Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱11.9B
Average progress
94.0%
Completion rate
87.9%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
8
5.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 47 | ₱3.5B | 55.2 | 0 | 98.1% |
| Cordillera Administrative Region | 30 | ₱2.6B | 56.5 | 0 | 100.0% |
| Region I | 23 | ₱1.9B | 54.2 | 1 | 100.0% |
| Region IV-B | 12 | ₱1.1B | 57.3 | 1 | 68.4% |
| Region XIII | 12 | ₱950.7M | 45.4 | 0 | 100.0% |
| Region III | 10 | ₱991.6M | 69.1 | 3 | 86.3% |
| Region XI | 4 | ₱612.5M | 56.9 | 1 | 77.4% |
| Negros Island Region | 2 | ₱285M | 95.8 | 2 | 28.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 108 | ₱9.3B | 53.8 | 2 | 96.6% |
| Flood Control and Drainage | 20 | ₱1.5B | 54.0 | 0 | 95.1% |
| GAA 2025 SSP | 4 | ₱573.1M | 95.6 | 4 | 54.7% |
| GAA 2025 OO-2 | 2 | ₱95.1M | 88.8 | 1 | 31.7% |
| Buildings and Facilities | 2 | ₱39.1M | 72.3 | 0 | 100.0% |
| Bridges | 2 | ₱191.1M | 63.9 | 0 | 86.0% |
| OTHER | 1 | ₱94.6M | 89.0 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱96.5M | 65.3 | 0 | 65.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HK0019SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0046+000 - K0057+800 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 19% | High risk96 | Flagged0.047 |
| 25HK0018SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 37% | High risk96 | Flagged0.038 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25CF0128SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG JOSE ABAD SANTOS AVENUE (JASA) S00967LZ, CABIAO - SAN ISIDRO SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 81% | High risk95 | Flagged0.018 |
| 25ED0027CONSTRUCTION OF SEAWALL STRUCTURE, VILLA ANTONIO, BARANGAY NAVOTAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱66.5M | 11% | High risk91 | Flagged0.007 |
| 24A00657CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, BARANGAY EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Region I | On-Going | ₱94.6M | 100% | High risk89 | Flagged0.051 |
| 25ED0018CONSTRUCTION OF SEAWALL STRUCTURE, BARANGAY PACHOCA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱28.6M | 52% | High risk86 | —-0.005 |
| 25C00484ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱141.9M | 0% | High risk74 | Flagged0.004 |
| 24C00001ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱145.7M | 100% | High risk74 | —-0.022 |
| 24CL0093CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY FERIA, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.6M | 100% | High risk72 | —-0.064 |
| 24CL0083CONSTRUCTION OF PUBLIC COVERED COURT INCLUDING GROUND IMPROVEMENTS, BRGY. FERIA, PHASE 2 SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱19.5M | 100% | High risk72 | —-0.064 |
| 25D00009CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE V, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱140.7M | 74% | High risk68 | —-0.026 |
| 22PA0142SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES, CONSTRUCTION OF COLABAOAN FLOOD CONTROL, MALANAS RIVER, BARANGAY COLABAOAN, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | High risk67 | —-0.034 |
| 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 24DK0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE O | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 65% | High risk65 | —-0.031 |
| 22PA0311SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DOLORES-CARDONA BRIDGE AND APPROACHES, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.034 |
| 25L00114CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱185.7M | 9% | High risk64 | Flagged0.007 |
| 22PA0141SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, CULLIONG, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.052 |
| 22PA0131SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF MALANAS FLOOD CONTROL STRUCTURE, GUIMBA AND DAOIDAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.053 |
| 24DK0034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PAGBILAO - TAYABAS - LUCBAN DIVERSION RD, QUEZON (TAYABAS SIDE) - PACKAGE L | Region IV-A | Quezon 1st DEO | On-Going | ₱96.5M | 72% | High risk63 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00657CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, BARANGAY EMBARCADERO TO BARANGAY OSIEM, MANGALDAN, PANGASINAN | Region I | Region I | On-Going | ₱94.6M | 100% | High risk89 | Flagged0.051 |
| 25HK0019SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0046+000 - K0057+800 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 19% | High risk96 | Flagged0.047 |
| 25HK0018SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG STA. CATALINA - PAMPLONA - TANJAY CITY - K0034+000 - K0046+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱142.5M | 37% | High risk96 | Flagged0.038 |
| 25CF0128SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG JOSE ABAD SANTOS AVENUE (JASA) S00967LZ, CABIAO - SAN ISIDRO SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 81% | High risk95 | Flagged0.018 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25ED0027CONSTRUCTION OF SEAWALL STRUCTURE, VILLA ANTONIO, BARANGAY NAVOTAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱66.5M | 11% | High risk91 | Flagged0.007 |
| 25L00114CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱185.7M | 9% | High risk64 | Flagged0.007 |
| 25C00484ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱141.9M | 0% | High risk74 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23DJ0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD-K0149+388-K0149+448, K0149+480-K0149+630,K0149+655-K0149 | Region IV-A | Quezon 2nd DEO | Completed | ₱93.2M | 100% | High risk61 | —-0.094 |
| 27 | 23DJ0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG SN JUAN-CANDELARIA-BOLBOC RD-K0147+760-K0147+840, K0147+860 - K0148+220, K0149+180-K0149+340, BARANG | Region IV-A | Quezon 2nd DEO | Completed | ₱96.1M | 100% | High risk61 | —-0.094 |
| 28 | 22E00093REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+318-STA. 9+495; STA. 9+864-STA. 10+055, PALAWAN | Region IV-B | Region IV-B | Completed | ₱208.5M | 100% | High risk61 | —-0.039 |
| 29 | 22E00094REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+617-STA. 9+813; STA. 8+266-STA. 8+400, PALAWAN | Region IV-B | Region IV-B | Completed | ₱152.9M | 100% | High risk60 | —-0.053 |
| 30 | 22DK0118ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0096+900 - K0097+100 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 31 | 23DJ0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES - QUEZON-BATANGAS RD- K0100+214-K0100+984 | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.094 |
| 32 | 23DJ0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES- QUEZON-BATANGAS RD. - K0099+163-K0099+540, K0099+819-K0100+214 | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.094 |
| 33 | 23DJ0043CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES - CANDELARIA BYPASS RD-K0106+361-K0106+704, K0106+720-K0106+762 | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 34 | 23DJ0042CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES - CANDELARIA BYPASS RD K0106+762-K0106+812, K0106+866-K0107+201, | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 35 | 22DK0116REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MAUBAN - TIGNOAN RD, MAUBAN SIDE - K0167+318 - K0167+410 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 36 | 19P00019LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - REHABILITATION / IMPROVEMENT WITH SLIP, SOIL COLLAPSE AND LANDSLIDES ALONG ABRA - KALINGA ROAD, KO457+320 - KO457+794 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱95.5M | 100% | Medium risk59 | —-0.072 |
| 37 | 23P00021ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BENGUET NUEVA VIZCAYA RD, K0275+324 - K0275+505 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.051 |
| 38 | 19P00018LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - REHABILITATION / IMPROVEMENT WITH SLIP, SOIL COLLAPSE AND LANDSLIDES ALONG ABRA - KALINGA ROAD, KO457+000 - KO457+320 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱97M | 100% | Medium risk58 | —-0.072 |
| 39 | 22PA0136REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0451+450-K0451+600 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 40 | 22PA0135REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0451+000-K0451+150 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 41 | 22PA0134REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0450+700-K0450+810 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 42 | 22PA0132REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0449+100-K0449+250 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 43 | 22PA0139REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0456+100-K0456+200 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 44 | 22PA0137REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0454+700-K0454+820 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 45 | 22PA0138REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0455+280-K0455+400 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 46 | 21P00074CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - ASPHALT OVERLAY (INSTAPAVE) ALONG ASIN (KM 8) - NANGALISAN-SN PASCUAL, TUBA, BENGUET-LA UNION | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk57 | —-0.047 |
| 47 | 22PA0003REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD-K0433+524-K0433+663 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.069 |
| 48 | 22PA0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD-K0431+600-K0431+700 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.069 |
| 49 | 23A00320SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) CALASIAO OLD RD- K0204+000-K0204+725, K0204+741-K0205+000, K0205+000-K0205+108, K0205+120-K0206+000, K0206+000-K0207+000, K0207+000-K0207 | Region I | Region I | Completed | ₱193M | 100% | Medium risk56 | —-0.054 |
| 50 | 23P00029ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAGUIO - BONTOC ROAD, K0301+655 - K0301+750 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.077 |