | 65% | High risk62 | —-0.017 |
| 25KA0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY MAGKALUNGAY, SAN FERNANDO, BUKIDNON, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.1M | 63% | High risk62 | —-0.014 |
| 25KA0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 1), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 41% | High risk61 | —-0.010 |
| 25KA0041CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PACKAGE 2), BARANGAY SAN JOSE, MALAYBALAY CITY, BUKIDNON BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱125.5M | 61% | High risk61 | —-0.013 |
| 25KA0039CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE 2), BARANGAY LAGUITAS, MALAYBALAY CITY, BUKIDNON, BRGY. LAGUITAS, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | On-Going | ₱123.3M | 45% | High risk61 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00077CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (KIBAWE SECTION), PACKAGE 2, BUKIDNON | Region X | Region X | On-Going | ₱115.2M | 40% | High risk95 | Flagged0.026 |
| 25KA0037COMPLETION OF MULTI-PURPOSE BUILDING, BUKIDNON STATE UNIVERSITY (BUKSU) ANNEX BUILDING, BRGY. CASISANG, MALAYBALAY CITY, BUKIDNON, BARANGAY CASISANG, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱39.1M | 30% | High risk95 | Flagged0.016 |
| 24KB0167CONCRETING OF BRGY. SAN MIGUEL FMR, BRGY. SAN MIGUEL, MARAMAG, BUIKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱29.6M | 98% | Medium risk47 | Flagged0.010 |
| 24KB0047CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF LANAPAN BRIDGE ALONG LANAPAN CREEK, QUEZON, BUKIDNON PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.2M | 100% | High risk75 | Flagged0.005 |
| 24KB0198CONSTRUCTION OF FARM-TO-MILL ROAD, BRGY. SAN JOSE (PHASE 3) TO OADI, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱17.4M | 100% | Medium risk46 | Flagged0.003 |
| 25K00237ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1573 + 500 - K1575 + 000 | Region X | Region X | On-Going | ₱55.7M | 75% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18KB0049ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1568+235-K1569+240, K1570+000-K1574+000, POB DON CARLOS-PINAMALOY SECTION AN POB KITAOTAO SECTION, DON CARLOS ND KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱93.1M | 100% | Medium risk57 | —-0.080 |
| 27 | 19KA0062ROAD WIDENING - ALONG JCT SH AGLAYAN-ZAMBOANGUITA RD(S00631MN) K1542 + 300 TO K1544 + 825CABANGLASAN, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.074 |
| 28 | 23KB0166CONSTRUCTION OF FARM-TO-MILL ROAD, BRGY. BUTONG TO BRGY. LUMINTAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱73.7M | 100% | Medium risk54 | —-0.021 |
| 29 | 21KB0194CONCRETING OF FARM-TO-MILL ROAD, CALAO-CALAO, DON CARLOS TO BERSHIBA, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱62.1M | 100% | Medium risk54 | —-0.027 |
| 30 | 18KC0022ROAD WIDENING - CDO CITY - DOMINOROG-CAMP KIBARITAN ROAD K1467+(-912)-K1467+(-892), K1467+(-830.8)-K1469+453, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱91.6M | 100% | Medium risk54 | —-0.083 |
| 31 | 22KB0098ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1583+800-K1584+000, K1596+865-K1597+000, K1608+176-K1608+271, PALACAPAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱82M | 100% | Medium risk52 | —-0.078 |
| 32 | 25K00236ROAD WIDENING-SECONDARY ROADS, SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY RD-COTABATO BDRY) - K1563 + (-706) - K1563 + (-623), K1575 + 000 - K1576 + 300 | Region X | Region X | On-Going | ₱74.3M | 77% | Medium risk52 | —-0.044 |
| 33 | 20K00200ROAD WIDENING, SAYRE HIGHWAY (JCT. BUKIDNON - DAVAO CITY RD - COTABATO BDRY) - K1579+400 - K1579+774, K1579+794 - K1580+000, K1582+800 - K1585+000, BUKIDNON | Region X | Region X | Completed | ₱84.2M | 100% | Medium risk52 | —-0.080 |
| 34 | 22KB0097CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY ROAD, K1581+000-K1582+600(LS), K1583+000-K1585+600(LS),K1587+000-K1587+900 (BS), K1589+000-K1590+100(LS), BRGY MIBANTANG, SANTA CRUZ AND PALACAPAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱73M | 100% | Medium risk52 | —-0.081 |
| 35 | 20K00190CONSTRUCTION OF MISSING LINKS/NEW ROADS, JCT. MARAMAG - MARADUGAO ROAD - JCT. LAMPANUSAN ROAD, PACKAGE 6, BUKIDNON | Region X | Region X | Completed | ₱71.7M | 100% | Medium risk52 | —-0.085 |
| 36 | 25K00316CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE - ARAKAN ROAD (OLD DAMULOG - MIGCAWAYAN), PACKAGE 4, BUKIDNON | Region X | Region X | On-Going | ₱67.4M | 53% | Medium risk52 | —-0.039 |
| 37 | 24KA0121REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD, K1543 + 120 - K1543 + 680, SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱67.6M | 75% | Medium risk52 | —-0.037 |
| 38 | 22KB0059ROAD WIDENING ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1568+000-K1569+240, POB. SUR, DON CARLOS - PINAMALOY, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱60.8M | 100% | Medium risk52 | —-0.087 |
| 39 | 24KB0062REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG KIBAWE-KADINGILAN-KALILANGAN RD, K1584+730-K1584+860, K1590+235-K1590+285, K1590+466-K1590+595, KADINGILAN, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱64.8M | 100% | Medium risk52 | —-0.051 |
| 40 | 19KC0047ROAD WIDENING ON SPECIFIC LOCATIONS ALONG KALILANGAN-LAMPANUSAN RD. (S00672MN) K1603+1425 TO K1606+634, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱59.9M | 100% | Medium risk52 | —-0.089 |
| 41 | 18K00079CONST./IMPRVT.OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO LAKE A | Region X | Region X | Completed | ₱56.3M | 100% | Medium risk52 | —-0.089 |
| 42 | 20KA0036ROAD WIDENING - ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) (S00639MN) RD - K1552 + 000 - K1554 + 000SAN FERNANDO, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱65.6M | 100% | Medium risk52 | —-0.085 |
| 43 | 18K00081ROAD WIDENING KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD.-K1549+700-K1550+961,K1550+986-K1552+000 | Region X | Region X | Completed | ₱61.6M | 100% | Medium risk52 | —-0.087 |
| 44 | 23KA0082OFF-CARRIAGEWAY IMPROVEMENT ALONG SAYRE HIGHWAY K1497+000 - K1499+106BRGY. PATPAT, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱56.4M | 100% | Medium risk51 | —-0.088 |
| 45 | 19KC0002ROAD WIDENING ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD. (S01321MN) K1468+180 TO K1469+607, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱61.9M | 100% | Medium risk51 | —-0.090 |
| 46 | 23KB0174CONCRETING OF FARM-TO-MARKET ROAD AT SAN ANDRES-CABADIANGAN ROAD (SAN ANDRES SECTION), BRGY. SAN ANDRES, KADINGILAN, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱49.3M | 100% | Medium risk51 | —-0.029 |
| 47 | 25KA0004REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD - K1539 + 261 - K1539 + 306, K1540 + 275 - K1540 + 335, K1540 + 362 - K1540 + 420SAN FERNANDO, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱52.5M | 87% | Medium risk50 | —-0.049 |
| 48 | 24K00329CONSTRUCTION OF JCT. SAYRE HIGHWAY TO JCT. KIBAWE-ARAKAN ROAD (OLD DAMULOG-MIGCAWAYAN), BUKIDNON (PACKAGE 3) | Region X | Region X | On-Going | ₱47.9M | 100% | Medium risk50 | —-0.053 |
| 49 | 19KB0028ROAD WIDENING ON SPECIFIC LOCATION ALONG SAYRE HIGHWAY (JCT BUKIDNON-DAVAO CITY ROAD-COTABATO BOUNDARY), K1581+000-K1582+800, POB LABUAGON, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱51.3M | 100% | Medium risk50 | —-0.088 |
| 50 | 24KB0135CONSTRUCTION OF JCT. BYPASS ROAD (JCT. MARAMAG-MARADUGAO ROAD TO JCT. LAMPANUSAN ROAD EXTENSION), BRGY. SAN ANDRES-BRGY. CABADIANGAN-SITIO TALAGUBA-SITIO BACBACON ROAD, KADINGILAN, BUKIDNON (CABADIANGAN-SITIO TALAGUBA SECTION, PACKAGE II), CABADIANGAN, KA | Region X | Bukidnon 2nd DEO | On-Going | ₱48.6M | 100% | Medium risk50 | —-0.052 |