Contractor dossier
135 projects on file, including joint ventures this contractor is part of.
Total projects
135
Total budget
₱6.7B
Average progress
92.9%
Completion rate
83.0%
Average risk score
46.7
Medium risk on average, out of 100
Flagged as unusual
4
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 30 | ₱906.7M | 46.4 | 0 | 100.0% |
| Region IV-B | 24 | ₱1.5B | 46.1 | 1 | 98.0% |
| Region III | 24 | ₱933M | 34.2 | 0 | 98.0% |
| National Capital Region | 20 | ₱1B | 50.3 | 0 | 85.2% |
| Region VI | 10 | ₱712.8M | 54.8 | 0 | 93.5% |
| Region XI | 9 | ₱498M | 49.5 | 1 | 96.9% |
| Region VIII | 7 | ₱466.3M | 64.3 | 1 | 43.7% |
| Region XII | 5 | ₱378.7M | 46.5 | 1 | 100.0% |
| Negros Island Region | 3 | ₱145.9M | 55.5 | 0 | 74.2% |
| Region I | 2 | ₱84.1M | 44.1 | 0 | 100.0% |
| Region II | 1 | ₱27.2M | 43.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 51 | ₱3.3B | 48.4 | 0 | 92.2% |
| Buildings and Facilities | 41 | ₱1.2B | 41.6 | 1 | 90.8% |
| Roads | 39 | ₱1.9B | 45.7 | 1 | 96.3% |
| GAA 2025 SSP | 2 | ₱125.5M | 93.1 | 2 | 95.7% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 93.7 | 0 | 74.0% |
| OTHER | 1 | ₱45.1M | 64.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
| 25IC0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO MALIPURON, BARANGAY GUINCIAMAN, SAN MIGUEL, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.5M | 74% | High risk94 | —-0.006 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 24C00083SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk79 | —-0.049 |
| 24CC0461CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIÑANG ELEMENTARY SCHOOL), BIÑANG 1ST, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱45.6M | 53% | High risk75 | —-0.018 |
| 25HJ0140ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING ALONG PRIMARY ROAD-DUMAGUETE NORTH ROAD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) K0122+869 - K0124+130, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱57M | 31% | High risk70 | —-0.016 |
| 25GD0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER, BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱142.9M | 41% | High risk68 | —-0.008 |
| 24GD0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL AT ZIBALA RIVER, BARANGAY POBLACION, PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱94.3M | 96% | High risk65 | —-0.023 |
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 18CC0259CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANDI-ANGAT ROAD CONNECTING GEN. ALEJO SANTOS HIGHWAY & BALAGTAS-PANDI ROAD & STA. CLARA-PANDI ROAD IN SUPPORT OF FURNITURE AND GARMENTS PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱45.1M | 100% | High risk64 | —-0.036 |
| 24E00174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 1), BRGY. BONO-BONO SECTION, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24E00205SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 2), BRGY. MARANGAS-BRGY. BONO-BONO SECTION, STA. 000+000-STA. 001+029.70, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 24OI0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PALIWAS CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.076 |
| 21DM0056CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PIRIS RIVER, BRGY. POBLACION, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.070 |
| 18DQ0139ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY. | Region IV-A | Region IV-A | Completed | ₱92.6M | 100% | High risk63 | —-0.077 |
| 23IM0092COMPLETION OF THE PSYCHIATRIC AND ADMINISTRATIVE BUILDING, EASTERN VISAYAS MEDICAL CENTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱69.2M | 68% | High risk62 | —-0.024 |
| 24GD0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER AT BARANGAY COGON, PANAY, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱92.5M | 100% | High risk62 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IM0134CONSTRUCTION OF OFFICE BUILDING, DEPARTMENT OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (DICT) - REGIONAL OFFICE 8, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 0% | High risk65 | Flagged0.054 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 25MB0036CONSTRUCTION OF CONCRETE ROAD WITH DRAINAGE INCLUDING FACILITIES, DACERA AVENUE CONNECTING TO SILWAY 8-UPPER LABAY BYPASS ROAD, BARANGAY MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱86.8M | 100% | High risk92 | Flagged0.021 |
| 25EH0070CONSTRUCTION OF SABLAYAN FLOOD CONTROL STRUCTURE, ROMBLON, ROMBLON | Region IV-B | Romblon DEO | On-Going | ₱38.6M | 91% | High risk94 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22DM0024NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS -CATANAUAN - BUENAVISTA RD - K0261+893 - K0265+893CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱61.1M | 100% | Medium risk54 | —-0.099 |
| 27 | 22DM0015NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS- P BURGOS - POTOTANIN JCT - K0195+123 - K0198+174UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱58.9M | 100% | Medium risk54 | —-0.101 |
| 28 | 25IC0035CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱57.9M | 62% | Medium risk53 | —-0.024 |
| 29 | 23GD0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATING FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER CONTROL (DOWNSTREAM), PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱85.4M | 97% | Medium risk53 | —-0.014 |
| 30 | 22GD0064BANK IMPROVEMENT OF PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER (DOWNSTREAM OF PANITAN BRIDGE I) PHASE II, PANITAN, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱77.7M | 100% | Medium risk53 | —-0.015 |
| 31 | 21GD0069CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER CONTROL (DOWNSTREAM OF PANITAN BRIDGE I), PANITAN, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.066 |
| 32 | 22GD0028CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITAGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, TALASA RIVER CONTROL, BRGY. TALASA, PANAY, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.068 |
| 33 | 22GD0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PANAY/MAMBUSAO RIVER BASIN, PANITAN RIVER CONTROL (DOWNSTREAM), PANITAN, CAPIZ | Region VI | Capiz 1st DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.068 |
| 34 | 24OC0110CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN ISIDRO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱69.3M | 0% | Medium risk53 | —-0.016 |
| 35 | 19OI0009CONSTRUCTION OF SLOPE PROTECTION ALONG TALON CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.081 |
| 36 | 24OC0112CONSTRUCTION OF FLOOD MITIGATION FACILITY AT MARULAS CREEK, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱70.2M | 42% | Medium risk53 | —-0.033 |
| 37 | 23OC0096CONSTRUCTION OF REVETMENT ALONG FISHERMAN'S WHARF (PHAE I), BRGY. LA HUERTA, PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.080 |
| 38 | 19OF0199CONSTRUCTION/ REHABILITATION OF MPB, SB PARK, BRGY. TANDANG SORA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱38.4M | 100% | Medium risk53 | —-0.097 |
| 39 | 24OB0176CONSTRUCTION OF SLOPE PROTECTION ALONG PANDAY RIVER, (PHASE 6), PATEROS | National Capital Region | Metro Manila 1st DEO | Completed | ₱70.9M | 100% | Medium risk53 | —-0.086 |
| 40 | 19LB0186CONSTRUCTION OF 4-STOREY LTO REGIONAL OFFICE XI BUILDING, QUEZON BOULEVARD, MATINA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.065 |
| 41 | 19OI0024CONSTRUCTION OF FOUR(4) STOREY MULTI-PURPOSE BUILDING BRGY. SUCAT, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱34.3M | 100% | Medium risk52 | —-0.094 |
| 42 | 24OI0059CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALMIRANTE CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | On-Going | ₱55.4M | 55% | Medium risk52 | —-0.032 |
| 43 | 20LB0041CONSTRUCTION OF REVETMENT ALONG DAVAO RIVER, DAVAO RIVER BRIDGE UPSTREAM SECTION, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱86.1M | 100% | Medium risk52 | —-0.056 |
| 44 | 19OI0112CONSTRUCTION OF ROAD INCLUDING DRAINAGE, BRGY. SUCAT, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱48.9M | 100% | Medium risk51 | —-0.087 |
| 45 | 19OI0141CONST. OF FOUR (4) STOREY, TWENTY (20) CLASSROOM SCHOOL BUILDING AT ALABANG ELEM. SCHOOL (MAIN), BRGY. ALABANG, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱48.8M | 100% | Medium risk51 | —-0.039 |
| 46 | 22DM0019NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0351 + (-659) - K0352 + 923 SAN ANDRES, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |
| 47 | 21DM0039NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - UNISAN DIVERSION ROAD, QUEZON, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.101 |
| 48 | 25OB0121CONSTRUCTION OF DRAINAGE SYSTEM ALONG F. MARIANO ST. AND VICINITY, BARANGAY USUSAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱48.3M | 6% | Medium risk50 | —-0.027 |
| 49 | 21OI0058CONST. (COMPLETION) OF S/B, PUTATAN, ELEM. SCHOOL, PHASE 1, BRGY. PUTATAN, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱20.7M | 100% | Medium risk49 | —-0.098 |
| 50 | 20OC0035CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF VILLANUEVA CREEK,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱47.3M | 100% | Medium risk49 | —-0.085 |