Contractor dossier
63 projects on file, including joint ventures this contractor is part of.
Total projects
63
Total budget
₱4B
Average progress
90.0%
Completion rate
74.6%
Average risk score
50.1
Medium risk on average, out of 100
Flagged as unusual
9
14.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 54 | ₱3.5B | 49.0 | 8 | 89.3% |
| Region VII | 6 | ₱384.9M | 60.9 | 1 | 91.6% |
| Region X | 3 | ₱128.6M | 47.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 34 | ₱1.8B | 44.7 | 3 | 88.2% |
| Flood Control and Drainage | 14 | ₱1.1B | 48.2 | 1 | 99.6% |
| Bridges | 4 | ₱367.3M | 52.9 | 0 | 96.8% |
| GAA 2025 SSP | 3 | ₱84.1M | 94.5 | 2 | 50.2% |
| Buildings and Facilities | 3 | ₱33.7M | 20.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱197.2M | 94.2 | 2 | 71.9% |
| OTHER | 2 | ₱304.8M | 84.4 | 1 | 97.4% |
| Bridges, Roads | 1 | ₱81.2M | 48.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00205INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY (LIPATA-SURIGAO SECT)-K1116+320-K1120+550 | Region XIII | Region XIII | On-Going | ₱64M | 4% | High risk95 | Flagged0.033 |
| 25NG0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱9.9M | 46% | High risk95 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25N00007MAHARLIKA HIGHWAY (SURIGAO- AGUSAN SECT)- K1151+360 - K1152+012.20 - K1152+298 - K1153+461.8, K1153+728 - K1155+683, K1155+711 - K1155+765.8, K1155+861 - K1156+128 | Region XIII | Region XIII | On-Going | ₱125.8M | 94% | High risk94 | Flagged0.008 |
| 25N00009PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1147+093 - K1147+590 | Region XIII | Region XIII | Completed | ₱10.2M | 100% | High risk93 | —-0.021 |
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 21N00009ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱112.1M | 100% | High risk78 | —-0.018 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 22H00003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, CEBU PROVINCE | Region VII | Region VII | Completed | ₱144.7M | 100% | High risk65 | —-0.033 |
| 23HO0026ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LUWAK - SITIO PARALE, BRGY. SALM | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 25N00205INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY (LIPATA-SURIGAO SECT)-K1116+320-K1120+550 | Region XIII | Region XIII | On-Going | ₱64M | 4% | High risk95 | Flagged0.033 |
| 23NG0099ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) - K1126+982.75 - K1127+903.08, BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.4M | 0% | Medium risk57 | Flagged0.032 |
| 23NG0102PREVENTIVE MAINTENANCE SECONDARY ROADS SURIGAO - DAVAO COASTAL ROAD/SURIGAO-DAVAO COASTAL ROAD, K1150+300 - K1152+000.00 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱68.8M | 0% | Medium risk51 | Flagged0.029 |
| 25NG0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱9.9M | 46% | High risk95 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25N00007MAHARLIKA HIGHWAY (SURIGAO- AGUSAN SECT)- K1151+360 - K1152+012.20 - K1152+298 - K1153+461.8, K1153+728 - K1155+683, K1155+711 - K1155+765.8, K1155+861 - K1156+128 | Region XIII | Region XIII | On-Going | ₱125.8M | 94% | High risk94 | Flagged0.008 |
| 24NG0066CONCRETING OF SITIO LAPAZ, BRGY. SERNA TO BRGY. POCTOY FMR, BRGY. SERNA AND BRGY.POCTOY / BRGY. SERNA - BRGY.POCTOY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱14.9M | 82% | Medium risk42 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17NF0004NETWORK DEV'T. - IMPV'T./WIDENING OF NATIONAL ROADS-N1 DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION)/ BRGY. QUEZON - BRGY. TRINIDAD, SURIGAO CITY, K1128+737 - K1130+840; K1130+869 - K1131+500 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱43M | 100% | Medium risk50 | —-0.056 |
| 27 | 17NF0003IMPROVEMENT/WIDENING OF NATIONAL ROADS - N1 OF DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION FROM K1137+300 TO K1139+330), SISON, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱43.1M | 100% | Medium risk49 | —-0.055 |
| 28 | 23NG0092PREVENTIVE MAINTENANCE PRIMARY ROADS DAANG MAHARLIKA (SURIGA-AGUSAN SECTION)/ DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), K1143+853 - K1146+000, K1161+730 - K1162+084.72, K1163+629 - K1163+660 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱65.6M | 100% | Medium risk49 | —-0.030 |
| 29 | 18NF0072CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CIRCUMFERENTIAL ROAD LEADING TO LAKE MAINIT, INCLUDING BRIDGE/BRGY. MATIN-AO, MAINIT, SURIGAO DEL NORTE, STA.0+033.10 - STA.0+709.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱81.2M | 100% | Medium risk48 | —-0.066 |
| 30 | 22NE0054REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT TO LORETO ROAD - K0027+100 - K0027+850, BASILISA, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱96.4M | 100% | Medium risk47 | —-0.073 |
| 31 | 22NG0116PREVENTIVE MAINTENANCE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION)/BRGY. LUNA, SURIGAO CITY, K1125+000 - K1126+954.10 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱57.7M | 100% | Medium risk46 | —-0.085 |
| 32 | 19NG0044PREVENTIVE MAINTENANCE SECONDARY ROADS ASPHALT OVERLAY (50MM. THK)/ALONG SURIGAO WHARF ROAD, (K1123+(-810) - K1123+466), BRGY. WASHINGTON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱70.3M | 100% | Medium risk46 | —-0.084 |
| 33 | 23NG0006NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, SURIGAO-DAVAO COASTAL ROAD - K1172+000 - K1174+305/GIGAQUIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk46 | —-0.078 |
| 34 | 20KC0054CONSTRUCTION OF TALAKAG BY-PASS ROAD, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱40.4M | 100% | Medium risk46 | —-0.093 |
| 35 | 20KC0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN ROAD, K1501+260-K1502+387, K1502+548, K1502+600, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱30.5M | 100% | Medium risk46 | —-0.093 |
| 36 | 23NE0052ROAD WIDENING ALONG DINAGAT - LORETO ROAD K0056+000-K0058+240, LIBJO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱87.6M | 100% | Medium risk46 | —-0.083 |
| 37 | 24HN0076CSSP: BASIC INFRASTRUTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITY AT BARANGAY CATARMAN, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱5.4M | 100% | Medium risk45 | —-0.098 |
| 38 | 23NG0001NETWORK DEVELOPMENT PROGRAM - OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, JCT. CAPALAYAN-COBONGBONGAN RD K1139+000 - K1141+487, BRGY. CAPALAYAN-NABAGO-CABONGBONGAN, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱53.1M | 100% | Medium risk44 | —-0.088 |
| 39 | 18NF0082NETWORK DEVELOPMENT: ROAD WIDENING OF PRIMARY NATIONAL ROAD DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION),K1162+084.72-K1162+180.00;1162+400.00-K1163+080.00;K1163+080.00-K1163+136.09;K1163+165.91-K1163+200.00;K1163+200.00-K1163+270.00;K1163+270.00-K1163+303.09 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱84.8M | 100% | Medium risk44 | —-0.082 |
| 40 | 25NE0047CONSTRUCTION OF COASTAL ROAD FROM BARANGAY SAN JUAN TO BARANGAY CARMEN, LORETO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | On-Going | ₱48.4M | 80% | Medium risk44 | —-0.057 |
| 41 | 24NG0047CONSTRUCTION OF RIVERBANK PROTECTION ALONG SURIGAO RIVER, TOGBONGON SECTION, PHASE 2, SURIGAO CITY, SURIGAO DEL NORTE / BRGY. TOGBONGON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱57.9M | 100% | Medium risk44 | —-0.071 |
| 42 | 24HC0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD OF PUROK 3 AND 5, BARANGAY BONGBONG, TRINIDAD, B | Region VII | Bohol 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.095 |
| 43 | 24NG0052CONSTRUCTION OF RIVERBANK PROTECTION ALONG SURIGAO RIVER, TRINIDAD SECTION, PHASE 2, SURIGAO CITY, SURIGAO DEL NORTE/BARANGAY TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱57.9M | 100% | Medium risk43 | —-0.070 |
| 44 | 24NG0053BRIDGE-WIDENING OF PERMANENT BRIDGES, MAHANUB BR. (B00986MN) ALONG SURIGAO-DAVAO COASTAL ROAD/GIGAQUIT, SURIGAO DEL NORTE STA. 1171+846.00 - K1171+875 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱35.1M | 93% | Medium risk42 | —-0.018 |
| 45 | 24NG0066CONCRETING OF SITIO LAPAZ, BRGY. SERNA TO BRGY. POCTOY FMR, BRGY. SERNA AND BRGY.POCTOY / BRGY. SERNA - BRGY.POCTOY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱14.9M | 82% | Medium risk42 | Flagged0.000 |
| 46 | 19NG0029CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - DAANG MAHARLIKA (LIPATA-SURIGAO SECTION) / SURIGAO CITY, SURIGAO DEL NORTE, K1114+477 - K1114+505, K1114+517 - K1116+000 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱15.3M | 100% | Medium risk41 | —-0.090 |
| 47 | 19NG0030CONSTRUCTION/UPGRADING REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - DAANG MAHARLIKA (LIPATA-SURIGAO SECTION) & (SURIGAO-AGUSAN SECTION) / SURIGAO CITY, SURIGAO DEL NORTE, K1123+(-306) - K1123+380, K1124+180 - K1124+410 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱14.9M | 100% | Medium risk41 | —-0.089 |
| 48 | 24NG0020PREVENTIVE MAINTENANCE SECONDARY ROADS SURIGAO-DAVAO COASTAL ROAD / SURIGAO - DAVAO COASTAL ROAD K1147+(-685) - K1147+191 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱25.9M | 100% | Medium risk40 | —-0.087 |
| 49 | 25NG0007ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SURIGAO - DAVAO COASTAL ROAD - K1197+000 - K1198+000, K1199+810 - K1201+010.45/BRGY. CAGDIANAO, CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱44.1M | 100% | Medium risk39 | —-0.056 |
| 50 | 19NG0003CONSTRUCTION OF RIVERBANK IN PAYASA RIVER / BRGY. MATIN-AO, MAINIT, SURIGAO DEL NORTE STA.0+060.00 - K0+162.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk39 | —-0.067 |