Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱5.6B
Average progress
89.1%
Completion rate
73.1%
Average risk score
50.6
Medium risk on average, out of 100
Flagged as unusual
13
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 142 | ₱5.4B | 50.6 | 13 | 89.1% |
| National Capital Region | 3 | ₱117.7M | 49.8 | 0 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 87 | ₱3.7B | 50.8 | 5 | 91.3% |
| Buildings and Facilities | 19 | ₱207.2M | 42.6 | 0 | 91.5% |
| Flood Control and Drainage | 17 | ₱802.2M | 52.5 | 3 | 85.3% |
| Bridges | 10 | ₱304.6M | 46.9 | 0 | 88.3% |
| Water Provision and Storage | 4 | ₱37.7M | 30.6 | 0 | 100.0% |
| OTHER | 3 | ₱264.5M | 81.4 | 2 | 67.9% |
| GAA 2025 SSP | 2 | ₱64M | 95.6 | 2 | 48.9% |
| Bridges, Roads | 2 | ₱58.4M | 48.4 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱105.1M | 94.5 | 1 | 2.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IH0068CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURES, BARANGAY SAN LORENZO, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.5M | 24% | High risk96 | Flagged0.025 |
| 25IH0030CONSTRUCTION/IMPROVEMENT OF OCAD-SIGAD ROAD, BRGY. OCAD, LAVEZARES NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.5M | 74% | High risk96 | Flagged0.012 |
| 25IH0039REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-ALLEN-CATARMAN RD- K0737+360 - K0738+523, CATARMAN & BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱105.1M | 3% | High risk95 | Flagged0.025 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 24IH0065CONSTRUCTION OF ROAD FROM LAVEZARES PORT TO NATIONAL HIGHWAY, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.4M | 28% | High risk77 | Flagged0.026 |
| 17I00030ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS)-TERTIARY ROADS,SAN ANTONIO CIRCUM. ROAD,KO020+710-KO022+760;KO022+920-KO023+805, SAN ANTONIO, N. SAMAR | Region VIII | Region VIII | Completed | ₱71.7M | 100% | High risk76 | —-0.034 |
| 24IH0106CONSTRUCTION OF RIVERBANK PROTECTION, CATARMAN-BOBON IRRIGATION PROJECT, BARANGAY TURA, BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 53% | High risk75 | Flagged0.056 |
| 24IH0112REHABILITATION OF FLOOD CONTROL, CARANGIAN CREEK, BARANGAY SOUTH - BARANGAY WEST, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 0% | High risk74 | Flagged0.064 |
| 25IH0043CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ROQUE, SAN ISIDRO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱9.9M | 30% | High risk68 | —-0.015 |
| 24IH0031CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOMOGE, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱139.9M | 97% | High risk66 | —-0.021 |
| 22I00041CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱158.7M | 90% | High risk65 | —-0.012 |
| 23I00022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TRIP) - ACCESS ROAD LEADING TO PINIPISAKAN FALLS, LAS NAVAS, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱152.5M | 94% | High risk65 | —-0.024 |
| 23I00094NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - LAPINIG RD - K0835+554 - K0836+060, K0836+160 - K0836+220, K0836+260 - K0837+750, K0838+000 - K0839+090, K0839+660 - K0839+800, K0839+965 - K0840+052.50, NORTHE | Region VIII | Region VIII | On-Going | ₱193M | 92% | High risk64 | —-0.015 |
| 25IH0092CONSTRUCTION OF CAG-ABACA - CULARIMA - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱98M | 0% | High risk63 | Flagged0.007 |
| 17IJ0104IMPROVEMENT/WIDENING OF CALBAYOG DIVERSION ROAD K0729+400-K0732+400, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱100.4M | 100% | High risk62 | —-0.047 |
| 25IH0081CONSTRUCTION OF SAN ISIDRO-LOPE DE VEGA ROAD, SAN ISIDRO AND LOPE DE VEGA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱73.1M | 18% | High risk61 | —-0.002 |
| 25IH0065REHABILITATION AND IMPROVEMENT OF CARANGIAN CREEK FLOOD CONTROL, SAN JOSE NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.1M | 0% | High risk61 | Flagged0.003 |
| 19IJ0065001: ENSURE SAFE AND RELIABLE ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE 1A, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱93.7M | 100% | High risk60 | —-0.083 |
| 19IJ0066001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE B, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱93.6M | 100% | High risk60 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IH0112REHABILITATION OF FLOOD CONTROL, CARANGIAN CREEK, BARANGAY SOUTH - BARANGAY WEST, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 0% | High risk74 | Flagged0.064 |
| 24IH0111CONSTRUCTION OF SEAWALL, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 76% | High risk91 | Flagged0.059 |
| 24IH0106CONSTRUCTION OF RIVERBANK PROTECTION, CATARMAN-BOBON IRRIGATION PROJECT, BARANGAY TURA, BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.5M | 53% | High risk75 | Flagged0.056 |
| 24IH0065CONSTRUCTION OF ROAD FROM LAVEZARES PORT TO NATIONAL HIGHWAY, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱96.4M | 28% | High risk77 | Flagged0.026 |
| 25IH0068CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURES, BARANGAY SAN LORENZO, SAN JOSE, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.5M | 24% | High risk96 | Flagged0.025 |
| 25IH0039REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-ALLEN-CATARMAN RD- K0737+360 - K0738+523, CATARMAN & BOBON, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱105.1M | 3% | High risk95 | Flagged0.025 |
| 23IH0133CONCRETING OF BRGY. SAN ISIDRO TO BRGY. SAN JUAN FMR, BRGY. SAN ISIDRO AND BRGY. SAN JUAN, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱29.8M | 74% | Medium risk52 | Flagged0.013 |
| 25IH0030CONSTRUCTION/IMPROVEMENT OF OCAD-SIGAD ROAD, BRGY. OCAD, LAVEZARES NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.5M | 74% | High risk96 | Flagged0.012 |
| 24IH0110CONCRETING OF BRGY. SAN MIGUEL TO MAWO RIVER FMR, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱18.9M | 46% | Medium risk52 | Flagged0.010 |
| 25IH0092CONSTRUCTION OF CAG-ABACA - CULARIMA - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱98M | 0% | High risk63 | Flagged0.007 |
| 23IH0113CONCRETING OF BRGY. LIGAYA TO BRGY. BUENAVISTA FMR, BRGY. LIGAYA AND BRGY. BUENAVISTA, ROSARIO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱11.9M | 96% | Medium risk46 | Flagged0.005 |
| 25IH0065REHABILITATION AND IMPROVEMENT OF CARANGIAN CREEK FLOOD CONTROL, SAN JOSE NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱39.1M | 0% | High risk61 | Flagged0.003 |
| 25IH0049CONCRETING OF BRGY. POLANGI - PATICUA FMR PHASE IV, BRGY. POLANGI AND BRGY. PATICUA, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.8M | 82% | Medium risk51 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23IH0160CONSTRUCTION OF MULTIPURPOSE FACILITY, BRGY. DALAKIT, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱49.5M | 15% | Medium risk58 | —-0.016 |
| 27 | 25IH0041CONSTRUCTION OF ROAD, BRGY. MAGSAYSAY, BOBON NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱19.6M | 1% | Medium risk58 | —-0.001 |
| 28 | 22I00055BRIDGE - WIDENING OF PERMANENT BRIDGES - MALUDBALUD BR. (B00238SM), ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱70.8M | 100% | Medium risk56 | —-0.048 |
| 29 | 20IJ0014001: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE C,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱88.5M | 100% | Medium risk55 | —-0.084 |
| 30 | 20IJ0013001: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,CALBAYOG CITY COASTAL ROAD, PACKAGE B,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱88.5M | 100% | Medium risk55 | —-0.084 |
| 31 | 20IJ0003001: DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) ,KO719+124 - KO720+964, KO720+990 - KO721+500 (INCLUDING RROW PAYMENT), SAMAR | Region VIII | Samar 1st DEO | Completed | ₱81.7M | 100% | Medium risk55 | —-0.079 |
| 32 | 23I00010ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CATARMAN - CALBAYOG RD. - K0774+081 - K0774+246, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱81.4M | 100% | Medium risk55 | —-0.086 |
| 33 | 18I00044REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CATARMAN - CALBAYOG ROAD, KO783+400 - KO783+550; KO784+100 - KO784+150, CATARMAN, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱69.7M | 100% | Medium risk55 | —-0.081 |
| 34 | 24OC0048BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MAGALLANES FLYOVER NB (PASAY-CUBAO)(B03220LZ) ALONG EPIFANIO DELOS SANTOS AVENUE (EDSA),MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱55.1M | 67% | Medium risk53 | —-0.022 |
| 35 | 25IH0085CONSTRUCTION OF BRGY. HAPPY VALLEY (SAN ISIDRO) - BRGY. CAGAMESARAG (LOPE DE VEGA) ROAD, SAN ISIDRO & LOPE DE VEGA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱47.5M | 16% | Medium risk53 | —-0.036 |
| 36 | 24IH0056CONSTRUCTION OF POLANGI TO MABINI ROAD PHASE IV, CATARMAN NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱48.9M | 90% | Medium risk53 | —-0.047 |
| 37 | 21IJ0112CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) - KO694+(-286) - KO694+(-160), KO695+150-KO695+310 | Region VIII | Samar 1st DEO | Completed | ₱48.7M | 100% | Medium risk53 | —-0.091 |
| 38 | 24IH0025PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN - LAOANG RD - K0759+000 - K0761+307 | Region VIII | Northern Samar 1st DEO | Completed | ₱50.4M | 100% | Medium risk52 | —-0.094 |
| 39 | 21IH0072REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSED AND LANDSLIDE - CATARMAN - CALBAYOG RD - K0753+879 - K0753+949, K0758+458 - K0758+510, K0766+000 - K0766+144, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱48M | 92% | Medium risk52 | —-0.025 |
| 40 | 21IH0090CONSTRUCTION/IMPROVEMENT OF CAG-ABACA - CULARIMA ROAD - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.092 |
| 41 | 21IH0084CONSTRUCTION/IMPROVEMENT OF ROAD/BRIDGE, BRGY. POLANGI - GEBULWANGAN - QUEZON - TRANGUE - MABINI ROAD, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.093 |
| 42 | 23IH0133CONCRETING OF BRGY. SAN ISIDRO TO BRGY. SAN JUAN FMR, BRGY. SAN ISIDRO AND BRGY. SAN JUAN, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱29.8M | 74% | Medium risk52 | Flagged0.013 |
| 43 | 24IH0040CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LIBAS PHASE IV, LAVEZARES, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.7M | 93% | Medium risk52 | —-0.047 |
| 44 | 19IJ0125001: SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT: ROAD WIDENING - SECONDARY ROAD,CALBAYOG - CATARMAN RD - K0785+(-261)-K0786 - 786+942, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.4M | 100% | Medium risk52 | —-0.089 |
| 45 | 23IH0018CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN JUAN, SAN ISIDRO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱9.9M | 100% | Medium risk52 | —-0.096 |
| 46 | 24IH0110CONCRETING OF BRGY. SAN MIGUEL TO MAWO RIVER FMR, VICTORIA, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱18.9M | 46% | Medium risk52 | Flagged0.010 |
| 47 | 23IH0129CONSTRUCTION OF MULTIPURPOSE BUILDING, BRGY. CAWAYAN, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱14.8M | 100% | Medium risk51 | —-0.049 |
| 48 | 23IH0100CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY WARD I, SAN ANTONIO, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | Completed | ₱14.7M | 100% | Medium risk51 | —-0.096 |
| 49 | 19IJ0094(RE-ADVERTISE) LOCAL PROGRAM: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. ARAPISON, STA. MARGA | Region VIII | Samar 1st DEO | Completed | ₱18.6M | 100% | Medium risk51 | —-0.096 |
| 50 | 25IH0049CONCRETING OF BRGY. POLANGI - PATICUA FMR PHASE IV, BRGY. POLANGI AND BRGY. PATICUA, CATARMAN, NORTHERN SAMAR | Region VIII | Northern Samar 1st DEO | On-Going | ₱24.8M | 82% | Medium risk51 | Flagged0.000 |