Contractor dossier
96 projects on file, including joint ventures this contractor is part of.
Total projects
96
Total budget
₱4.4B
Average progress
83.7%
Completion rate
59.4%
Below 70%
Average risk score
55.3
Medium risk on average, out of 100
Flagged as unusual
16
16.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 56 | ₱2.4B | 50.6 | 5 | 88.0% |
| Region I | 16 | ₱845.9M | 72.2 | 8 | 68.9% |
| Region VIII | 13 | ₱301.1M | 52.5 | 1 | 88.6% |
| Region III | 5 | ₱595.5M | 63.8 | 1 | 55.9% |
| Region IV-B | 4 | ₱187.2M | 45.2 | 0 | 100.0% |
| Region IV-A | 2 | ₱166.4M | 67.1 | 1 | 87.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 41 | ₱2.1B | 52.5 | 3 | 93.8% |
| Roads | 25 | ₱585.3M | 44.6 | 0 | 87.2% |
| Buildings and Facilities | 19 | ₱833.2M | 60.6 | 6 | 64.6% |
| OTHER | 4 | ₱296.6M | 69.5 | 4 | 67.8% |
| GAA 2025 OO-2 | 3 | ₱327.5M | 91.4 | 1 | 76.0% |
| Bridges | 2 | ₱191M | 71.1 | 0 | 88.5% |
| GAA 2025 SSP | 1 | ₱18.9M | 95.7 | 1 | 75.7% |
| GAA 2025 OO-1 | 1 | ₱48.9M | 94.8 | 1 | 29.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF CONCRETE BRIDGE, SITIO BATO, BARANGAY 34, ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱18.9M | 76% | High risk96 | Flagged0.028 |
| 25IA0029NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1109+364-K1110+542 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 29% | High risk95 | Flagged0.008 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 25OA0021CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 3, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 75% | High risk91 | —-0.010 |
| 25OA0022CONSTRUCTION OF DAMPALIT PUMPING STATION, PHASE 4, BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱93.6M | 83% | High risk91 | —-0.011 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 24C00300FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 79% | High risk80 | Flagged0.001 |
| 24C00299FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 81% | High risk80 | —-0.000 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 23AA0400CONSTRUCTION OF MULTI PURPOSE BUILDING (GUESTHOUSE WITH FITNESS GYM AND CONFERENCE HALL), CAMP VALENTINE, BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.2M | 86% | High risk72 | —-0.025 |
| 24AA0152SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE CONNECTING BARANGAY ALSEM AND BARANGAY DIPILAT, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱94.5M | 77% | High risk72 | —-0.001 |
| 24AA0391BIP - MULTIPURPOSEBUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES:CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM),MMSU LAB. HIGH, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24.7M | 64% | High risk72 | —-0.027 |
| 23AA0465CONSTRUCTION OF DEPARTMENT OF INFORMATION AND COMMUNICATION TECHNOLOGY-REGION 1, ILOCOS NORTE PROVINCIAL OFFICE BUILDING, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱21.6M | 100% | High risk71 | —-0.033 |
| 23AA0363CONSTRUCTION OF MULTI-PURPOSE BUILDING (GRANDSTAND) BARANGAY 23, CAMP VALENTINE, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱9.8M | 100% | High risk71 | —-0.081 |
| 23A00287SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BRIDGE, BARANGAY DAGUPAN, VINTAR, ILOCOS NORTE | Region I | Region I | Completed | ₱96.5M | 100% | High risk71 | —-0.023 |
| 24AA0126CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, BARANGAY CAVIT, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱49M | 100% | High risk70 | —-0.065 |
| 23OA0072CONSTRUCTION OF PUMPING STATION IN BRGY. MUSON(PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 97% | High risk68 | Flagged0.009 |
| 25AA0573CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (DPWH BUILDING), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 26% | High risk67 | Flagged0.001 |
| 24AA0469CONSTRUCTIONOF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MARIANOMARCOS LABORATORY ELEMENTARY SCHOOL, BARANGAY 5,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱35.1M | 34% | High risk67 | Flagged0.029 |
| 25AA0166FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUCTURE ALONG LAOAG RIVER BASIN AND TRIBUTARIES, UPSTREAM OF CAVIT BRIDGE, BARANGAY CAVIT, LAOAG CITY, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱47.1M | 81% | High risk66 | —-0.005 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00608DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - GOVERNOR ROQUE B. ABLAN SR. MEMORIAL HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱48.8M | 0% | Medium risk57 | Flagged0.056 |
| 23A00293CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT WITH GABION FOOTING PROTECTION ALONG PASUQUIN RIVER REVETMENT, BARANGAY SULVEC, PASUQUIN, ILOCOS | Region I | Region I | On-Going | ₱96.5M | 88% | High risk82 | Flagged0.031 |
| 19O00062REPAIR AND RENOVATION OF ONE (1) FIVE (5) STOREY BUILDING WITH MEZZANINE, DICT COMPOUND, A. ROCES AVENUE, QUEZON CITY, | National Capital Region | National Capital Region | On-Going | ₱111.4M | 98% | High risk63 | Flagged0.029 |
| 24AA0469CONSTRUCTIONOF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MARIANOMARCOS LABORATORY ELEMENTARY SCHOOL, BARANGAY 5,LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱35.1M | 34% | High risk67 | Flagged0.029 |
| 25A00109SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF CONCRETE BRIDGE, SITIO BATO, BARANGAY 34, ISIC-ISIC, VINTAR, ILOCOS NORTE | Region I | Region I | On-Going | ₱18.9M | 76% | High risk96 | Flagged0.028 |
| 25AA0034FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱140.4M | 70% | High risk92 | Flagged0.022 |
| 24OA0066CONSTRUCTION OF DRAINAGE SYSTEM ALONG C-4 ROAD, MALABON CITY, PHASE II | National Capital Region | Malabon-Navotas DEO | On-Going | ₱9.5M | 11% | Medium risk52 | Flagged0.018 |
| 23D00062CONSTRUCTION OF TAYTAY SPORTS COMPLEX, TAYTAY, RIZAL (PHASE 4) | Region IV-A | Region IV-A | On-Going | ₱94.1M | 75% | High risk76 | Flagged0.012 |
| 23OA0072CONSTRUCTION OF PUMPING STATION IN BRGY. MUSON(PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱96.5M | 97% | High risk68 | Flagged0.009 |
| 24OA0099CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY (PHASE 2) | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 85% | Medium risk57 | Flagged0.008 |
| 25IA0029NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1109+364-K1110+542 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 29% | High risk95 | Flagged0.008 |
| 24OA0098CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 91% | Medium risk56 | Flagged0.007 |
| 23AA0517CONSTRUCTION OF MULTI-PURPOSE BUILDING (CAMP VALENTINE), BRGY. 23, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.5M | 98% | High risk65 | Flagged0.006 |
| 25A00522BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, UNIVERSITY GRANDSTAND, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | Region I | On-Going | ₱91.2M | 3% | High risk64 | Flagged0.004 |
| 24C00300FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER (RIGHT SIDE), MEYCAUAYAN CITY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱170.2M | 79% | High risk80 | Flagged0.001 |
| 25AA0573CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI PURPOSE BUILDING (DPWH BUILDING), PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱24M | 26% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24OA0064CONSTRUCTION OF PUMPING STATION, BATASAN RIVER, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 27 | 19O00062REPAIR AND RENOVATION OF ONE (1) FIVE (5) STOREY BUILDING WITH MEZZANINE, DICT COMPOUND, A. ROCES AVENUE, QUEZON CITY, | National Capital Region | National Capital Region | On-Going | ₱111.4M | 98% | High risk63 | Flagged0.029 |
| 28 | 21ED0164CONSTRUCTION OF CALAPAN CITY RIVER CONTROL, IBABA WEST TO LUMANGBAYAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱94.1M | 100% | Medium risk59 | —-0.060 |
| 29 | 22DN0113CONSTRUCTION OF TAYTAY SPORTS COMPLEX TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱72.4M | 100% | Medium risk59 | —-0.091 |
| 30 | 23OA0066CONSTRUCTION OF MULTI-PURPOSE BUILDING, CONCEPCION PLAZA, BARANGAY CONCEPCION, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱75.6M | 0% | Medium risk59 | —-0.011 |
| 31 | 24A00608DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - GOVERNOR ROQUE B. ABLAN SR. MEMORIAL HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱48.8M | 0% | Medium risk57 | Flagged0.056 |
| 32 | 24OA0099CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY (PHASE 2) | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 85% | Medium risk57 | Flagged0.008 |
| 33 | 24OA0098CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TULLAHAN RIVER, BARANGAY MAYSILO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱48.2M | 91% | Medium risk56 | Flagged0.007 |
| 34 | 23OA0088CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POTRERO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49.5M | 100% | Medium risk55 | —-0.090 |
| 35 | 24IA0112REHABILITATION OF ROAD, CAUCAB-PALAYAN ROAD, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱48.1M | 63% | Medium risk54 | —-0.042 |
| 36 | 24IA0054NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD- K1084+914-K1086+112 | Region VIII | Biliran DEO | On-Going | ₱48.2M | 77% | Medium risk53 | —-0.043 |
| 37 | 23IA0073NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1112+085-K1113+600, K1114+798-K1116+031 | Region VIII | Biliran DEO | On-Going | ₱49M | 82% | Medium risk53 | —-0.039 |
| 38 | 22OA0032CONSTRUCTION OF RIVERWALL ALONG MALABON-TULLAHAN RIVER (PHASE 2), BRGY. POTRERO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.085 |
| 39 | 19OA0120CONSTRUCTION OF FOUR(4) STOREY SIXTEEN(16) CL.RM. SCHOOL BLDG. PANGHULO NHS, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱72.1M | 100% | Medium risk53 | —-0.026 |
| 40 | 23OA0067CONSTRUCTION OF BOX CULVERT ALONG SIOSON ROAD, BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱69.3M | 80% | Medium risk53 | —-0.030 |
| 41 | 23OA0052CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANZA RIVER AND MALABON-NAVOTAS RIVER, MALABON CITY (PHASE 4) | National Capital Region | Malabon-Navotas DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.080 |
| 42 | 24OA0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MUZON AND DAMPALIT RIVER (PHASE 7), MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱59.4M | 100% | Medium risk53 | —-0.085 |
| 43 | 25OA0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANZA RIVER AND MALABON-NAVOTAS RIVER, MALABON CITY (PHASE 6) | National Capital Region | Malabon-Navotas DEO | On-Going | ₱58M | 85% | Medium risk53 | —-0.049 |
| 44 | 21OA0044CONST. OF 3 PS SACRISTIA ST., LUNA ST, PAEZ ST BRGY. SAN AGUSTIN, CONCEPCION MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱57.5M | 100% | Medium risk53 | —-0.086 |
| 45 | 23OA0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, (PHASE 2), BRGY. SANTULAN, MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱29.7M | 9% | Medium risk53 | —-0.016 |
| 46 | 21OA0065CONSTRUCTION OF MULTI-PURPOSE BLDG. CITY OF MALABON UNIVERSITY (CMU) BRGY. LONGOS, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱40.2M | 100% | Medium risk52 | —-0.098 |
| 47 | 25CJ0248CONSTRUCTION OF CRUZ - CALIBUNGAN DIVERSION ROAD (SEGMENT 7), VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.2M | 17% | Medium risk52 | —-0.039 |
| 48 | 24OA0066CONSTRUCTION OF DRAINAGE SYSTEM ALONG C-4 ROAD, MALABON CITY, PHASE II | National Capital Region | Malabon-Navotas DEO | On-Going | ₱9.5M | 11% | Medium risk52 | Flagged0.018 |
| 49 | 22OA0040CONSTRUCTION OF RIVERWALL AND ROAD DIKE ALONG BATASAN RIVER (PHASE 22), BRGY. DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.084 |
| 50 | 22OA0085CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. LONGOS, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱31.7M | 100% | Medium risk52 | —-0.097 |