Opening the dossier…
Opening the dossier…
Contractor dossier
93 projects on file, including joint ventures this contractor is part of.
Total projects
93
Total budget
₱4.7B
Average progress
95.2%
Completion rate
84.9%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
6
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 89 | ₱4.4B | 53.1 | 6 | 95.0% |
| Region VIII | 4 | ₱345.2M | 53.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱2.4B | 49.3 | 0 | 100.0% |
| Bridges | 21 | ₱786.7M | 47.5 | 0 | 95.9% |
| Flood Control and Drainage | 10 | ₱654.4M | 52.3 | 0 | 97.3% |
| OTHER | 6 | ₱278.6M | 66.3 | 1 | 97.3% |
| GAA 2025 OO-1 | 3 | ₱178.6M | 92.2 | 3 | 56.5% |
| Buildings and Facilities | 3 | ₱124.8M | 48.9 | 0 | 66.7% |
| GAA 2025 OO-2 | 2 | ₱240.7M | 93.4 | 1 | 76.0% |
| GAA 2025 SSP | 1 | ₱81.9M | 95.2 | 1 | 65.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HA0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, PHASE 3 JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BARANGAY COGON, BARANGAY BOOY, AND BARANGAY TALOTO, | Region VII | Bohol 1st DEO | On-Going | ₱96.1M | 94% | High risk93 | —-0.008 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HC0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM- KATUPARAN)- ACCESS ROAD LEADING TO TALIBON PORT VIA SAN JOSE-BRGY. SAN FRANCISCO-REVILLES ST., BRG | Region VII | Bohol 2nd DEO | On-Going | ₱51.5M | 92% | High risk73 | —-0.001 |
| 25HA0025CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HABITAT ROAD LEADING TO TAGBILARAN EAST ROAD (BELOW THE REGIONAL HUB), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96.3M | 74% | High risk64 | —-0.024 |
| 21HB0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PRORAM -TRIP), CONCRETING OF CALUNASAN SUR TO UGPONG ROAD LEADING TO LOBOC RIVER CRUISE, LOBOC, BOHOL ST | Region VII | Bohol 3rd DEO | Completed | ₱47.1M | 100% | High risk64 | —-0.030 |
| 18HB0141CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. (TER) LA UNION-MABINI-CABULAO-UBAY ROAD (LEADING TO BEACH AREAS AT ANDA & UBAY INCLUDING BRIDGE | Region VII | Bohol 3rd DEO | Completed | ₱29.8M | 100% | High risk62 | —-0.026 |
| 21HB0127LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROAD, CALUNASAN SUR (LOBOC) LEADING TO TAMBANGAN (LOAY), LOBOC - LOAY, BOHOL STA. 0+0 | Region VII | Bohol 3rd DEO | Completed | ₱44.2M | 100% | High risk62 | —-0.030 |
| 24HC0037ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAGBAYAN, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 99% | High risk62 | —-0.027 |
| 21H00012LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1 | Region VII | Region VII | Completed | ₱231.6M | 100% | High risk62 | —-0.058 |
| 24HC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 88% | High risk60 | —-0.004 |
| 23HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MABINI, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱9.7M | 100% | High risk60 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, | Region VII | Bohol 2nd DEO | On-Going | ₱81.9M | 65% | High risk95 | Flagged0.025 |
| 25HB0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - THE PRES. CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0158+573 - K0159+000, K0168+702 - K0169+048, K0245+900 - K0246+396 | Region VII | Bohol 3rd DEO | On-Going | ₱70.9M | 46% | High risk92 | Flagged0.018 |
| 25HC0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD- K0106+177-K0107+766, K0116+370-K0116+1021, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱76M | 39% | High risk93 | Flagged0.018 |
| 24HC0041ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, HUNAN FLOOD CONTROL, BUENAVIS | Region VII | Bohol 2nd DEO | On-Going | ₱96.4M | 92% | High risk77 | Flagged0.017 |
| 25HA0020CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG | Region VII | Bohol 1st DEO | On-Going | ₱144.6M | 58% | High risk93 | Flagged0.009 |
| 25HC0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING- SECONDARY ROADS- THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD - K0109+815-K0110+813, TALIBON, BOHOL | Region VII | Bohol 2nd DEO | On-Going | ₱31.6M | 85% | High risk92 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23HC0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROADS LEADING TO TALIBON-BIE | Region VII | Bohol 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.081 |
| 27 | 17HA0064CONCRETING OF RD. FROM JUNCTION TAGBILARAN CITY-CORELLA-SIKATUNA-LOBOC RD. TO PROPOSED GOVERNMENT MULTI-PURPOSE TRAINING CENTER, TEACHER'S VILLAGE, STA. 00+000 - STA. 00+400, STA. 00+400 - STA. 01+080, STA. 01+080 - STA. 2+080, SAN ISIDRO, TAGBILARAN CITY | Region VII | Bohol 1st DEO | Completed | ₱32.9M | 100% | Medium risk56 | —-0.062 |
| 28 | 17HA0017LOCALLY FUNDED PROJECTS-CONSTRUCTION OF ACCESS ROAD JCT. TAGBILARAN CITY-CORELLA-SIKATUNA ROAD LEADI | Region VII | Bohol 1st DEO | Completed | ₱18.2M | 100% | Medium risk56 | —-0.062 |
| 29 | 21HC0140CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF THE TALIBON-BIEN UNIDO BRIDGE, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱89.8M | 100% | Medium risk55 | —-0.033 |
| 30 | 23HA0127CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002+170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BRGYS. COGON, BOOY AND TALOTO, TAGBILARAN CITY, BOHOL (PHASE 1 | Region VII | Bohol 1st DEO | Completed | ₱72.2M | 100% | Medium risk54 | —-0.073 |
| 31 | 19HA0008CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - MONTAÑA-SAN-JUAN-BUENAVENTURA ROAD LEADING TO EDITH GRAND GARDEN RESORT AND ADVENTURE PARK, BACLAYON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱86.6M | 100% | Medium risk54 | —-0.085 |
| 32 | 24HC0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BRIDGE AT TALIBON CAUSEWAY | Region VII | Bohol 2nd DEO | On-Going | ₱77.2M | 83% | Medium risk53 | —-0.009 |
| 33 | 23HA0171CONSTRUCTION OF BOHOL CONVENTION CENTER, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱49.3M | 0% | Medium risk53 | —-0.019 |
| 34 | 19HC0024001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT- OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROAD AT TAGBILRAN NORTH RD. (TAGBILRAN-JETAFE SECT.)- K0058+949-K0059+000, K0060+934-K0062+000, K0064+823-K0066+834, K0066+911-K0067+536,CLARIN | Region VII | Bohol 2nd DEO | Completed | ₱55.3M | 100% | Medium risk52 | —-0.092 |
| 35 | 24HA0051REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILARAN CITY-CORELLA-SIKATUNA-LOBOC RD - K0008 + 000 - K0009 + 000, K0010 + 497 - K0011 + 017 | Region VII | Bohol 1st DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.092 |
| 36 | 18H00003CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES LAPACAN SUR (BUGTONG LUBI) INABANGA-MAGTANGTANG (DANAO) ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, DANAO, BOHOL | Region VII | Region VII | Completed | ₱70.5M | 100% | Medium risk51 | —-0.089 |
| 37 | 21HB0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) -JCT. (TER) GUIOANG - COGTONG ROAD IN | Region VII | Bohol 3rd DEO | Completed | ₱67.5M | 100% | Medium risk51 | —-0.088 |
| 38 | 23HC0076ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF SEAWALL, BIEN UNIDO, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱78.4M | 100% | Medium risk51 | —-0.069 |
| 39 | 18HA0040REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA)-K0251+000-K0252+876, BACLAYON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱48.8M | 100% | Medium risk51 | —-0.093 |
| 40 | 20H00055CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. (TER) SITIO BOHOM SJB, BACLAYON SUM-ONG ST., BASAK DAKO LEADING TO ALBURQUERQUE IN SUPPORT OF THE AGRI-BUSINESS INDUSTRY, BACL | Region VII | Region VII | Completed | ₱48.3M | 100% | Medium risk51 | —-0.094 |
| 41 | 23HA0075CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE SYSTEM/ OUTFALL FOR NEW GALLARES HOSPITAL AND OTHER FACILITIES, CORTES, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱48.7M | 100% | Medium risk50 | —-0.075 |
| 42 | 23HB0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONCRETING OF ROAD AT BARANGAY TANGCASAN SUR TO BARANGAY TAMBANGAN, LO | Region VII | Bohol 3rd DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.092 |
| 43 | 22HC0061SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND /OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF THE TALIBON-BIEN UNIDO BRIDGE, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱48.6M | 100% | Medium risk50 | —-0.046 |
| 44 | 22HB0100ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE (PACKAGE 4) BARANGAY JIMILI-AN, | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.062 |
| 45 | 23HB0117ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF DIVERSION ROAD, JAGNA, BOHOL STA.0+000.00-STA.0+900.00 | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.090 |
| 46 | 24HB0029ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS LOAY INTERIOR RD - K0163 + 000 - K0164 + 000 | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.093 |
| 47 | 19IG0036NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD - K1049+962-K1051+127 | Region VIII | Leyte 5th DEO | Completed | ₱44.6M | 100% | Medium risk48 | —-0.095 |
| 48 | 24HA0052CONSTRUCTION OF NEW PERMANENT BRIDGES - CONSTRUCTION OF PINAYAGAN NORTE BRIDGE ALONG TAGBILARAN NORTH RD | Region VII | Bohol 1st DEO | Completed | ₱35.3M | 100% | Medium risk48 | —-0.055 |
| 49 | 20IG0020NETWORK DEVELOPMENT - ROAD WIDENING-PRIMARY ROADS-ORMOC-BAYBAY-SOUTHERN LEYTE BDRY.ROAD - K1051+151-K1051+393,K1053+372-K1053+849,K1053+887-K1054+337,K1056+286-K1056+333 | Region VIII | Leyte 5th DEO | Completed | ₱41.2M | 100% | Medium risk48 | —-0.095 |
| 50 | 25HA0049WIDENING OF PERMANENT BRIDGES - MACA-AS BR. (B00018BH) ALONG THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD | Region VII | Bohol 1st DEO | On-Going | ₱39.2M | 43% | Medium risk48 | —-0.012 |