Contractor dossier
156 projects on file, including joint ventures this contractor is part of.
Total projects
156
Total budget
₱3.6B
Average progress
96.0%
Completion rate
89.1%
Average risk score
33.7
Medium risk on average, out of 100
Flagged as unusual
5
3.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 155 | ₱3.6B | 33.6 | 5 | 96.0% |
| National Capital Region | 1 | ₱49M | 48.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 59 | ₱1.2B | 34.4 | 3 | 94.0% |
| Buildings and Facilities | 50 | ₱585.8M | 28.9 | 0 | 96.1% |
| Flood Control and Drainage | 41 | ₱1.6B | 36.6 | 0 | 99.7% |
| Water Provision and Storage | 3 | ₱111.1M | 42.8 | 1 | 96.4% |
| Bridges | 2 | ₱42.9M | 30.8 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱32.6M | 89.1 | 1 | 52.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CL0140REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0179 + 156 - K0179 + 390, K0215 + 000 - K0215 + 500, K0223 + 725 - K0224 + 000, K0241 + 920 - K0242 + 524, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱32.6M | 52% | High risk89 | Flagged0.006 |
| 24CL0130CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, BALINCAGUING SECTION (PHASE I), SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.2M | 100% | High risk81 | —-0.043 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
| 24CL0143CONSTRUCTION OF SLOPE PROTECTION PACKAGE 18 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.045 |
| 24CM0009ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0133+040, K0133+223.30, K0133+305.15, K0133+353.70, K0133+404.45, K0133+550, K0135+300, K0135+332, K0135+372.70, SUB | Region III | Zambales 2nd DEO | On-Going | ₱69.5M | 85% | High risk74 | —-0.024 |
| 25CM0042CSSP, BIP, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF SUBIC-CAWAG-BALAYBAY ROAD (HANJIN ROAD INTERMITTENT SECTION), SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱77.6M | 87% | High risk74 | —-0.029 |
| 25CM0071CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF SAN MARCELINO MULTI-PURPOSE BUILDING INCLUDING FACILITIES PHASE 2, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱29.3M | 41% | High risk74 | —-0.017 |
| 24CL0092CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZNHS, ZONE 6, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱42.9M | 68% | High risk74 | —-0.017 |
| 24CL0193CONSTRUCTION OF MULTI-PURPOSE FACILITY, CALIGUIT, BARANGAY DIRITA, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱39.1M | 100% | High risk74 | —-0.034 |
| 25CM0069CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF SAN MARCELINO MUNICIPAL HALL AT SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱24.4M | 0% | High risk74 | —-0.004 |
| 24CL0111CONSTRUCTION OF ACADEMIC BLDG. FOR COLLEGE OF MARINE ENGINEERING PMMA, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱29M | 100% | High risk74 | —-0.062 |
| 24CL0127CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 3, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.6M | 100% | High risk73 | —-0.057 |
| 24CM0056MULTI-PURPOSE/FACILITIES, REHABILITATION OF DPWH ZAMBALES 2ND DISTRICT ENGINEERING OFFICE BUILDING, SAN NICOLAS, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱16M | 100% | High risk73 | —-0.065 |
| 25CL0183CONCRETING OF BANTAY CARMEN TO SAGPAT FMR, BRGY. MALOMA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱49.1M | 0% | High risk72 | Flagged0.044 |
| 25CK0061CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PARULUNG, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱7.9M | 98% | High risk71 | —-0.044 |
| 23CL0175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 3) | Region III | Zambales 1st DEO | On-Going | ₱38.1M | 0% | High risk70 | Flagged0.051 |
| 25CL0186CONCRETING OF STA. RITA FMR, BRGY. BANGANTALINGA, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 0% | High risk69 | Flagged0.043 |
| 24CL0192CONSTRUCTION OF ROAD, BARANGAY BURGOS, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱14.5M | 100% | High risk69 | —-0.062 |
| 25CK0015REHABILITATION OF EXISTING DIKE ALONG SAPANG KWARTEL (BRGY. MINANE), PHASE I, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱14.7M | 100% | High risk68 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CL0175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 3) | Region III | Zambales 1st DEO | On-Going | ₱38.1M | 0% | High risk70 | Flagged0.051 |
| 25CL0183CONCRETING OF BANTAY CARMEN TO SAGPAT FMR, BRGY. MALOMA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱49.1M | 0% | High risk72 | Flagged0.044 |
| 25CL0186CONCRETING OF STA. RITA FMR, BRGY. BANGANTALINGA, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱19.7M | 0% | High risk69 | Flagged0.043 |
| 25CL0140REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0179 + 156 - K0179 + 390, K0215 + 000 - K0215 + 500, K0223 + 725 - K0224 + 000, K0241 + 920 - K0242 + 524, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱32.6M | 52% | High risk89 | Flagged0.006 |
| 24CM0067BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF CASTILLEJOS WATER SYSTEM, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱99M | 89% | High risk80 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24CL0041REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0167+000 - K0167+175.50, K0177+355 - K0177+924, K0224+000 - K0224+562, K0242+524 - K0243+900, SAN FELIPE, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱58.4M | 100% | Medium risk40 | —-0.088 |
| 27 | 25CM0037CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING AT SUBIC BY-PASS ROAD, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱49M | 74% | Medium risk40 | —-0.062 |
| 28 | 24CM0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF ROAD AT BARANGAY KALAKLAN, O.C. | Region III | Zambales 2nd DEO | Completed | ₱29.4M | 100% | Medium risk38 | —-0.099 |
| 29 | 21CM0072LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROAD - CONSTRUCTION/REHABILITATION OF ELICAÑO STREETFROM E-21 STREET TO THE STEEL BRIDGE, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱29.2M | 100% | Medium risk38 | —-0.100 |
| 30 | 22CL0065CONSTRUCTION OF THE NEW MUNICIPAL HALL, PHASE 2, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱39.2M | 100% | Medium risk37 | —-0.090 |
| 31 | 23CM0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, CONSTRUCTION OF ACCESS ROAD, OLONGAPO FISH PORT, BRGY. KALAKLAN, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱19.1M | 100% | Medium risk37 | —-0.097 |
| 32 | 22CM0053SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, 21ST ST., RIZAL AVENUE TO JOHNSON ST., EAST BAJAC-BAJAC, OLONG | Region III | Zambales 2nd DEO | Completed | ₱19.6M | 100% | Medium risk37 | —-0.100 |
| 33 | 24CM0060CONSTRUCTION OF MULTI-PURPOSE BUILDING IN EAST TAPINAC, 14 ST. OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱19.8M | 100% | Medium risk36 | —-0.096 |
| 34 | 22CM0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. PAG-ASA, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱19.5M | 100% | Medium risk36 | —-0.098 |
| 35 | 23CL0022CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAYTO RIVER, NORTH APPROACH, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱49M | 100% | Medium risk36 | —-0.038 |
| 36 | 20CK0096CONSTRUCTION OF ROAD INCLUDING CURB & GUTTER, CONCRETE PAVEMENT/PARKING AREA AND LANDSCAPING OF DPWH - TARLAC 2ND DISTRICT ENGINEERING OFFICE, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱14.8M | 100% | Medium risk36 | —-0.041 |
| 37 | 24CK0010ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD ALONG CONCEPCION - LA PAZ ROAD, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱49.4M | 100% | Medium risk35 | —-0.102 |
| 38 | 25CK0017REHABILITATION OF EXISTING DIKE ALONG LUCUNG RIVER, PHASE 1, (MALUPA SECTION, RIGHT BANK), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱74.2M | 95% | Medium risk35 | —-0.053 |
| 39 | 23CK0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: I. CONSTRUCTION OF MULTI-PURPOSE BUILDING CONCEPCION MUNICIPAL, CONCEPCION, TARLAC II. CONSTRUCTION OF CONCEPCION MUNICIP | Region III | Tarlac 2nd DEO | Completed | ₱39.6M | 100% | Medium risk35 | —-0.098 |
| 40 | 23CM0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEMS, WATER SUPPLY SYSTEMS, CONSTRUCTION OF SOLAR WATER SYSTEM, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱9.8M | 100% | Medium risk34 | —-0.066 |
| 41 | 23CK0011CONSTRUCTION OF GROUNDSILL WITH REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, DOWNSTREAM OF STA. RITA BRIDGE (PHASE 1), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱72.4M | 100% | Medium risk34 | —-0.087 |
| 42 | 23CL0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BAYTO RIVER (UPSTREAM NORTH APPROACH PHASE I), STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱44.1M | 93% | Medium risk34 | —-0.034 |
| 43 | 23CK0057CONCRETING OF BRGY. STA. LUCIA TO BRGY. BINYAYAN FMR, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱19.9M | 100% | Medium risk34 | —-0.039 |
| 44 | 23CK0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP): NEW CLARK CITY TO TARLAC - ZAMBALES ROAD VIA KALANGITAN ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱34.3M | 100% | Medium risk34 | —-0.102 |
| 45 | 24CL0126CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 2, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47.6M | 100% | Medium risk34 | —-0.085 |
| 46 | 22CM0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF TRIAGE AND ISOLATION FACILITY JAMES L. GORDON MEMORIAL HOSPITAL, BRGY. ASINAN, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.102 |
| 47 | 23CK0005NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - TERTIARY ROADS ALONG BAMBAN POBLACION ROAD, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱29.4M | 100% | Medium risk34 | —-0.101 |
| 48 | 23CL0068CONSTRUCTION OF STO. TOMAS RIVER FLOOD CONTROL STRUCTURE PACKAGE 3, BARANGAY OMAYA, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱48.8M | 100% | Medium risk33 | —-0.085 |
| 49 | 20CL0020CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BRGY. ANGELES, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.8M | 100% | Medium risk33 | —-0.100 |
| 50 | 20CL0051CONSTRUCTION OF MULTI-PURPOSE BUILDING, NAVSOG, NAVAL EDUCATIONAL TRAINING COMMAND (NETC), SAN MIGUEL, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.100 |