Opening the dossier…
Opening the dossier…
Contractor dossier
46 projects on file, including joint ventures this contractor is part of.
Total projects
46
Total budget
₱1.5B
Average progress
86.9%
Completion rate
69.6%
Below 70%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
10
21.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 28 | ₱1.1B | 51.0 | 7 | 83.3% |
| Cordillera Administrative Region | 18 | ₱428.1M | 49.0 | 3 | 92.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 18 | ₱284.9M | 41.6 | 0 | 99.4% |
| Flood Control and Drainage | 9 | ₱369.6M | 49.0 | 1 | 88.4% |
| Buildings and Facilities | 6 | ₱73.7M | 36.4 | 0 | 100.0% |
| Bridges | 3 | ₱258.2M | 57.4 | 2 | 33.0% |
| Water Provision and Storage | 3 | ₱10.8M | 28.9 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱58.2M | 95.8 | 2 | 58.0% |
| GAA 2025 OO-1 | 2 | ₱61.8M | 92.7 | 2 | 55.9% |
| OTHER | 2 | ₱313.8M | 87.2 | 2 | 61.7% |
| GAA 2025 OO-2 | 1 | ₱48.9M | 90.2 | 1 | 60.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 25PB0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES,MALABANIG BR. (B04237LZ) ALONG-ILOCOS NORTE RD(PHASE II) | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱29.1M | 70% | High risk93 | Flagged0.004 |
| 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | Region II | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 25BC0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS | Region II | Cagayan 2nd DEO | On-Going | ₱48.9M | 61% | High risk90 | Flagged0.001 |
| 24B00072OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN | Region II | Region II | On-Going | ₱218.3M | 90% | High risk84 | Flagged0.036 |
| 24BD0229OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA | Region II | Cagayan 3rd DEO | On-Going | ₱95.4M | 21% | High risk71 | Flagged0.048 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 24BD0229OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA | Region II | Cagayan 3rd DEO | On-Going | ₱95.4M | 21% | High risk71 | Flagged0.048 |
| 24B00072OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN | Region II | Region II | On-Going | ₱218.3M | 90% | High risk84 | Flagged0.036 |
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 25B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GUISING BR. (B01092LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD) | Region II | Region II | On-Going | ₱67.5M | 0% | Medium risk54 | Flagged0.010 |
| 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | Region II | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 25PB0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES,MALABANIG BR. (B04237LZ) ALONG-ILOCOS NORTE RD(PHASE II) | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱29.1M | 70% | High risk93 | Flagged0.004 |
| 25BC0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS | Region II | Cagayan 2nd DEO | On-Going | ₱48.9M | 61% | High risk90 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23BB0090OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLD MANAG'T PROG -CONST/REHAB OF FLD MITIGAT'N FACILITIES W/N MAJ. RIVER BASINS & PRINCIPAL RIVERS -CFMS - REPAIR/RESTORATION OF DAMAGED REVETMENT AT CAGAYAN RIVER REVETMENT 8, SAPPING, CAMALANIUGAN | Region II | Cagayan 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.055 |
| 27 | 18BD0150CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM (TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM ICT LABORATORY& FOUR (4) CLASSROOM REGULAR BUILDING), CAGAYAN NATIONAL HIGH SCHOOL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱34.2M | 100% | Medium risk45 | —-0.030 |
| 28 | 18BD0151CONSTRUCTION OF THREE (3) STOREY TWELVE (12) CLASSROOM (TWO (2) CLASSROOM REGULAR WORKSHOP/TWO (2) CLASSROOM SCIENCE LABORATORY & TWO (2) CLASSROOM ICT), CORDOVA NATIONAL HIGH SCHOOL, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱27.6M | 100% | Medium risk43 | —-0.037 |
| 29 | 20BC0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES-BASIGUIAN ROAD LEADING TO MANILA NORTH ROAD (MNR) CONNECTING TO AGRI-BUSINESS INDUSTRY (LIVESTOCK PRODUCTION, VEGETABLES, RICE, CORN AND COCONUT), CALOG SUR, ABULUG | Region II | Cagayan 2nd DEO | Completed | ₱14.2M | 100% | Medium risk42 | —-0.077 |
| 30 | 20BC0075CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-GANDIA BARANGAY ROAD LEADING TO JCT. AYAGA(ABULUG)-BALLESTEROS-APARRI ROAD CONNECTING TO AQUATIC RESOURCES, COCONUT PLANTATION AND LIVESTOCK, ALINUNU, ABULUG, CAGAYA | Region II | Cagayan 2nd DEO | Completed | ₱14.7M | 100% | Medium risk42 | —-0.078 |
| 31 | 22BC0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱12.1M | 100% | Medium risk41 | —-0.078 |
| 32 | 22BC0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, BALLESTEROS, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk41 | —-0.078 |
| 33 | 20BC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES-STA. FILOMENA-LANGAY BARANGAY ROAD LEADING TO JCT. AYAGA IN SUPPORT OF AGRIBUSINESS, BANGUIAN, AND STA. FILOMENA, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk41 | —-0.079 |
| 34 | 22BD0107CONCRETING OF BRGY. CENTRO CALAMAGUI FMR, BRGY. CENTRO CALAMAGUI, AMULUNG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱11.9M | 100% | Medium risk41 | —-0.016 |
| 35 | 19BD0120CONCRETING OF SITIO LARIBAR, BRGY. LARION BAJO FMR, BRGY. LARION BAJO, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.032 |
| 36 | 20BB0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS CONSTRUCTION OF CONCRETE ROAD MISSION-BUCALE- TAGCAR LEADING TO BUCALE CAVE, STA. TERESITA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.5M | 100% | Medium risk41 | —-0.079 |
| 37 | 21PB0015CONSTRUCTION (COMPLETION) OF DPWH FIELD CAMP BUILDING, LUTTUACAN, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱2.9M | 100% | Medium risk30 | —-0.079 |
| 38 | 19PB0041CONSTRUCTION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTOR SYSTEMS CONSTRUCTION / REHABILITATION - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - CAR | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱3.7M | 100% | Low risk29 | —-0.044 |
| 39 | 20PB0029CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTOR SYSTEMS - RAIN WATER COLLECTORS IN PUBLIC FACILITIES - CAR | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱4M | 100% | Low risk29 | —-0.045 |
| 40 | 22PB0001SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) MULTI-PURPOSE BUILDING (KALIPI), CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱2.3M | 100% | Low risk29 | —-0.079 |
| 41 | 18PB0031CONSTRUCTION/REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS) IN CAR | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱3.2M | 100% | Low risk28 | —-0.046 |
| 42 | 19BD0063ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-CONST./ UPGRADING/ REHAB.TATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS, CAGAYAN APAYAO ROAD, K0493+000-K0493+075,K0493+135-K0493+660, K0493+700-K0494+535,K0494+545-K0494+640 | Region II | Cagayan 3rd DEO | Completed | ₱3.9M | 100% | Low risk27 | —-0.083 |
| 43 | 20BC0198CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES-STA. FILOMENA-LANGAY BARANGAY ROAD LEADING TO JCT. AYAGA IN SUPPORT OF AGRIBUSINESS, BANGUIAN, AND STA. FILOMENA, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱2.5M | 100% | Low risk21 | —-0.079 |
| 44 | 18PB0037REPAIR/ REHABILITATION OF VARIOUS FLOOD CONTROL IN APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱646.8K | 100% | Low risk19 | —-0.065 |
| 45 | 19BD0082LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM, CONCRETING OF ROAD ATSAN GABRIEL, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱1M | 100% | Low risk18 | —-0.083 |
| 46 | 19BD0018LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BANGAG, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱1.7M | 100% | Low risk17 | —-0.085 |