Opening the dossier…
Opening the dossier…
Contractor dossier
167 projects on file, including joint ventures this contractor is part of.
Total projects
167
Total budget
₱5.6B
Average progress
95.8%
Completion rate
85.0%
Average risk score
46.6
Medium risk on average, out of 100
Flagged as unusual
15
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 155 | ₱4.9B | 45.9 | 11 | 95.4% |
| Region III | 8 | ₱600.5M | 57.9 | 0 | 99.9% |
| Cordillera Administrative Region | 4 | ₱117.2M | 51.8 | 4 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 145 | ₱4.6B | 45.8 | 10 | 96.1% |
| Flood Control and Drainage | 12 | ₱551.2M | 48.6 | 1 | 98.9% |
| Buildings and Facilities | 4 | ₱11.1M | 23.4 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱322.9M | 95.5 | 3 | 59.6% |
| GAA 2025 OO-2 | 1 | ₱47.3M | 82.0 | 0 | 100.0% |
| OTHER | 1 | ₱40.3M | 72.9 | 1 | 94.2% |
| Water Provision and Storage | 1 | ₱3.3M | 25.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AG0022FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION ALONG ALAMINOS RIVER, SESELANGEN SECTION (SEGMENT B), BARANGAY SESELANGEN, SUAL, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱47.3M | 100% | High risk82 | —-0.008 |
| 24CL0057ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+000, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | High risk76 | —-0.050 |
| 24CL0102ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K0164+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 99% | High risk75 | —-0.020 |
| 24CL0151ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.047 |
| 24CL0042REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱69.9M | 100% | High risk73 | —-0.057 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 24A00437PREVENTIVE MAINTENANCE-TERTIARY ROADS, ASPHALT OVERLAY BINALONAN-ASINGAN -STA. MARIA ROAD, K0193+943-K0196+111,K0196+187-K0196+360,K0196+485-K0196+719,K0198+152-K0199+139 | Region I | Region I | Completed | ₱96.5M | 100% | High risk68 | —-0.043 |
| 16AI0253PREVENTIVE MAINT. BASED ON PAVEMENT MGMT SYSTEM/HIGHWAY DEVT & MGMT-4 (HDM-4) (INTERMITTENT SECTIONS | Region I | Pangasinan 3rd DEO | Completed | ₱18.7M | 100% | High risk66 | —-0.056 |
| 17AI0102IMPVT/WIDENING OF NATL RD ALONG BINALONAN-ASINGAN-STA. MARIA ROAD W/ RROW ACQUISITION, KO 186+850-KO | Region I | Pangasinan 3rd DEO | Completed | ₱43.1M | 100% | High risk65 | —-0.054 |
| 17AJ0036ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HDM-4, JUDGE JOSE DE VENECIA SR. AVE., K0.207+000 TO K0.207+073; K0.207+(-)611 TO K0.207+000; K0.207+(-)711 TO K0.207+(-)611, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.6M | 100% | High risk65 | —-0.053 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 17PA0119REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO416+079 - KO418+697 TO KO424+100 - KO424+386 | Cordillera Administrative Region | Abra DEO | Completed | ₱24M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0121REPAIR/REHABILITATION/IMPROVEMENT OFABRA- ILOCOS NORTE ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO413+000 - KO416+818 | Cordillera Administrative Region | Abra DEO | Completed | ₱35.6M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0118REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) KO424+492 - KO426+343; B.) KO435+551 - KO437+441 | Cordillera Administrative Region | Abra DEO | Completed | ₱23M | 100% | Medium risk52 | Flagged0.004 |
| 17PA0120REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) 429+850 - KO435+456 | Cordillera Administrative Region | Abra DEO | Completed | ₱34.6M | 100% | Medium risk52 | Flagged0.004 |
| 17AH0114REPAIR/REHAB./IMPROV'T.(ASPHALT OVERLAY)ALONG LABRADOR-LINGAYEN RD.,K0366+900-K0368+600 | Region I | Pangasinan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk58 | Flagged0.003 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
| 17AH0113REPAIR/REHAB./IMPV'T.(ASPHALT OVERLAY)ALONG LINGAYEN CAPITOL LOOP (LS)K0364+(-219)-K0364+836 | Region I | Pangasinan 2nd DEO | Completed | ₱11.7M | 100% | Medium risk58 | Flagged0.002 |
| 17AJ0089CONCRETING OF BRGY. PIAS FMR, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk20 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23A00271PREVENTIVE MAINTENANCE - SECONDARY ROADS, ACCESS ROAD TO AIRPORT ROAD PORO POINT - K0265 + (-273) - K0265 + (-128), K0265 + (-018) - K0265 + 891, K0265 + 904 - K0266 + 033, K0266 + 828 - K267 + 015 | Region I | Region I | Completed | ₱96.5M | 100% | Medium risk54 | —-0.075 |
| 27 | 25AG0155ASSET PRESERVATION - PREVENTIVE MAINTENANCE- SECONDARY ROADS - PANGASINAN-ZAMBALES RD - K0283+222 - K0289+498 | Region I | Pangasinan 1st DEO | On-Going | ₱90.4M | 100% | Medium risk54 | —-0.044 |
| 28 | 25AG0153ASSET PRESERVATION - PREVENTIVE MAINTENANCE- SECONDARY ROADS - PANGASINAN-ZAMBALES RD - K0269+501 - K0276+773 | Region I | Pangasinan 1st DEO | On-Going | ₱90.6M | 100% | Medium risk54 | —-0.046 |
| 29 | 24AG0110ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ALAMINOS BYPASS RD, K0300+(-269) TO K0321+172, ALAMINOS-BANI BYPASS RD. AT ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk53 | —-0.069 |
| 30 | 24AG0109ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BANI-AGNO RD, K0342+445 TO K0344+125 AT AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk53 | —-0.067 |
| 31 | 25AG0154ASSET PRESERVATION - PREVENTIVE MAINTENANCE- SECONDARY ROADS - PANGASINAN-ZAMBALES RD - K0276+773 - K0283+522 | Region I | Pangasinan 1st DEO | Completed | ₱90.5M | 100% | Medium risk53 | —-0.072 |
| 32 | 24A00314ROAD WIDENING-TERTIARY ROADS, SAN NICOLAS-NATIVIDAD-SAN QUINTIN-UMINGAN-GUIMBA ROAD K0204+000 - K0205+177, K0210+000 - K0211+400, K0212+811 - K0213+813 | Region I | Region I | On-Going | ₱86.6M | 0% | Medium risk53 | —-0.016 |
| 33 | 25AG0156ASSET PRESERVATION - PREVENTIVE MAINTENANCE- SECONDARY ROADS - PANGASINAN-ZAMBALES RD - K0329+602 - K0336+267 | Region I | Pangasinan 1st DEO | On-Going | ₱90.3M | 100% | Medium risk53 | —-0.045 |
| 34 | 17PA0118REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) KO424+492 - KO426+343; B.) KO435+551 - KO437+441 | Cordillera Administrative Region | Abra DEO | Completed | ₱23M | 100% | Medium risk52 | Flagged0.004 |
| 35 | 17PA0121REPAIR/REHABILITATION/IMPROVEMENT OFABRA- ILOCOS NORTE ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO413+000 - KO416+818 | Cordillera Administrative Region | Abra DEO | Completed | ₱35.6M | 100% | Medium risk52 | Flagged0.006 |
| 36 | 17PA0119REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO416+079 - KO418+697 TO KO424+100 - KO424+386 | Cordillera Administrative Region | Abra DEO | Completed | ₱24M | 100% | Medium risk52 | Flagged0.006 |
| 37 | 17PA0120REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) 429+850 - KO435+456 | Cordillera Administrative Region | Abra DEO | Completed | ₱34.6M | 100% | Medium risk52 | Flagged0.004 |
| 38 | 24CL0169REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO- BUGALLON RD - K0233 + 000 - K0233 + 530, K0243 + 900 - K0244 + 619, K0245 + 619 - K0246 + 950, MASINLOC & CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.082 |
| 39 | 19AJ0058PREVENTIVE MAINTENANCE ON PRIMARY ROADS, ASPHALT OVERLAY ALONG URDANETA JCT.-DAGUPAN ROAD, K0 191+(-266)-K0 193+863, STA. BARBARA, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱61.5M | 100% | Medium risk51 | —-0.084 |
| 40 | 19AJ0061PREVENTIVE MAINTENANCE ON SECONDARY ROADS, ASPHALT OVERLAY ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD, K0 187+055-K0 188+055, K0 192+517-K0 192+920, K0 192+935-K0 195+461, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱58.8M | 100% | Medium risk51 | —-0.087 |
| 41 | 18AI0049NETWORK DEVT-IMPVT/WIDENING OF NATL RD ALONG BINALONAN-ASINGAN-STA. MARIA RD. KO 198+786 - KO 200+405; KO 208+700 - KO 208+980 | Region I | Pangasinan 3rd DEO | Completed | ₱52.6M | 100% | Medium risk51 | —-0.087 |
| 42 | 24AI0009PREVENTIVE MAINTENANCE - SECONDARY ROADS - VILLASIS - MALASIQUI - SAN CARLOS ROAD K0178+134 - K0180+000, K0182+000 - K0182+468 | Region I | Pangasinan 3rd DEO | Completed | ₱47.2M | 100% | Medium risk50 | —-0.085 |
| 43 | 25AG0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱79.3M | 87% | Medium risk50 | —-0.023 |
| 44 | 20AI0072CONSTRUCTION OF ROAD, BARANGAY CARMAY EAST, ROSALES, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.085 |
| 45 | 21A00228CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, LASIP GRANDE - MALUED - LUCAO ROAD NETWORK, DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱53.1M | 100% | Medium risk50 | —-0.079 |
| 46 | 23AJ0043PREVENTIVE MAINTENANCE ON SECONDARY ROADS, ASPHALT OVERLAY ALONG CAMILING - WAWA - BAYAMBANG - MALASIQUI - STA. BARBARA RD., K0184+410 - K0187+055, K0199+412 -K0200+000 | Region I | Pangasinan 4th DEO | Completed | ₱54.7M | 100% | Medium risk50 | —-0.086 |
| 47 | 19AG0031ASSET PRESERVATION-PREVENTIVE MAINTENANCE-ALAMINOS-BOLINAO RD (KO326+000-KO328+000); KO334+500-KO336+500; KO354+000-KO356+398) AT ALAMINOS CITY/BANI/BOLINAO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱60.5M | 100% | Medium risk49 | —-0.079 |
| 48 | 19AJ0057PREVENTIVE MAINTENANCE ON SECONDARY ROADS, ASPHALT OVERLAY ALONG SAN CARLOS-CALASIAO ROAD, K0 205+149-K0 207+657, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱50.2M | 100% | Medium risk49 | —-0.084 |
| 49 | 25AJ0025PREVENTIVE MAINTENANCE-SECONDARY ROADS ALONG CARMEN JCT-BAYAMBANG-MANAT RD - K0203+ (-645) - K0203+065, K0211+271-K0212+446 | Region I | Pangasinan 4th DEO | On-Going | ₱47M | 100% | Medium risk49 | —-0.058 |
| 50 | 24AJ0069REHABILITATION OF ROAD, BARANGAY TALIBAEW, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱49M | 86% | Medium risk49 | —-0.044 |