Contractor dossier
121 projects on file, including joint ventures this contractor is part of.
Total projects
121
Total budget
₱7.5B
Average progress
97.0%
Completion rate
86.8%
Average risk score
49.6
Medium risk on average, out of 100
Flagged as unusual
7
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 73 | ₱3.9B | 49.2 | 2 | 98.5% |
| Region XIII | 31 | ₱1.7B | 45.0 | 1 | 100.0% |
| Region IV-B | 11 | ₱1.2B | 57.4 | 4 | 79.8% |
| Region VIII | 3 | ₱340.8M | 61.0 | 0 | 91.5% |
| Negros Island Region | 1 | ₱96.5M | 79.2 | 0 | 100.0% |
| Region VI | 1 | ₱136.6M | 63.6 | 0 | 100.0% |
| Region XI | 1 | ₱78.7M | 56.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 47 | ₱2.5B | 46.5 | 0 | 99.8% |
| Bridges | 36 | ₱2.1B | 48.7 | 3 | 97.6% |
| Flood Control and Drainage | 30 | ₱2.1B | 51.4 | 3 | 97.5% |
| OTHER | 3 | ₱344M | 78.4 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱39.4M | 42.2 | 0 | 38.2% |
| GAA 2025 OO-1 | 1 | ₱67.2M | 93.7 | 1 | 39.0% |
| Water Provision and Storage | 1 | ₱27.5M | 60.5 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱193M | 53.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EG0017REPLACEMENT OF PERMANENT WEAK BRIDGES - MAYLIGAN BR. (B00020PW) ALONG PUERTO PRINCESA SOUTH ROAD, K0062+147, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱67.2M | 39% | High risk94 | Flagged0.027 |
| 17N00015ROAD UPGRADING (UNPAVED TO PAVED), DINAGAT-LORETO ROAD, K0009+466-K0010+000, K0010+000-K0010+757, K0048+000-K0048+700, K0053+020-K0053+320, K0053+348-K0054+000-K0055+000, K0058+566-K0058+810, DINAGAT ISLANDS | Region XIII | Region XIII | Completed | ₱161M | 100% | High risk80 | —-0.013 |
| 20GL0058REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 3 (B00354NR) ALONG BACOLOD SOUTH RD, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 19KF0050CONSTRUCTION OF NEW PERMANENT BRIDGES AT LARAPAN BRIDGE ALONG LINAMON-ZAMBOANGA ROAD (PHASE II) | Region X | Lanao del Norte 1st DEO | Completed | ₱86.5M | 100% | High risk76 | —-0.029 |
| 24I00013CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF EMBARKADERO FLOOD CONTROL STRUCTURE ALONG BAHAY RIVER, (DOWNSTREAM), PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱159.6M | 83% | High risk68 | —-0.012 |
| 23IM0086CONSTRUCTION OF TACLOBAN CITY MASTER DRAINAGE AND FLOOD CONTROL SYSTEM, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱150.8M | 91% | High risk68 | —-0.007 |
| 24E00177FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENAMNCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER (RS), STA. 000+000-STA. 000+623.17, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱241.2M | 96% | High risk67 | Flagged0.016 |
| 24E00176FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER, BRGY. MAOYON (LS), PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱241.2M | 94% | High risk67 | Flagged0.018 |
| 24E00132SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (DOWNSTREAM RIGHTSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.4M | 95% | High risk66 | Flagged0.007 |
| 18G00041WIDENING OF BRIDGE - BAGO BR. (B00195NR) ALONG BACOLOD SOUTH BY-PASS RD INCL. ROW | Region VI | Region VI | Completed | ₱136.6M | 100% | High risk64 | —-0.027 |
| 24K00173REPLACEMENT OF PERMANENT WEAK BRIDGE-MAIGO BR. (B00949MN) ALONG LINAMON-ZAMBOANGA RD | Region X | Region X | On-Going | ₱146.4M | 100% | High risk63 | —-0.008 |
| 19K00217CONSTRUCTION OF NEW PERMANENT BRIDGES, PULANGI PARALLEL BR. ALONG BUKIDNON-DAVAO CITY RD | Region X | Region X | Completed | ₱137.4M | 100% | High risk63 | —-0.021 |
| 20K00060CONSTRUCTION OF MISSING LINKS/NEW ROADS, TUBOD - GANASSI ROAD, LANAO DEL NORTE | Region X | Region X | Completed | ₱139.2M | 100% | High risk62 | —-0.032 |
| 17NE0052IMPROVEMENT/REHABILITATION OF WATER SUPPLY SYSTEM, LIBJO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱27.5M | 100% | High risk61 | —-0.023 |
| 23KD0038CONSTRUCTION OF BRIDGE: PUERTO BRIDGE ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱94.5M | 100% | High risk60 | —-0.043 |
| 18KF0082CONSTRUCTION OF MANDULOG BRIDGE-4 INCLUDING APPROACHES AND RROW (PHASE II) AT BAYUG ISLAND, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱93M | 100% | High risk60 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EG0017REPLACEMENT OF PERMANENT WEAK BRIDGES - MAYLIGAN BR. (B00020PW) ALONG PUERTO PRINCESA SOUTH ROAD, K0062+147, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱67.2M | 39% | High risk94 | Flagged0.027 |
| 24E00176FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER, BRGY. MAOYON (LS), PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱241.2M | 94% | High risk67 | Flagged0.018 |
| 24E00177FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENAMNCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER (RS), STA. 000+000-STA. 000+623.17, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱241.2M | 96% | High risk67 | Flagged0.016 |
| 17N00016DAPA PORT-CONSUELO-CORAZON-STA. CRUZ - STA. FE - CABITOONAN-CATANGNAN-GENERAL LUNA ROAD (CABITOONAN-CATANGNAN BRIDGE PHASE II), SURIGAO DEL NORTE 1ST LD., GENERAL LUNA, SURIGAO DEL NORTE, SIARGAO ISLANDS | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk52 | Flagged0.015 |
| 18KG0047CONSTRUCTION OF CADAYUNAN BRIDGE, MUNAI, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱30.6M | 100% | Medium risk40 | Flagged0.012 |
| 24E00132SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ABORLAN RIVER WATERWAY, PUERTO PRINCESA SOUTH ROAD (DOWNSTREAM RIGHTSIDE), ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱154.4M | 95% | High risk66 | Flagged0.007 |
| 18KG0045CONSTRUCTION OF TANGKAL BRIDGE, PANTAO RAGAT, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱16.2M | 100% | Medium risk39 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18K00113CONST. OF BYPASS/DIVERSION ROADS, ILIGAN CITY CIRCUM. ROAD (C3),PHASE II INCL.ROW, DRAINAGE & SLOPE | Region X | Region X | Completed | ₱128.3M | 100% | Medium risk56 | —-0.061 |
| 27 | 17KF0061COMPLETION OF REVETMENT ALONG MAIGO BRIDGE, K0+000 - K0+380, MAIGO, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱43.3M | 100% | Medium risk55 | —-0.058 |
| 28 | 16NG0080CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG COASTAL OF POBLACION SOCORRO, SOCORRO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 1st DEO | Completed | ₱14M | 100% | Medium risk55 | —-0.041 |
| 29 | 23E00092CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM INFRA. PROGRAM - TRIP)- BACUNGAN-SIMPUCAN-BAGUMBAYAN-NAPSAN ROAD, STA. 0+000-STA. 0+628; STA. 43+284-STA. 43+532; STA. 47+495-STA. 47+910; STA. 47+960-STA. 49+070, PTO. PRINC | Region IV-B | Region IV-B | On-Going | ₱118.2M | 94% | Medium risk55 | —-0.019 |
| 30 | 24KB0048CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MANUTO BRIDGE (B01380MN) ALONG BUKIDNON-DAVAO CITY ROAD, BUKIDNON, PACKAGE 2, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱91.1M | 96% | Medium risk54 | —-0.030 |
| 31 | 17KF0039CONSTRUCTION OF SLOPE PROTECTION ALONG LINAMON BRIDGE(B00940MN),PHASE II, LINAMON, LANAO DEL NORTE 1ST LONE DISTRICT | Region X | Lanao del Norte 1st DEO | Completed | ₱22.8M | 100% | Medium risk54 | —-0.057 |
| 32 | 17K00412CONST./ REHAB. OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS, IPONAN | Region X | Region X | Completed | ₱20.2M | 100% | Medium risk54 | —-0.056 |
| 33 | 21K00085CONST. OF MISSING LINKS/NEW ROADS, ILIGAN CITY-CDOC ALTERNATE ROUTE(DIGKILAAN-BULUA SECTION),PACKAGE | Region X | Region X | Completed | ₱91.4M | 100% | Medium risk54 | —-0.083 |
| 34 | 20KF0051WIDENING OF PERMANENT BRIDGES AT MAIGO BRIDGE (B00949MN) ALONG LINAMON-ZAMBOANGA ROAD, MAIGO, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱82M | 100% | Medium risk53 | —-0.048 |
| 35 | 23E00088ROAD WIDENING - SECONDARY ROADS - PUERTO PRINCESA NORTH ROAD, KO050+098-KO052+551, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱107.5M | 95% | Medium risk53 | —-0.023 |
| 36 | 18N00081CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, DAPA PORT - CONSUELO - STA. CRUZ - STA. FE - LBERTAD - CABITOONAN - CATANGNA - GENERAL LUNA ROAD (INCL. BRIDGE COMPLETION OF CATANGNAN - CABITOONAN BRIDGE AND LIBERTAD BRIDGE 2), SURIGAO DEL N | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.028 |
| 37 | 18KF0072WIDENING OF PERMANENT BRIDGES AT LINAMON BRIDGE(B00940MN) ALONG LINAMON-ZAMBOANGA ROAD | Region X | Lanao del Norte 1st DEO | Completed | ₱71.7M | 100% | Medium risk53 | —-0.045 |
| 38 | 19KF0082WIDENING OF PERMANENT BRIDGES AT BULOD BRIDGE (B00960MN) ALONG LINAMON-ZAMBOANAGA ROAD, TUBOD, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱60.8M | 100% | Medium risk53 | —-0.056 |
| 39 | 19KF0132CONSTRUCTION OF BY-PASS AND DIVERSION ROAD ALONG ILIGAN CITY CIRCUMFERENTIAL ROAD (C3), PHASE II, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱86.5M | 100% | Medium risk53 | —-0.030 |
| 40 | 18KF0075CONSTRUCTION OF NEW PERMANENT BRIDGE AT LARAPAN PARALLEL BRIDGE ALONG LINAMON-ZAMBOANGA ROAD | Region X | Lanao del Norte 1st DEO | Completed | ₱69.8M | 100% | Medium risk53 | —-0.046 |
| 41 | 20KF0048WIDENING OF PERMANENT BRIDGES AT KULASIHAN BRIDGE (B00951MN) ALONG LINAMON-ZAMBOANGA ROAD, KOLAMBUGAN, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.056 |
| 42 | 17N00016DAPA PORT-CONSUELO-CORAZON-STA. CRUZ - STA. FE - CABITOONAN-CATANGNAN-GENERAL LUNA ROAD (CABITOONAN-CATANGNAN BRIDGE PHASE II), SURIGAO DEL NORTE 1ST LD., GENERAL LUNA, SURIGAO DEL NORTE, SIARGAO ISLANDS | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk52 | Flagged0.015 |
| 43 | 17N00057ROAD UPGRADING (UNPAVED TO PAVED), DINAGAT - LORETO RD, K0065+200 - K0066+880, K0068+380 - K0068+716, DINAGAT ISLANDS | Region XIII | Region XIII | Completed | ₱119.1M | 100% | Medium risk52 | —-0.047 |
| 44 | 18KF0078PAVING OF UNPAVED ROADS ALONG STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD INCLUDING ROW K1564+400-K1564+600, K1565+856-K1566+521, K1567+000-K1567+355, K1567+916-K1568+700 | Region X | Lanao del Norte 1st DEO | Completed | ₱84.7M | 100% | Medium risk51 | —-0.077 |
| 45 | 21K00132CONST. OF MISSING LINKS/NEW ROADS ILIGAN CITY/CAGAYAN DE ORO CITY ALTERNATE ROUTE, PACKAGE 2, MIS OR | Region X | Region X | Completed | ₱67.6M | 100% | Medium risk51 | —-0.088 |
| 46 | 23KG0040REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG LINAMON-ZAMBOANGA ROAD, K1569+800-K1570+039, K1577+1097-K1578+320, K1582+386-K1582+441, K1586+529-K1586+916, K1587+212-K1587+645, K1588+000-K1588+137, K1591+543-K1591+606, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱70.6M | 100% | Medium risk51 | —-0.085 |
| 47 | 21KI0009ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS OROQUIETA CITY-CALAMBA MT. RD - K1760+200 - K1760+465, LOPEZ JAENA, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱78.3M | 100% | Medium risk51 | —-0.081 |
| 48 | 17NF0005OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROAD, SURIGAO CITY-SAN JUAN COASTAL ROAD/BRGY. SABANG III - BRGY. SAN JUAN, SURIGAO CITY, K1116+567 - K1117+021; K1117+171 - K1118+191; K1118+271 - K1118+613 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱37.6M | 100% | Medium risk51 | —-0.056 |
| 49 | 22KF0024CONSTRUCTION OF SLOPE PROTECTION ALONG MAIGO BRIDGE, (DOWNSTREAM) (LS), STA. 0+000.00-STA. 0+260.00, MAIGO, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱67.6M | 100% | Medium risk51 | —-0.076 |
| 50 | 23K00171CONSTRUCTION OF PULANGI PARALLEL BR. ALONG BUKIDNON-DAVAO CITY RD | Region X | Region X | Completed | ₱47.3M | 100% | Medium risk51 | —-0.054 |