Contractor dossier
67 projects on file, including joint ventures this contractor is part of.
Total projects
67
Total budget
₱5.4B
Average progress
95.5%
Completion rate
80.6%
Average risk score
61.8
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 67 | ₱5.4B | 61.8 | 0 | 95.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 59 | ₱5.1B | 61.5 | 0 | 97.5% |
| Roads | 4 | ₱63.5M | 61.0 | 0 | 61.0% |
| OTHER | 2 | ₱226.9M | 78.7 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱19.6M | 53.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 16F00072MFO1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT: CONST. OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, BACON-MANITO ROAD, ROAD COMPONENTS (BRGY. OSIAO-BRGY. STO. NIÑO),SORSOGON 1ST LD, BACON, SORSOGON PROVINCE | Region V | Region V | Completed | ₱183.3M | 100% | High risk80 | —-0.005 |
| 16F00121MFO1-REHAB./CONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, LIGAO-PIODURAN ROAD, LIGAO AND PIODURAN, ALBAY PROVINCE | Region V | Region V | Completed | ₱43.6M | 100% | High risk77 | —-0.033 |
| 20F00143REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN JOSE-SAN ISIDRO SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.3M | 100% | High risk76 | —-0.003 |
| 20F00144REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (SAN ISIDRO - SAGRADA SECTION), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱181.5M | 100% | High risk76 | —-0.003 |
| 24F00391REHABILITATION/RECONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SOLONG RIVER, BRGY. LIBOD, CAMALIG, ALBAY, CAMALIG, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱173.7M | 92% | High risk74 | —-0.025 |
| 22F00010OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD MITIGATION STRUCTURE AT TIBU RIVER, LEGAZPI CITY, ALBAY 2ND LEGISLATIVE DIST | Region V | Region V | On-Going | ₱144.7M | 46% | High risk73 | —-0.002 |
| 23FO0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XIV-2023: (1) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER AT SAN ISIDRO, OAS, ALBAY; AND (2) CONSTRUC, | Region V | Albay 3rd DEO | On-Going | ₱144.6M | 95% | High risk72 | —-0.023 |
| 23FO0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XV - FY 2 | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.065 |
| 23FO0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING INFRASTRUCTURES/FACILITIES & BASIC INFRASTRUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVI-2023 : (1) CO | Region V | Albay 3rd DEO | Completed | ₱146.6M | 100% | High risk72 | —-0.066 |
| 24FO0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JUAN BRIDGE | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 95% | High risk72 | —-0.033 |
| 24FO0086ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINANGANURAN RIVER FLOOD CONTROL STRUCTURE ALONG SPILLW | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk72 | —-0.066 |
| 24FO0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KALAKRAN RIVER, PUROK | Region V | Albay 3rd DEO | On-Going | ₱139.7M | 94% | High risk72 | —-0.032 |
| 22F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF QUINALE A RIVER FLOOD MITIGATION STRUCTURE(POLANGUI AND LIBON SECTION), ALBAY, PO | Region V | Region V | Completed | ₱192.7M | 100% | High risk71 | —-0.055 |
| 24FO0055ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S | Region V | Albay 3rd DEO | On-Going | ₱93.1M | 96% | High risk71 | —-0.041 |
| 23FO0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGOS RIVER, STA. CRUZ, LIB | Region V | Albay 3rd DEO | On-Going | ₱144.7M | 81% | High risk71 | —-0.021 |
| 24FO0100ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (FACING DOWNSTREAM ALONG RIVER | Region V | Albay 3rd DEO | Completed | ₱144.8M | 100% | High risk71 | —-0.066 |
| 22F00054OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAN JOSE AND BRGY. BA | Region V | Region V | Completed | ₱97.1M | 100% | High risk70 | —-0.077 |
| 24FB0148SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA, | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 81% | High risk70 | —-0.039 |
| 23FO0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CLUSTER XVIII-2023: (1) CONSTRUCTION OF AGOS RIVER CONTROL STRUCTURE, BARANGAY LOURDES, POLANGUI, ALBAY; (2) CONSTRUCTION OF AGOS | Region V | Albay 3rd DEO | Completed | ₱144.6M | 100% | High risk69 | —-0.065 |
| 22FO0100CLUSTER I: (1) CONSTRUCTION OF KALAKRAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY PISTOLA, OAS, ALBAY; (2) CONSTRUCTION OF NAGASGASAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY OBALIW RINAS, OAS, ALBAY | Region V | Albay 3rd DEO | Completed | ₱98M | 100% | High risk69 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22F00052OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BARIT RIVER FLOOD MITIGATION STRUCTURE(ANTIPOLO YOUNG SECTION),NABUA, CAMARINES SUR | Region V | Region V | Completed | ₱93.1M | 100% | High risk65 | —-0.077 |
| 27 | 22FO0055CLUSTER II-2022: 1.) CONSTRUCTION OF CATBURAWAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY CATBURAWAN, LIGAO CITY, ALBAY; 2.) REHABILITATION OF PANGANIRAN RIVER FLOOD MITIGATION STRUCTURE WITH ACCESS ROAD, BARANGAY LA MEDALLA, PIODURAN, ALBAY | Region V | Albay 3rd DEO | Completed | ₱93M | 100% | High risk65 | —-0.075 |
| 28 | 18F00066OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CADACAN RIVER, STO. DOMINGO SECTION, STA. 28+88 | Region V | Region V | Completed | ₱93.1M | 100% | High risk65 | —-0.072 |
| 29 | 21F00023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAGRADA AND BRGY. BA | Region V | Region V | Completed | ₱115.8M | 100% | High risk65 | —-0.073 |
| 30 | 21F00006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF WARAS RIVER FLOOD MITIGATION STRUCTURE, BRGY. SAGRADA AND BRGY. SAN | Region V | Region V | Completed | ₱106.1M | 100% | High risk64 | —-0.074 |
| 31 | 22F00101OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PAWILI RIVER FLOOD MITIGATION STRUCTURE, BRGY. CAUSIP AND BRGY. FABRICA, BULA, CAMA | Region V | Region V | Completed | ₱97.3M | 100% | High risk64 | —-0.076 |
| 32 | 22F00065OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BARIT RIVER FLOOD MITIGATION STRUCTURE (SAN JOSE SECTION),NABUA, CAMARINES SUR | Region V | Region V | Completed | ₱97.2M | 100% | High risk64 | —-0.077 |
| 33 | 21F00027OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF BARIT RIVER FLOOD MITIGATION STRUCTURES(SAN MIGUEL-SAN JOSE SECTION),N | Region V | Region V | Completed | ₱96.5M | 100% | High risk63 | —-0.077 |
| 34 | 20FO0081CONSTRUCTION OF MASARAWAG FLOOD CONTROL STRUCTURE, BRGY. MASARAWAG, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱57.3M | 73% | High risk62 | —-0.012 |
| 35 | 20FO0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF CABILOGAN RIVER CONTROL (BONGA SECTION), LIGAO CITY | Region V | Albay 3rd DEO | Completed | ₱84.8M | 100% | High risk62 | —-0.081 |
| 36 | 24F00303ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-OFF CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0499+230, K0499+381, LIGAO CITY, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱20.5M | 31% | High risk61 | —-0.052 |
| 37 | 20FO0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF TALONGOG-BUSAC FLOOD CONTROL, OAS, ALBAY | Region V | Albay 3rd DEO | Completed | ₱84.8M | 100% | Medium risk59 | —-0.080 |
| 38 | 20FO0086REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE, LEFT AND RIGHT FACING UPSTREAM OF BACOLOD BRIDGE, LIBON, ALBAY | Region V | Albay 3rd DEO | Completed | ₱77.2M | 100% | Medium risk59 | —-0.082 |
| 39 | 18F00053OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. AND IMPVT. OF FLOOD CONTROL DIKES IN POLANGUI, ALBAY FOR CRITICAL SECTIONS OF BARANGAYS KINALE, BALANGI | Region V | Region V | Completed | ₱69.4M | 100% | Medium risk59 | —-0.084 |
| 40 | 24F00307ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DAANG MAHARLIKA (LZ)-K0489+695, K0490+853, K0490+914, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱15.4M | 81% | Medium risk58 | —-0.068 |
| 41 | 19FO0078CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES OF MAGCASILI RIVER, BRGY. BALINAD, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱47.9M | 100% | Medium risk58 | —-0.088 |
| 42 | 24F00306ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - DAANG MAHARLIKA (LZ)-K0483+713, K0490+072, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱10.2M | 31% | Medium risk58 | —-0.052 |
| 43 | 22FO0030CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PANTAO, LIBON, ALBAY | Region V | Albay 3rd DEO | Completed | ₱76.7M | 100% | Medium risk58 | —-0.082 |
| 44 | 21FO0065CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE OF MAGCASILI RIVER, BARANGAY BALINAD, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱28.4M | 100% | Medium risk57 | —-0.085 |
| 45 | 21FO0109CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES ALONG MAGCASILI RIVER, BARANGAY BALINAD, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱38.2M | 100% | Medium risk57 | —-0.088 |
| 46 | 19FO0139CONSTRUCTION/IMPROVEMENT OF BAGUMBAYAN RIVER FLOOD CONTROL, BAGUMBAYAN, OAS, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱28.2M | 100% | Medium risk57 | —-0.021 |
| 47 | 20FO0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLANGUI RIVER, BALINAD-NAPO-PONSO-ALNAY SECTION, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱17.6M | 100% | Medium risk56 | —-0.089 |
| 48 | 19FO0099CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLANGUI RIVER, PUROK 7, ALNAY, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱18.6M | 100% | Medium risk56 | —-0.085 |
| 49 | 21FO0014CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURE ALONG POLANGUI RIVER BALINAD-NAPO-PONSO-ALNAY SECTION, BARANGAY ALNAY, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱19.8M | 100% | Medium risk56 | —-0.087 |
| 50 | 18FO0050REHABILITATION OF BORANGUIT RIVER FLOOD CONTROL, BRGY. KINALE, POLANGUI, ALBAY | Region V | Albay 3rd DEO | Completed | ₱28.2M | 100% | Medium risk55 | —-0.088 |