Contractor dossier
57 projects on file, including joint ventures this contractor is part of.
Total projects
57
Total budget
₱338.1M
Average progress
56.7%
Completion rate
35.1%
Below 70%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
14
24.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 57 | ₱338.1M | 51.2 | 14 | 56.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 31 | ₱171.4M | 50.8 | 12 | 39.7% |
| Roads | 15 | ₱108.6M | 50.2 | 1 | 74.7% |
| Flood Control and Drainage | 11 | ₱58.1M | 53.6 | 1 | 79.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DC0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CALINGATAN, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 80% | High risk75 | —-0.037 |
| 25DC0192CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHASE II, BARANGAY MANGAHAN, MATAAS NA KAHOY, BATANG | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 0% | High risk75 | —-0.010 |
| 25DC0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM. BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING (C0VERED COURT), CENTRAL SCHOOL, BARANGAY 4, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 79% | High risk71 | —-0.037 |
| 25DC0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE STRUCTURE, DIMAYUGA STREET, BARANGAY II-A, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
| 25DC0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE STRUCTURE, PHASE II, DIMAYUGA STREET, BARANGAY II-A, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 65% | High risk71 | —-0.015 |
| 25DC0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP), - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY III, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 84% | High risk70 | —-0.023 |
| 25DC0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BABUYAN, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 98% | High risk68 | —-0.048 |
| 25DC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PHASE II, PUROK 1, BARANGAY MANGGAHAN, MA | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 0% | High risk67 | —-0.018 |
| 25DC0235OPENING AND CONCRETING OF BRGY. LUMANG LIPA FMR, BRGY. LUMANG LIPA, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱14.5M | 0% | High risk64 | Flagged0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DC0185BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN SAN SEBASTIAN ELEMENTARY SCHOOL, BRGY. SAN SEBASTIAN | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.035 |
| 24DC0186BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MATAASNAKAHOY SENIOR HIGH SCHOOL, LOCATED AT BRGY. B | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk53 | Flagged0.035 |
| 24DC0194BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN BAYORBOR NATIONAL HIGH SCHOOL, BRGY. BAYORBOR, MATAA | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.035 |
| 24DC0188BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2 -CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG BAYORBOR, BRGY. BAYORBOR, | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.035 |
| 24DC0195BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN SANTOL-MANGAHAN ELEMENTARY SCHOOL, BRGY. SANTOL, MAT | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.035 |
| 24DC0197BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN UPA PRIMARY SCHOOL, BRGY. UPA, MATAASNAKAHOY, BATANG | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.034 |
| 24DC0193BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG LOOB, BRGY. LOOB, MATAASNAK | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.034 |
| 24DC0196BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN BUBUYAN ELEMENTARY SCHOOL, BRGY. BUBUYAN, MATAASNAKA | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk54 | Flagged0.034 |
| 25DC0235OPENING AND CONCRETING OF BRGY. LUMANG LIPA FMR, BRGY. LUMANG LIPA, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱14.5M | 0% | High risk64 | Flagged0.034 |
| 24DC0192BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG LUMANGLIPA, BRGY. LUMANGLIP | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 24DC0189BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG KINALAGLAGAN, BRGY. KINALAG | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 24DC0190BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN MATAASNAKAHOY NATIONAL HIGH SCHOOL, BRGY. 4, MATAASN | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 24DC0187BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 1-STOREY CLASSROOM 2-CLASSROOM SCHOOL BUILDING IN PAARALANG SENTRAL NG MATAASNAKAHOY, BRGY. | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 25DC0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DRAINAGE STRUCTURE, DIMAYUGA STREET, BARANGAY II-A, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25DD0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY POCTOL, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱7.7M | 89% | Medium risk48 | —-0.064 |
| 27 | 23DC0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY KINALAGLAGAN, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.106 |
| 28 | 25DC0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF LAKE WALL, PUROK 7, BARANGAY KINALAGLAGAN, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 60% | Medium risk48 | —-0.039 |
| 29 | 25DC0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF DRAINAGE STRUCTURE, S. TEMPLO STREET, BARANGAY II-A, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 86% | Medium risk48 | —-0.049 |
| 30 | 25DC0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, PUROK 1, BARANGAY LUMANG LIPA, MATAAS NA KAHOY, BATANGA | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 90% | Medium risk48 | —-0.050 |
| 31 | 24DC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF DRAINAGE CANAL, PUROK 2, MENDOZA ST., BARAN | Region IV-A | Batangas 3rd DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.088 |
| 32 | 25DC0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF OPEN CANAL STRUCTURE, BARANGAY BAGBAG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 94% | Medium risk48 | —-0.051 |
| 33 | 24DE0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. KAINGIN, SAN PASCUAL, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.105 |
| 34 | 24DC0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LOOB, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 3% | Medium risk48 | —-0.025 |
| 35 | 24DC0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), RIZAL ST., BARANGAY SANTOL, MATAASNAKAHOY. BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.106 |
| 36 | 23DE0016CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BANALO, LOBO, BATANGAS. | Region IV-A | Batangas 2nd DEO | Completed | ₱5.9M | 100% | Medium risk48 | —-0.105 |
| 37 | 25DC0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF LAKEWALL ROAD, PHASE II, PUROK 2, BARANGAY LUMA | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 56% | Medium risk47 | —-0.064 |
| 38 | 25DC0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PUROK 7, BARANGAY SAN SEBASTIAN, MATAASNA | Region IV-A | Batangas 3rd DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.107 |
| 39 | 24DC0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF DRAINAGE CANAL, RAFAEL LUBIS ST., BARANGAY II-A, MATAASNAKAHOY, BATA | Region IV-A | Batangas 3rd DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.090 |
| 40 | 25DC0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PUROK 5, BARANGAY UPA, MATAAS NA KAHOY, BAT | Region IV-A | Batangas 3rd DEO | On-Going | ₱14.5M | 67% | Medium risk47 | —-0.067 |
| 41 | 25DC0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PUROK 1, BARANGAY MANGGAHAN, MATAASNAKAHO | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 0% | Medium risk47 | —-0.044 |
| 42 | 23DC0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, REHABILITATION OF CANAL AT BARANGAY 1, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.088 |
| 43 | 23DC0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC-INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF LINE CANAL, BRGY. 2, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.088 |
| 44 | 23DC0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY LOOB PROVINCIAL/NATIONAL ROAD, BARANG | Region IV-A | Batangas 3rd DEO | Completed | ₱14.8M | 100% | Medium risk47 | —-0.110 |
| 45 | 24DC0190BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN MATAASNAKAHOY NATIONAL HIGH SCHOOL, BRGY. 4, MATAASN | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 46 | 24DC0189BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG KINALAGLAGAN, BRGY. KINALAG | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 47 | 24DC0192BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 2-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAARALANG ELEMENTARYA NG LUMANGLIPA, BRGY. LUMANGLIP | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 48 | 24DC0187BASIC EDUCATIONAL FACILITIES FUND (BEFF): CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 1-STOREY CLASSROOM 2-CLASSROOM SCHOOL BUILDING IN PAARALANG SENTRAL NG MATAASNAKAHOY, BRGY. | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.9M | 0% | Medium risk46 | Flagged0.013 |
| 49 | 23DC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, SINFROZA SUBDIVISION, BARANGAY 3, MATAASNAKAHO | Region IV-A | Batangas 3rd DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.107 |
| 50 | 23DC0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY 1, MATAASNAKAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.110 |