Contractor dossier
174 projects on file, including joint ventures this contractor is part of.
Total projects
174
Total budget
₱6.6B
Average progress
97.4%
Completion rate
93.1%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
5
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 51 | ₱2B | 54.6 | 4 | 96.4% |
| Region IV-A | 40 | ₱1.4B | 43.8 | 0 | 98.3% |
| National Capital Region | 38 | ₱2B | 51.2 | 0 | 98.5% |
| Region I | 29 | ₱517.2M | 44.0 | 0 | 97.9% |
| Region III | 8 | ₱387M | 40.5 | 0 | 100.0% |
| Region VIII | 6 | ₱300.4M | 48.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱100M | 69.0 | 1 | 20.8% |
| Region IV-B | 1 | ₱14.7M | 49.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 65 | ₱2.7B | 49.2 | 2 | 99.3% |
| Buildings and Facilities | 53 | ₱1.8B | 42.0 | 1 | 97.4% |
| Roads | 37 | ₱1.4B | 52.4 | 0 | 97.4% |
| OTHER | 9 | ₱424.2M | 68.7 | 1 | 100.0% |
| Bridges | 8 | ₱142.4M | 46.4 | 0 | 89.4% |
| Bridges, Roads | 2 | ₱215.5M | 67.0 | 1 | 60.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 17FB0008OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, , LEGAZPI CITY-PUNTA DE JESUS ROAD, S05860LZ, K0539+241-K0541+000, K0541+656-K0543+000 | Region V | Albay 2nd DEO | Completed | ₱45.3M | 100% | High risk77 | —-0.036 |
| 24CC0173CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY SULIVAN (PUROK 3), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17FC0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE,TERTIARY BAG | Region V | Camarines Norte DEO | Completed | ₱17.2M | 100% | High risk73 | —-0.034 |
| 17AD0004CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONSTRUCTION OF STA. CRUZ-SUYO-SIGAY-DEL PILAR ROAD LEADING TO TIRAD PASS SHRINE. STA. CRUZ, ILOCOS SUR, 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 16DK0120CONST AND MAINT OF BRIDGES ALONG NAT'L ROADS REPLACEMENT OF WEAK BRIDGE @ CAMAYSA BRIDGE-TAYABAS CIT | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.031 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 17DB0100CONSTRUCTION OF BAYWALK IN BUTONG, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱47.5M | 100% | High risk68 | —-0.073 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
| 17A00015ASSET PRESERVATION, REHAB/RECON/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INC. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TAGUDIN-CERVANTES ROAD, K0324+854-K0325+1001, K0326+000-K0326+277, K0348+730-K0349+29 | Region I | Region I | Completed | ₱68.7M | 100% | High risk67 | —-0.048 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 19FA0080CLUSTER 44-REHAB/RESTORATION/RECONSTRUCTION OF COMUN FC DOWNSTREAM, MALINAO,ALBAY; TAYHI RC,TABACO CITY AND BAGONG SAN ROQUE SITE 1 RC, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱84.7M | 100% | High risk66 | —-0.022 |
| 23OD0241CLUSTER 01: CONSTRUCTION OF NEW PUP CAMPUS IN CALOOCAN NORTH, BARANGAY 168, CALOOCAN CITYA. CONSTRUCTION OF NEW POLYTECHNIC UNIVERSITY OF THE PHILIPPINES, BARANGAY 168, CALOOCAN CITYB. CONSTRUCTION OF ADMINISTRATIVE BUILDING - POLYTECHNIC UNIVERSITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱116.4M | 100% | High risk65 | —-0.026 |
| 17FE0005ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT 4 (HDM-4)-TERTIARY, NAGA CITY BDRY-CALABANGA-BALONGAY ROAD, K0454+757-K0457+000 | Region V | Camarines Sur 3rd DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.065 |
| 21OF0192CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY COMMONWEALTH, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 21OF0193CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 20D00036FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS, TAGAYTAY CALAMBA ROAD VIA CANLUBANG, LAGUNA SECTION, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.4M | 100% | High risk65 | —-0.056 |
| 17AD0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG SEVILLA BRIDGE MNR (DEEPENING OF WATERWAY AND CONSTRUCTION OF REVETMENT WALL), STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱10.7M | 100% | High risk65 | —-0.044 |
| 25DM0092CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PIRIS RIVER, BRGY. SABANG PIRIS, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.7M | 52% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 18FB0308CONSTRUCTION OF CLASSROOM 4STY8CL, PAG-ASA NATIONAL HIGH SCHOOL, PAG-ASA, RAWIS, LEGAZPI CITY (9.5M X 28.00M) | Region V | Albay 2nd DEO | On-Going | ₱37.1M | 100% | High risk61 | Flagged0.017 |
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22FF0049002: CONSTRUCTION/MAINTENACE OF FLOOD MITIGATION STRUCTURE & DRAINAGE SYSTEM CONST./REHAB./IMPROVEMENT OF FLOOD MITIGATION STRUCTURE BICOL RIVER FLOOD CONTROL BRGY. BAROBAYBAY (BAROBAYBAY SECT.- LEFT SIDE )MAGARAO CAM. SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱67.3M | 100% | Medium risk50 | —-0.084 |
| 77 | 25AD0031CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTA CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.7M | 40% | Medium risk50 | —-0.025 |
| 78 | 21AD0104REHABILITATION OF THE MUNICIPAL BUILDING, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.085 |
| 79 | 17EG0042REHABILITATION/MAJOR REPAIR OF IWAHIG BRIDGE (B00176PW) ALONG PUERTO PRINCESA SOUTH ROAD, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | Completed | ₱14.7M | 100% | Medium risk50 | —-0.015 |
| 80 | 22OB0246CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. RIVERA, SAN JUAN CITY (PACKAGE II) | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.5M | 100% | Medium risk50 | —-0.080 |
| 81 | 19OA0041CONSTRUCTION OF RIVERWALL ALONG MALABON-TULLAHAN RIVER, BRGY. NIUGAN, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱47.2M | 100% | Medium risk49 | —-0.086 |
| 82 | 18DD0572CONSTRUCTION OF 4STY20CL, RAFAEL M. LOJO MS, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱46.6M | 100% | Medium risk49 | —-0.050 |
| 83 | 18DB0100CONSTRUCTION OF CANALS AND SLOPE PROTECTION, BRGY. POBLACION, NPTI REGIONAL TRAINING CENTER, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.075 |
| 84 | 17OD0083CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 180 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱22.1M | 100% | Medium risk48 | —-0.062 |
| 85 | 17OB0002CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL BRGY. LOWER BICUTAN, TAGUIG CITY, 1ST LD | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.061 |
| 86 | 18FH0004CONSTRUCTION/UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS, CATANDUANES CIRCUMFERENTIAL ROAD K0121+000-K0122+000, K0122+000-K0122+540, CARAMORAN, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱17.1M | 100% | Medium risk48 | —-0.099 |
| 87 | 23DK0019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - WIDENING OF PERMANENT BRIDGES - PALILIAN BR. (B02441LZ) ALONG LUCBAN-MAJAYJAY RD | Region IV-A | Quezon 1st DEO | Completed | ₱31.4M | 100% | Medium risk48 | —-0.062 |
| 88 | 18DD0570CONSTRUCTION OF 4STY16CL, INOSLOBAN-MARAWOY ES, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱42M | 100% | Medium risk48 | —-0.050 |
| 89 | 18AD0049CONSTRUCTION OF STA. CRUZ -SIGAY -DEL PILAR ROAD LEADING TO TIRAD PASS SHRINE, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱47M | 100% | Medium risk48 | —-0.073 |
| 90 | 18OC0001IMPROVEMENT/SHEET PILING OF KAYBUBOY CREEK (SOUTH SIDE), BARANGAY SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.8M | 100% | Medium risk48 | —-0.086 |
| 91 | 18DP0042BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DAYAP BR. (B03134LZ) ALONG CALAUAN -NAGCARLAN BDRY ROAD. | Region IV-A | Laguna 3rd DEO | Completed | ₱25.1M | 100% | Medium risk47 | —-0.068 |
| 92 | 22FF0038OO2:CONST./REHAB./IMPROVEMENT OF FLOOD MITIGATION STRUCTURE MAGARAO FLOOD CONTROL(BELL-CASURAY-FUNDADO CREEK MAGARAO CAMARINES SUR) BOTH SIDES | Region V | Camarines Sur 3rd DEO | Completed | ₱48.1M | 100% | Medium risk47 | —-0.087 |
| 93 | 22FF0068CONTINUATION OF MULTI PURPOSE BUILDING,BRGY. SAN FRANCISCO MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱4.7M | 100% | Medium risk47 | —-0.099 |
| 94 | 17OB0088REHABILITATION OF NANGKA DRAINAGE SYSTEM INCLUDING LATERALS, BRGY. NANGKA, MARIKINA CITY 2ND LD | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.057 |
| 95 | 17OB0001CONSTRUCTION OF SLOPE PROTECTION ALONG OPEN CHANNEL LEADING TO HAGUNOY PUMPING STATION, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.061 |
| 96 | 18OA0049CONST./SEALING/IMPVT. OF RIVERWALL ALONG SOUTH PINAGKABALIAN RIVER, STA. 0+584 TO STA.0+873 (PH.III) | National Capital Region | Malabon-Navotas DEO | Completed | ₱46.8M | 100% | Medium risk47 | —-0.086 |
| 97 | 18DD0554CONSTRUCTION OF 4STY12CL, SAMPAGUITA ES, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱36.8M | 100% | Medium risk47 | —-0.053 |
| 98 | 18DK0063WIDENING OF PERMANENT BRIDGE AT KALYAAT BRIDGE (B02444LZ) ALONG JCT LUCBAN-LUISIANA ROAD, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱25.1M | 100% | Medium risk47 | —-0.066 |
| 99 | 18DK0062WIDENING OF PERMANENT BRIDGE AT NAPO BRIDGE (BO2443LZ) ALONG JCT LUCBAN-LUISIANA ROAD, LUCBAN, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱25.5M | 100% | Medium risk47 | —-0.066 |
| 100 | 19IJ0017CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER (UPSTREAM) BRGY. SAN MIGUEL, GANDARA , SAMAR | Region VIII | Samar 1st DEO | Completed | ₱39M | 100% | Medium risk47 | —-0.082 |