183 projects on file, including joint ventures this contractor is part of.
Total projects
183
Total budget
₱7.9B
Average progress
97.9%
Completion rate
95.1%
Average risk score
37.3
Medium risk on average, out of 100
Flagged as unusual
4
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 182 | ₱7.7B | 37.1 | 4 | 97.9% |
| Region VIII | 1 | ₱193M | 64.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 113 | ₱4.5B | 35.6 | 1 | 97.3% |
| Flood Control and Drainage | 50 | ₱2.8B | 40.7 | 2 | 99.7% |
| Buildings and Facilities | 10 | ₱186.1M | 20.5 | 0 | 100.0% |
| Bridges | 4 | ₱48.6M | 34.9 | 0 | 100.0% |
| OTHER | 3 | ₱185.3M | 69.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱96.5M | 94.8 | 1 | 54.7% |
| GAA 2025 OO-2 | 1 | ₱48.3M | 88.1 | 0 | 89.8% |
| Bridges, Roads | 1 | ₱48M | 33.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 25CJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE 25, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱48.3M | 90% | High risk88 | —-0.020 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 20CK0070ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.064 |
| 17CJ0032ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4); TARLAC-GUIMBA RD VIA VICTORIA K0127+(-219) | Region III | Tarlac DEO | Completed | ₱67.5M | 100% | High risk70 | —-0.063 |
| 17CJ0063NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS, TARLAC - GUIMBA ROAD VIA VICTORIA, KO133+000 - KO136+000; KO144+989.80 - KO146+963.80 | Region III | Tarlac DEO | Completed | ₱80.1M | 100% | High risk70 | —-0.057 |
| 24CJ0376CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, LEFT DIKE, PACKAGE F, STA. MARIA - SAN BARTOLOME SECTION, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.010 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 20CJ0071NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱65.5M | 100% | High risk70 | —-0.035 |
| 23CJ0332CONSTRUCTION OF FLOOD CONTROL STRUCTURES WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG UNGOT CREEK PACKAGE R, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | High risk70 | —-0.014 |
| 24CJ0374CONSTRUCTION OF SLOPE PROTECTION STRUCTURES WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES - TARLAC RIVER CONTROL, PACKAGE T, BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.011 |
| 19CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GERONA-VICTORIA ROAD VIA ESTIPONA PURA, TARLAC | Region III | Tarlac DEO | Completed | ₱56.2M | 100% | High risk69 | —-0.037 |
| 17CJ0034NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO153+281 - KO153+611; KO148+675 - KO151+336 & KO151+431-KO152+471 | Region III | Tarlac DEO | Completed | ₱63.6M | 100% | High risk69 | —-0.038 |
| 24CJ0366CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, PACKAGE G, TIBAGAN SECTION , TIBAGAN, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.013 |
| 16CK0163ASSETS PRESERV. OF NATL RD., REHAB/RECONST/UPGRADING OF DAMAGED PAVE NATL RD INCL. DRAINAGE BASED ON | Region III | Tarlac 2nd DEO | Completed | ₱35.3M | 100% | High risk66 | —-0.067 |
| 16CK0189ASSETS PRESERV. OF NATL RDS-REHAB/RECONST OF NATL RDS W/ SLIPS, SLOPE COLLAPSE & LAND SLIDE ALONG | Region III | Tarlac 2nd DEO | Completed | ₱32.4M | 100% | High risk66 | —-0.067 |
| 18I00028ROAD WIDENING - PRIMARY ROADS: DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO), KO690+000-KO690+565; KO679+(-056)-KO680+133; KO680+163.60-KO680+572; KO680+596-KO680+879; KO680+909-KO682+330; KO682+345-KO684+389; KO684+423-KO685+000, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.059 |
| 24CJ0392CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 24CJ0393CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE F) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 23CK0115CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE I), CAPAS AND BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱75.6M | 88% | Medium risk43 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25CJ0270CONSTRUCTION OF DUEG - LABNEY DIVERSION ROAD (SEGMENT 1), MAYANTOC, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.3M | 1% | Medium risk53 | —-0.032 |
| 27 | 24CJ0227CONSTRUCTION OF NEW CLARK CITY-TARLAC CITY DIVERSION ROAD (SEGMENT O), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱144.8M | 100% | Medium risk53 | —-0.076 |
| 28 | 24CJ0233CONSTRUCTION OF NEW CLARK CITY-TARLAC CITY DIVERSION ROAD (SEGMENT P), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱144.8M | 100% | Medium risk53 | —-0.076 |
| 29 | 22CJ0227SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, PCWR TO ROMULO HIWAY (BURGOS PANIQUI TO BOTBOTONES STA. IGNACI | Region III | Tarlac DEO | Completed | ₱94.2M | 100% | Medium risk52 | —-0.087 |
| 30 | 25CJ0251REHABILITATION OF TARLAC CITY SOUTHWEST DIVERSION ROAD, TIBAG - TIBAGAN SECTION (SEGMENT 2), TARLAC CITY | Region III | Tarlac DEO | On-Going | ₱95.1M | 7% | Medium risk52 | —-0.036 |
| 31 | 24CJ0262CONSTRUCTION OF TARLAC CITY-SAN JOSE DIVERSION ROAD (SEGMENT A) TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱144.8M | 100% | Medium risk52 | —-0.076 |
| 32 | 23CJ0157SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER LEFT DIKE DIVERSION ROAD SLOPE PROTECTION, ALONG TARLAC RIVER CONTROL L | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk52 | —-0.089 |
| 33 | 22CJ0100SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER RIGHT DIKE DIVERSION ROAD, TARLAC | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk52 | —-0.087 |
| 34 | 17CJ0181CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, NAGATEL BR. (BO1370 LZ) ALONG PANIQUI - CAMILING - WAWA ROAD | Region III | Tarlac DEO | Completed | ₱11.5M | 100% | Medium risk51 | —-0.036 |
| 35 | 24CJ0260CONSTRUCTION OF DIVERSION ROAD ALONG TARLAC RIVER RIGHT DIKE (SEGMENT B), TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.089 |
| 36 | 23CJ0357CONSTRUCTION OF BY-PASS AND DIVERSION ROADS NEW CLARK CITY-TARLAC CITY DIVERSION ROAD PACKAGE E, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk49 | —-0.023 |
| 37 | 25CJ0128CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TARLAC CITY NORTHWESTERN ALTERNATE ROUTE (SAN ISIDRO - AGUSO), (PHASE 8), TARLAC | Region III | Tarlac DEO | On-Going | ₱92.9M | 62% | Medium risk47 | —-0.052 |
| 38 | 19CJ0082NETWORK DEVELOPMENT PROGRAM ROAD WIDENING ROMULO H-WAY K0155 + 529.20 - K0156 + 523 | Region III | Tarlac DEO | Completed | ₱91.7M | 100% | Medium risk46 | —-0.087 |
| 39 | 18CJ0177NETWORK DEVELOPMENT PROGRAM ROAD WIDENING ROMULO H-WAY - K0130 + 590.00 - K0131 + 119.50, K0138 + 602.00 - K0139 + 349.00, K0147 + 756.70 - K0148 + 169.70, K0150 + 812.10 - K0151 + 902.00, K0153 + 750.80 - K0154 + 661.00, K0154 + 695.00 - K0155 + 457.60, | Region III | Tarlac DEO | Completed | ₱91.7M | 100% | Medium risk44 | —-0.090 |
| 40 | 23CK0115CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE I), CAPAS AND BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱75.6M | 88% | Medium risk43 | Flagged0.008 |
| 41 | 24CJ0378CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG RIO CHICO RIVER INCLUDING ROAD COMPONENT, PACKAGE C, VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱48.3M | 100% | Medium risk41 | —-0.027 |
| 42 | 18CJ0206CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | Completed | ₱73.4M | 100% | Medium risk39 | —-0.093 |
| 43 | 20CJ0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | Completed | ₱55.7M | 100% | Medium risk39 | —-0.094 |
| 44 | 23CJ0162NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MONCADA-SAN MANUEL BYPASS ROAD , TARLAC (PACKAGE H) | Region III | Tarlac DEO | Completed | ₱72.4M | 100% | Medium risk39 | —-0.093 |
| 45 | 23CJ0160NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF MONCADA-SAN MANUEL BYPASS ROAD, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱72.4M | 100% | Medium risk39 | —-0.093 |
| 46 | 23CJ0093NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MNR TO TARLAC-SAN MIGUEL VIA. MACABULOS ROAD (PHASE 2), TARLAC | Region III | Tarlac DEO | Completed | ₱63.3M | 100% | Medium risk38 | —-0.097 |
| 47 | 23CJ0198NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF TARLAC RIVER RIGHT DIKE BYPASS/DIVERSION ROAD (TARLAC 2ND LEGISLATIVE DISTRICT SECTION - PACKAGE C), TARLAC | Region III | Tarlac DEO | Completed | ₱71.6M | 100% | Medium risk38 | —-0.095 |
| 48 | 18CJ0139NETWORK DEVELOPMENT PROGRAM ROAD WIDENING TARLAC-SN MIGUEL VIA MACABULOS RD - K0122 + 400 - K0124 + 750 | Region III | Tarlac DEO | Completed | ₱87.5M | 100% | Medium risk38 | —-0.089 |
| 49 | 23CJ0188NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CONSTRUCTION OF TARLAC RIVER RIGHT DIKE BYPASS/DIVERSION ROAD (TARLAC 2ND LEGISLATIVE DISTRICT SECTION - PACKAGE B), TARLAC | Region III | Tarlac DEO | Completed | ₱71.6M | 100% | Medium risk38 | —-0.095 |
| 50 | 20CJ0103CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF SAN JOSE, TARLAC-PALAUIG, ZAMBALES ROAD INCLUDING DRAINAGE PHASE 13, SAN JOSE TARLAC | Region III | Tarlac DEO | Completed | ₱48.5M | 100% | Medium risk38 | —-0.083 |