Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱8.1B
Average progress
94.9%
Completion rate
81.0%
Average risk score
55.1
Medium risk on average, out of 100
Flagged as unusual
11
7.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 50 | ₱2.3B | 52.4 | 1 | 98.0% |
| Region III | 38 | ₱3.1B | 59.0 | 9 | 92.6% |
| National Capital Region | 25 | ₱1.2B | 50.4 | 0 | 89.0% |
| Region V | 23 | ₱1.1B | 58.6 | 1 | 97.1% |
| Region VII | 5 | ₱414.8M | 60.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱51.1M | 52.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 77 | ₱3.3B | 52.9 | 0 | 95.7% |
| Flood Control and Drainage | 52 | ₱4.3B | 58.1 | 8 | 93.5% |
| Buildings and Facilities | 8 | ₱70.6M | 38.0 | 0 | 100.0% |
| OTHER | 3 | ₱337.8M | 90.2 | 3 | 79.8% |
| GAA 2025 SSP | 1 | ₱9.7M | 91.3 | 0 | 100.0% |
| Bridges | 1 | ₱96.5M | 63.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 25OB0345CONSTRUCTION/COMPLETION OF MULTI PURPOSE BUILDING (COVERED COURT), MANDALUYONG HIGH SCHOOL, BARANGAY POBLACION, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.7M | 100% | High risk91 | —-0.004 |
| 24CJ0412BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT 0), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.049 |
| 24CJ0413BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 87% | High risk90 | Flagged0.049 |
| 24CC0615CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE E) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 44% | High risk84 | Flagged0.046 |
| 24CC0607CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, PUROK 3, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 60% | High risk84 | Flagged0.044 |
| 24CC0608CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 62% | High risk84 | Flagged0.043 |
| 24CC0614CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER BARANGAY DAUNGAN, PUROK 4, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 81% | High risk84 | Flagged0.036 |
| 24CC0586CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY IBA-IBAYO TO BARANGAY ABULALAS, HAGONOY, BULACAN PACKAGE B | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 93% | High risk83 | Flagged0.035 |
| 24CC0609CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 71% | High risk83 | Flagged0.039 |
| 25CL0152CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 2 SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 98% | High risk81 | —-0.021 |
| 25CL0151CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱98M | 99% | High risk81 | —-0.021 |
| 25DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF BANK IMPROVEMENT ALONG YLANG-YLANG RIVER (PHASE IV), BARANGAY SAN FRANCI | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.004 |
| 24CC0350ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - BIGAA-PLARIDEL VIA BULACAN & MALOLOS RD - BULACAN SECTION, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱94.1M | 73% | High risk77 | —-0.021 |
| 24C00460ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - EASTERN BULACAN ROAD, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱95.1M | 100% | High risk76 | —-0.036 |
| 24CC0348ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - OLD CAGAYAN VALLEY ROAD - BALIUAG SECTION, CITY OF BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱98M | 100% | High risk76 | —-0.055 |
| 24CL0220REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BUCAO RIVER UPSTREAM, BRGY. SAN JUAN, BOTOLAN, ZAMBALES PHASE 1 | Region III | Zambales 1st DEO | Completed | ₱90.8M | 100% | High risk74 | Flagged0.012 |
| 24F00390REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG YAWA RIVER, BRGY. MALOBAGO, DARAGA, ALBAY, DARAGA, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱179.9M | 93% | High risk74 | —-0.025 |
| 24CJ0404CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UNGOT CREEK (SEGMENT 41), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | High risk68 | —-0.013 |
| 17DP0051REPAIR/REHABILITATION/IMPROVEMENT OF CALAMBA-STA.CRUZ-FAMY JUNCTION ROAD (SO174LZ) KO073+262 TO KO074+780, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱28.5M | 100% | High risk67 | —-0.070 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Region V | Camarines Sur 5th DEO | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 24CJ0412BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT 0), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.049 |
| 24CJ0413BANK IMPROVEMENT ALONG UNGOT CREEK (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 87% | High risk90 | Flagged0.049 |
| 24CC0615CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE E) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 44% | High risk84 | Flagged0.046 |
| 24CC0607CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, PUROK 3, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 60% | High risk84 | Flagged0.044 |
| 24CC0608CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 62% | High risk84 | Flagged0.043 |
| 24CC0609CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER, BARANGAY MALIS, PUROK 3, GUIGUINTO, BULACAN (PACKAGE D) | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 71% | High risk83 | Flagged0.039 |
| 24CC0614CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG GUIGUINTO RIVER BARANGAY DAUNGAN, PUROK 4, GUIGUINTO, BULACAN (PACKAGE B) | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 81% | High risk84 | Flagged0.036 |
| 24CC0586CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY IBA-IBAYO TO BARANGAY ABULALAS, HAGONOY, BULACAN PACKAGE B | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 93% | High risk83 | Flagged0.035 |
| 24CL0220REPAIR/REHABILITATION OF SLOPE PROTECTION ALONG BUCAO RIVER UPSTREAM, BRGY. SAN JUAN, BOTOLAN, ZAMBALES PHASE 1 | Region III | Zambales 1st DEO | Completed | ₱90.8M | 100% | High risk74 | Flagged0.012 |
| 25DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF BANK IMPROVEMENT ALONG YLANG-YLANG RIVER (PHASE IV), BARANGAY SAN FRANCI | Region IV-A | Cavite 1st DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23HO0228REPAIR/REHABILITATION/RECONSTRUCTION OF MONTAÑEZA RIVER FLOOD CONTROL SYSTEM (UPSTREAM-SECTION 1), MALABUYOC, CEBU | Region VII | Cebu 7th DEO | Completed | ₱94.3M | 100% | High risk65 | —-0.066 |
| 27 | 23OE0190CONSTRUCTION OF RETENTION BASIN AT ESTERO DELA REINA, TONDO, MANILA CITY (PHASE X) | National Capital Region | North Manila DEO | Completed | ₱95.2M | 100% | High risk65 | —-0.075 |
| 28 | 23DQ0084CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN ISIDRO RIVER, WEST SIDE, BARANGAY IBA SILANG, CAVITE (PHASE I) | Region IV-A | Cavite 3rd DEO | Completed | ₱99M | 100% | High risk64 | —-0.074 |
| 29 | 23DH0018CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. WAWA, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 30 | 24HO0091ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO MAINIT - SITIO NONOK, BRGY. MONT | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 31 | 24HO0090ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO NONOK - SITIO MAINIT, BRGY. MONT | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 32 | 19FB0018001 - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - COMUN-INARADO-PEÑAFRANCIA ROAD K0521+318 - K0523+550 | Region V | Albay 2nd DEO | Completed | ₱50.1M | 100% | High risk63 | —-0.101 |
| 33 | 23OE0189RETROFITTING OF PERMANENT BRIDGES M. ROXAS JR. (DELPAN FLY-OVER) (B03353LZ) ALONG M. ROXAS ST., MANILA (PHASE 1) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.054 |
| 34 | 24CL0180CONSTRUCTION OF LAUIS RIVER-MASINLOC SIDE FLOOD MITIGATION STRUCTURE DOWNSTREAM, MASINLOC, ZAMBALES (PHASE 5) | Region III | Zambales 1st DEO | On-Going | ₱99M | 95% | High risk63 | —-0.034 |
| 35 | 20FB0034OO1-ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) K0515+659 - K0516+000, K0522+800 - K0523+727 | Region V | Albay 2nd DEO | Completed | ₱34M | 100% | High risk62 | —-0.098 |
| 36 | 23CL0072CONSTRUCTION OF SLOPE PROTECTION AT PINAGREALAN, UPSTREAM, CANDELARIA, ZAMBALES (PHASE 3) | Region III | Zambales 1st DEO | Completed | ₱99M | 100% | High risk62 | —-0.069 |
| 37 | 20FB0030OO1 - ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS - LEGAZPI CITY-PUNTA DE JESUS RD - K0536+000 - K0537+633 | Region V | Albay 2nd DEO | Completed | ₱28.5M | 100% | High risk62 | —-0.098 |
| 38 | 23CL0083CONSTRUCTION OF SLOPE PROTECTION AT LAWIS RIVER UPSTREAM, CANDELARIA, ZAMBALES (PHASE 2) | Region III | Zambales 1st DEO | Completed | ₱99M | 100% | High risk62 | —-0.070 |
| 39 | 23CL0084CONSTRUCTION OF SLOPE PROTECTION AT LAWIS RIVER, UPSTREAM, CANDELARIA, ZAMBALES (PHASE 4) | Region III | Zambales 1st DEO | Completed | ₱99M | 100% | High risk62 | —-0.070 |
| 40 | 23CL0073CONSTRUCTION OF SLOPE PROTECTION AT PINAGREALAN, UPSTREAM, CANDELARIA, ZAMBALES (PHASE 4) | Region III | Zambales 1st DEO | Completed | ₱99M | 100% | High risk62 | —-0.069 |
| 41 | 24CL0004FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE II), TOTUN LANUM, BARANGAY MAMBOG, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.074 |
| 42 | 24OF0114REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - CONGRESSIONAL AVE (S05262LZ) - K0012 + 365 - K0013 + 078, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱98M | 100% | High risk61 | —-0.086 |
| 43 | 24OF0113REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - CONGRESSIONAL AVE - (S05262LZ) - K0010 + (-199) - K0012 + 233, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱98M | 100% | High risk61 | —-0.086 |
| 44 | 24OG0063REHABILITATION OF ROADS, BARANGAY LOYOLA HEIGHTS, PHASE II, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱97.9M | 100% | High risk60 | —-0.087 |
| 45 | 23OF0065REHABILITATION OF ROAD ALONG MINDANAO AVENUE (S05475LZ) CHAINAGE 0 + 496, (S05476LZ) CHAINAGE 0 + 496, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.086 |
| 46 | 23OF0066REHABILITATION OF ROAD ALONG MINDANAO AVENUE (S05472LZ) K0016 + 000 - K0014 + 708, (S05477LZ) K0014 + (-689) - K0015 + 600, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 47 | 17FB0091ASPHALT OVERLAY WITH CORRECTIONS AT COMUN-INARADO-PEÑAFRANCIA ROAD, K0520+641-K0522+000 | Region V | Albay 2nd DEO | Completed | ₱17.4M | 100% | Medium risk60 | —-0.010 |
| 48 | 20FB0031OO1-ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS - BANQUEROHAN-BARIIS-SOGOY-SORSOGON BDRY. ROAD (S05859LZ) - K0549+325 - K0550+200 | Region V | Albay 2nd DEO | On-Going | ₱18.9M | 77% | Medium risk59 | —-0.032 |
| 49 | 17DP0075ASPHALT OVERLAY OF SAN PABLO-RIZAL-NAGCARLAN-LILIW ROAD (SO5817LZ) K0101+000 - K0102+410 | Region IV-A | Laguna 3rd DEO | Completed | ₱9.5M | 100% | Medium risk59 | —-0.019 |
| 50 | 17FB0088ASPHALT OVERLAY W/ CORRECTION AT BANQUEROHAN-BARIIS-SOGOY-SORSOGON BDRY. ROAD, K0546+000 - K0549+325 | Region V | Albay 2nd DEO | Completed | ₱43M | 100% | Medium risk57 | —-0.004 |