Contractor dossier
47 projects on file, including joint ventures this contractor is part of.
Total projects
47
Total budget
₱1.1B
Average progress
90.1%
Completion rate
66.0%
Below 70%
Average risk score
49.1
Medium risk on average, out of 100
Flagged as unusual
3
6.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 47 | ₱1.1B | 49.1 | 3 | 90.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 27 | ₱658M | 43.3 | 0 | 91.6% |
| Buildings and Facilities | 6 | ₱79.9M | 49.0 | 0 | 100.0% |
| Bridges | 4 | ₱165.6M | 51.3 | 1 | 75.0% |
| Water Provision and Storage | 4 | ₱38.9M | 47.2 | 0 | 100.0% |
| OTHER | 2 | ₱29.8M | 78.5 | 2 | 100.0% |
| Flood Control and Drainage | 2 | ₱55M | 57.2 | 0 | 44.8% |
| GAA 2025 OO-1 | 1 | ₱22.8M | 92.4 | 0 | 92.8% |
| GAA 2025 OO-2 | 1 | ₱38.1M | 88.0 | 0 | 80.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0004REHAB/RECONST OF RDS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TAG.-TAAL LAKE RD.-K0063+205 - K0063+ | Region IV-A | Cavite 2nd DEO | On-Going | ₱22.8M | 93% | High risk92 | —-0.015 |
| 25DG0025CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MARAGONDON RIVER, PHASE I, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱38.1M | 80% | High risk88 | —-0.027 |
| 24DG0111CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 24DG0110CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 25DG0021REHAB./RECONST. OF RDS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -TERNATE-NASUGBU RD - K0068+762-K00 | Region IV-A | Cavite 2nd DEO | On-Going | ₱93.6M | 61% | High risk73 | —-0.026 |
| 25DG0016CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MABACAO BR., PHASE I, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.6M | 0% | High risk68 | —-0.000 |
| 25D00121CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), MAGALLANES-GEN. AGUINALDO SECTION, PACKAGE 6, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.9M | 0% | High risk64 | Flagged0.001 |
| 24D00017FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS/ NEW ROADSTAGAYTAY-CALAMBA ROAD VIA CANLUBANG, CAVITE | Region IV-A | Region IV-A | On-Going | ₱94.1M | 100% | High risk61 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DG0111CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 24DG0110CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 25D00121CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), MAGALLANES-GEN. AGUINALDO SECTION, PACKAGE 6, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.9M | 0% | High risk64 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24DG0078CONST OF ROAD SLOPE PROTECTION STRUCTURE-TAG-TAAL LAKE ROAD (S01907LZ) K0063+799-K0063+840 | Region IV-A | Cavite 2nd DEO | On-Going | ₱16.4M | 97% | Medium risk47 | —-0.074 |
| 27 | 24DG0030CONST OF ROAD SLOPE PROTECTION STRUCTURE-TAG-TAAL LAKE ROAD K0058+356-K0058+400 | Region IV-A | Cavite 2nd DEO | Completed | ₱27.4M | 100% | Medium risk47 | —-0.109 |
| 28 | 24DG0034CONST OF ROAD SLOPE PROTECTION STRUCTURE-TAG-TAAL LAKE ROAD-K0058+036-K0058+099 | Region IV-A | Cavite 2nd DEO | Completed | ₱23M | 100% | Medium risk47 | —-0.109 |
| 29 | 24DG0031CONST OF ROAD SLOPE PROTECTION STRUCTURE-TAG-TAAL LAKE RD K0059+900-K0059+943 | Region IV-A | Cavite 2nd DEO | Completed | ₱15.4M | 100% | Medium risk46 | —-0.109 |
| 30 | 24DG0019RECONST TO CONC PAVEMENT-MAR-MAG-AMUYONG RD-K0069+000-K0069+597 | Region IV-A | Cavite 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.108 |
| 31 | 25DG0010RD. WIDENING - MARAGONDON-MAGALLANES-AMUYONG RD -K0083+000-K0083+466 | Region IV-A | Cavite 2nd DEO | On-Going | ₱26.6M | 56% | Medium risk46 | —-0.061 |
| 32 | 23DG0002REHAB OF PAVED ROAD MAR-MAG-AMUYONG RD-K0081+960-K0083+000 | Region IV-A | Cavite 2nd DEO | Completed | ₱18.7M | 100% | Medium risk46 | —-0.109 |
| 33 | 23DG0004CONST OF ROAD SLOPE PROTECTION STRUCTURE-TERNATE-NASUGBU RD-K0070+600-K0070+641 | Region IV-A | Cavite 2nd DEO | Completed | ₱14.5M | 100% | Medium risk46 | —-0.106 |
| 34 | 23DG0003REHAB OF PAVED ROAD-TAGAYTAY-TALISAY RD-K0061+0050-K0061+395 | Region IV-A | Cavite 2nd DEO | Completed | ₱8.2M | 100% | Medium risk46 | —-0.109 |
| 35 | 24DG0106CONST OF 2STOREY BLDG WITH 4CL @ ANULING E/S @ BRGY ANULIN GCERCA I, MENDEZ NUÑEZ, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱16.7M | 100% | Medium risk46 | —-0.056 |
| 36 | 25DG0019CONST. OF FLOOD CONTROL STRUCTURE, RED BRIDGE, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱26.5M | 90% | Medium risk46 | —-0.048 |
| 37 | 22DG0017CONST OF DRAINAGE STRUCTURE ALONG ROAD-TAG-TAAL LAKE ROAD K0058+300-K0058+700 | Region IV-A | Cavite 2nd DEO | Completed | ₱7.1M | 100% | Medium risk46 | —-0.105 |
| 38 | 25DG0035INST./APPLICATION OF ROAD SAFETY FACILITIES(ROADWAY LIGHTING) ALONG TA.-BATS VIA TUY RD. -K0059-918- | Region IV-A | Cavite 2nd DEO | On-Going | ₱7.6M | 100% | Medium risk46 | —-0.079 |
| 39 | 24DG0023CONST OF ROAD SLOPE PROTECTION STRUCTURE-JUANITO R. REMULLA SR RD-K0061+831-K0061+853 | Region IV-A | Cavite 2nd DEO | Completed | ₱11.2M | 100% | Medium risk46 | —-0.104 |
| 40 | 23DG0076OPENING & CONC OR BRGY PANUNGYAN I, FMR, BRGY PANUGYAN I, MENDEZ, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱11.6M | 100% | Medium risk43 | —-0.053 |
| 41 | 24DG0104CONCRETING OF BRGY UPLI FMR, BRGY UPLI, ALFONSO, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱5M | 97% | Medium risk42 | —-0.013 |
| 42 | 25DG0028INST./APP. OF RD. SAFETY FACILITIES ALONG JUANITO R. REMULLA SR. RD.-K0068+180-K0068+673 | Region IV-A | Cavite 2nd DEO | On-Going | ₱2.5M | 100% | Low risk25 | —-0.073 |
| 43 | 24DG0028CONST OF ROAD SLOPE PROTECTION STRUCTURE-ISAAC O. TOLENTINO AVE K0063+687-K0063+703 | Region IV-A | Cavite 2nd DEO | Completed | ₱4.3M | 100% | Low risk25 | —-0.105 |
| 44 | 24DG0027CONST OF ROAD SLOPE PROTECTION STRUCTURE-ISAAC O. TOLENTINO AVE. K0063+620-K0063+637 | Region IV-A | Cavite 2nd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.104 |
| 45 | 24DG0026CONST OF RD SLOPE PROTECTION STRUCT-ISAAC O. TOLENTINO AVE.-K0063+213-K0063+228 | Region IV-A | Cavite 2nd DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.104 |
| 46 | 24DG0057SPECIAL ROAD FUND-INST OF RD SAFETY DEV ALONG ISAAC O.TOLENTINO AVE-K0057+(-1057)-K0057+000,TAG CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱2.2M | 100% | Low risk23 | —-0.102 |
| 47 | 24DG0058SRF-MVUC AS PER RA11239-INSTALLATION OF ROAD SAFETY DEVICES ALONG TAG-MLA VIA SILANG RD, TAG CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱1.7M | 100% | Low risk19 | —-0.102 |