Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱3.8B
Average progress
97.1%
Completion rate
90.4%
Average risk score
55.4
Medium risk on average, out of 100
Flagged as unusual
7
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 52 | ₱3B | 56.2 | 5 | 99.7% |
| Region I | 15 | ₱362.5M | 52.7 | 1 | 93.7% |
| Region IV-A | 2 | ₱193M | 60.1 | 0 | 100.0% |
| Region III | 2 | ₱96.7M | 36.7 | 0 | 100.0% |
| Region VI | 1 | ₱96.2M | 94.2 | 1 | 0.2% |
| Region II | 1 | ₱48M | 46.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 32 | ₱2B | 53.5 | 2 | 100.0% |
| Flood Control and Drainage | 17 | ₱1B | 52.9 | 2 | 99.9% |
| Bridges | 14 | ₱369.2M | 50.5 | 1 | 93.2% |
| GAA 2025 OO-1 | 4 | ₱126M | 88.8 | 0 | 98.3% |
| OTHER | 3 | ₱195.2M | 74.9 | 1 | 97.8% |
| Buildings and Facilities | 2 | ₱17.1M | 28.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.2M | 94.2 | 1 | 0.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0011CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY SAN ROQUE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱96.2M | 0% | High risk94 | Flagged0.020 |
| 25PJ001025PJ0010: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY RD - K0445 + 765 - K0446 + 735, K0446 + 775 - K0447 + 282 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱78.5M | 96% | High risk93 | —-0.001 |
| 25PJ001225PJ0012: ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0398 + 033 - K0398 + 130, K0398 + 481 - K0398 + 593, K0399 + 032 - K0399 + 503, K0400 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱32.2M | 98% | High risk92 | —-0.004 |
| 25PJ002225PJ0022: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-GUIHOB BR. (B04284LZ) ALONG BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱7.2M | 100% | High risk90 | —-0.032 |
| 25PJ002025PJ0020: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-COSILE BR. (B02215LZ) ALONG JCT POTIA-MT PROVINCE BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱8.2M | 100% | High risk80 | —-0.030 |
| 21P00050LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF NAGUEY FLOOD CONTROL, ATOK, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.016 |
| 23PE0028CONSTRUCTION OF ROAD, BAGUIO GOLD - MANGGA, BARANGAYS LOACAN AND TUDING, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱69.3M | 93% | High risk75 | Flagged0.016 |
| 16AD0158REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCUDING DRAINAGE BASED ON PAVEMENT MANGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANGEMENT -4 (HDM-4) , BURGOS, LIDLIDDA ROAD, K0363+655-K0364+000, K0364+000-K0364+655 | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.024 |
| 17AE0040REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER CONTROL AT BRGY. OLD. CENTRAL, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 16AD0149REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT-4(HDM-4), JCT. STA. LUCIA-SALCEDO ROAD, K0340+000-K0341+000 AND K0341+918-K0342+000 | Region I | Ilocos Sur 2nd DEO | Completed | ₱31.3M | 100% | High risk64 | —-0.049 |
| 16AD0133PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TAGUDIN-CERVANTES ROAD, K0330+144-K0330+000, K0331+000-K0331+645 | Region I | Ilocos Sur 2nd DEO | Completed | ₱8.8M | 100% | High risk64 | —-0.056 |
| 16AD0157CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION OF SAN ANTONIO- SAN PEDRO RIVER CONTROL, NARVACAN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.039 |
| 24PJ001724PJ0017: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MAPACOPACO FLOOD CONTROL, STA. 38+850 - STA. 39+900 (R/S), POSNAAN, AGUINALDO, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱98M | 100% | High risk62 | —-0.057 |
| 17PA0031NETWORK DEVELOPMENT- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ABRA-KALINGA ROAD, KO421+600 - KO425+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱69.5M | 100% | High risk62 | —-0.043 |
| 22PI0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYUDAN RIVER, KABULAWAN - BUSILAC BILA - OTUCAN SUR, STA. 55+800 - STA. 56+480 (B.S.), BAUKO, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 16PA007716PA0077 - ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF ABRA-ILOCOS SUR ROAD; KO398+000 - KO398+475; KO398+513 - KO399+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱27.4M | 100% | High risk60 | —-0.046 |
| 22DH0049REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANSLIDE, SECONDARY ROADS, CALAMBA-STA. CRUZ-FAMY JCT. ROAD, K0096+487 TO K0096 + 598 CALAMBA-STA. CRUZ-FAMY JCT ROADS | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 22DH0048REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD, CALAMBA-STA. CRUZ-FAMY JCT ROAD K0096 + 376 TO K0096 + 487, CALAMBA-STA. CRUZ-FAMY JCT ROAD | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 17PA0029CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-BANI HOTSPRING ACCESS ROAD, PHASE III, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱19.3M | 100% | High risk60 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0011CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY SAN ROQUE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱96.2M | 0% | High risk94 | Flagged0.020 |
| 17PL0204PACKAGE 2: A) BALONG FLOOD CONTROL ALONG BALIGATAN CREEK, BRGY. BALONG, TABUK CITY, B) CANAL LINING (MEGA CANAL), PUROK 5, BULANAO CENTRO, TABUK CITY, C) BULANAO CEMETERY FLOOD CONTROL, BULANAO, TABUK CITY, D) APPAS FLOOD CONTROL (AGLAWA, BAG-AY & AGNAYA) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱76.8M | 100% | Medium risk58 | Flagged0.016 |
| 23PE0028CONSTRUCTION OF ROAD, BAGUIO GOLD - MANGGA, BARANGAYS LOACAN AND TUDING, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱69.3M | 93% | High risk75 | Flagged0.016 |
| 17PL0235PACKAGE 9: A) ALUBBAGAN FLOOD CONTROL ALONG BIGA RIVER, BRGY. DUPLIGAN, TANUDAN B) BANNENG FLOOD CONTROL, TABUK | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱28.8M | 100% | Medium risk53 | Flagged0.011 |
| 25A00313REPLACEMENT OF PERMANENT WEAK BRIDGES - MARAGAYAP EAST BR. (B02654LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱28.1M | 14% | Medium risk46 | Flagged0.004 |
| 17PA0085REPAIR/REHABILITATION/IMPROVEMENT OF ABABENG-CAUPASAN ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱26.1M | 100% | Medium risk51 | Flagged0.003 |
| 17PA0059CONSTRUCTION/REHABILITATION OF JUNCTION-TAYAWA ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱17.6M | 100% | Medium risk52 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25GP0011CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY SAN ROQUE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱96.2M | 0% | High risk94 | Flagged0.020 |
| 2 | 25PJ001025PJ0010: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY RD - K0445 + 765 - K0446 + 735, K0446 + 775 - K0447 + 282 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱78.5M | 96% | High risk93 | —-0.001 |
| 3 | 25PJ001225PJ0012: ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0398 + 033 - K0398 + 130, K0398 + 481 - K0398 + 593, K0399 + 032 - K0399 + 503, K0400 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱32.2M | 98% | High risk92 | —-0.004 |
| 4 | 25PJ002225PJ0022: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-GUIHOB BR. (B04284LZ) ALONG BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱7.2M | 100% | High risk90 | —-0.032 |
| 5 | 25PJ002025PJ0020: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-COSILE BR. (B02215LZ) ALONG JCT POTIA-MT PROVINCE BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱8.2M | 100% | High risk80 | —-0.030 |
| 6 | 21P00050LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF NAGUEY FLOOD CONTROL, ATOK, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.016 |
| 7 | 23PE0028CONSTRUCTION OF ROAD, BAGUIO GOLD - MANGGA, BARANGAYS LOACAN AND TUDING, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱69.3M | 93% | High risk75 | Flagged0.016 |
| 8 | 16AD0158REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCUDING DRAINAGE BASED ON PAVEMENT MANGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANGEMENT -4 (HDM-4) , BURGOS, LIDLIDDA ROAD, K0363+655-K0364+000, K0364+000-K0364+655 | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.024 |
| 9 | 17AE0040REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER CONTROL AT BRGY. OLD. CENTRAL, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 10 | 16AD0149REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT-4(HDM-4), JCT. STA. LUCIA-SALCEDO ROAD, K0340+000-K0341+000 AND K0341+918-K0342+000 | Region I | Ilocos Sur 2nd DEO | Completed | ₱31.3M | 100% | High risk64 | —-0.049 |
| 11 | 16AD0133PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TAGUDIN-CERVANTES ROAD, K0330+144-K0330+000, K0331+000-K0331+645 | Region I | Ilocos Sur 2nd DEO | Completed | ₱8.8M | 100% | High risk64 | —-0.056 |
| 12 | 16AD0157CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION OF SAN ANTONIO- SAN PEDRO RIVER CONTROL, NARVACAN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.039 |
| 13 | 24PJ001724PJ0017: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MAPACOPACO FLOOD CONTROL, STA. 38+850 - STA. 39+900 (R/S), POSNAAN, AGUINALDO, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱98M | 100% | High risk62 | —-0.057 |
| 14 | 17PA0031NETWORK DEVELOPMENT- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ABRA-KALINGA ROAD, KO421+600 - KO425+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱69.5M | 100% | High risk62 | —-0.043 |
| 15 | 22PI0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYUDAN RIVER, KABULAWAN - BUSILAC BILA - OTUCAN SUR, STA. 55+800 - STA. 56+480 (B.S.), BAUKO, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 16 | 16PA007716PA0077 - ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF ABRA-ILOCOS SUR ROAD; KO398+000 - KO398+475; KO398+513 - KO399+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱27.4M | 100% | High risk60 | —-0.046 |
| 17 | 22DH0049REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANSLIDE, SECONDARY ROADS, CALAMBA-STA. CRUZ-FAMY JCT. ROAD, K0096+487 TO K0096 + 598 CALAMBA-STA. CRUZ-FAMY JCT ROADS | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 18 | 22DH0048REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD, CALAMBA-STA. CRUZ-FAMY JCT ROAD K0096 + 376 TO K0096 + 487, CALAMBA-STA. CRUZ-FAMY JCT ROAD | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 19 | 17PA0029CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-BANI HOTSPRING ACCESS ROAD, PHASE III, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱19.3M | 100% | High risk60 | —-0.051 |
| 20 | 17PA0004ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) ABRA-KALINGA ROAD, KO445+000-KO447+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱19.6M | 100% | Medium risk60 | —-0.046 |
| 21 | 17PA0039REHABILITATION OF ABRA-ILOCOS NORTE ROAD, ABRA-ILOCOS NORTE ROAD, KO419+000 - KO422+900, LA PAZ AND DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.5M | 100% | Medium risk60 | —-0.044 |
| 22 | 16PA0081NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; ABRA-ILOCOS SUR ROAD, KO388+400-KO388+791; KO388+920-KO389+000; KO391+947-KO392+245; KO393+950-KO394+050; KO395+174-KO395+209 | Cordillera Administrative Region | Abra DEO | Completed | ₱26.4M | 100% | Medium risk60 | —-0.046 |
| 23 | 22P00027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -TERTIARY ROADS - GOV. BADO DANGWA NATIONAL RD, KO339+323 - KO339+548 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | Medium risk59 | —-0.062 |
| 24 | 24AF0034WIDENING OF PERMANENT BRIDGES, MACALBA BR (B00820LZ), ALONG AGOO-BAGUIO CITY CITY RD, AGOO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱39.4M | 100% | Medium risk59 | —-0.023 |
| 25 | 23P00013CONSTRUCTION OF ROAD, GUMHANG - LUHONG - DANGGO - AMBAGUIO, TINOC, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk59 | —-0.048 |