Opening the dossier…
Opening the dossier…
Contractor dossier
87 projects on file, including joint ventures this contractor is part of.
Total projects
87
Total budget
₱3.5B
Average progress
99.2%
Completion rate
83.9%
Average risk score
56.2
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 44 | ₱1.7B | 56.3 | 0 | 99.6% |
| Flood Control and Drainage | 29 | ₱1.7B | 58.5 | 0 | 99.4% |
| Buildings and Facilities | 10 | ₱68.5M | 41.5 | 0 | 99.3% |
| GAA 2025 SSP | 2 | ₱9.9M | 86.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱54.9M | 91.0 | 0 | 74.5% |
| Water Provision and Storage | 1 | ₱3.3M | 39.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KH0016CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN DE ORO RIVER, LUMBIA-UGUIABAN BY-PASS RD., SECTION 3, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱54.9M | 75% | High risk91 | —-0.016 |
| 25KL0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk88 | —-0.031 |
| 25KL0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAMBOBOAN, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.031 |
| 23F00122CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIGAO CITY, ALBAY, PHASE II, LIGAO CITY, | Region V | Region V | Completed | ₱192.9M | 100% | High risk73 | —-0.056 |
| 23F00135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.079 |
| 23F00064OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.080 |
| 24FO0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BASAG RIVER CONTROL STRUCTURE, UPSTREAM OF SPILLWAY, BA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FO0038ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BASAG RIVER (UPSTREA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FO0056ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UGSONG RIVER FLOOD CONTROL STRUCTURE (LEFT AND RIGHT | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FE0023CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES | Region V | Camarines Sur 2nd DEO | On-Going | ₱138.5M | 100% | High risk68 | —-0.050 |
| 24FN0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BARIT RIVER, SANTA JUSTINA SECTION, BARANGAY SANTA JUSTINA, BUHI, CAM SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 24FN0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, SALVACION SECTION, BARANGAY SALVACION, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 20FM0001ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SAN PASCUAL - CLAVERIA ROAD, SAN PASCUAL, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.065 |
| 22FM0004ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - SAN FERNANDO-TALISAY ROAD - K0003+065 - K0003+209. | Region V | Masbate 1st DEO | Completed | ₱77.2M | 100% | High risk64 | —-0.091 |
| 20FM0044LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0003+377 - K0003+530), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 20FM0046LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+927 - K0003+065), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 20FM0045LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+790 - K0002+927), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20FM0029NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - POBLACION - QUINTINA, SAN PASCUAL ROAD. | Region V | Masbate 1st DEO | Completed | ₱46.8M | 100% | Medium risk59 | —-0.099 |
| 27 | 22FB0007SIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF TUMPA FLOOD CONTROL DIKE, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.088 |
| 28 | 22FB0111SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SUHA FLOOD CONTROL DIKE, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱49M | 100% | Medium risk58 | —-0.088 |
| 29 | 22FB0083SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES REHABILITATION OF BALIGANG RIVER WALL, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱24.5M | 100% | Medium risk58 | —-0.087 |
| 30 | 19FM0017OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/ CONSTRUCTION - ON SPECIFIC LOCATIONS ALONG SAN PASCUAL-CLAVERIA ROAD (S00006BU). | Region V | Masbate 1st DEO | Completed | ₱42.4M | 100% | Medium risk58 | —-0.098 |
| 31 | 23FM0002NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - POBLACION-QUINTINA ROAD, SAN PASCUAL ROAD, PACKAGE 3, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱34.3M | 100% | Medium risk58 | —-0.099 |
| 32 | 22FM0020NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - POBLACION - QUINTINA ROAD (PACKAGE 2), MASBATE. | Region V | Masbate 1st DEO | Completed | ₱37.2M | 100% | Medium risk58 | —-0.099 |
| 33 | 22FM0021NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS -TERTIARY ROADS- SAN PASCUAL - CLAVERIA ROAD- K0012+478-K0012+850, K0017+041-K0018+042. | Region V | Masbate 1st DEO | Completed | ₱29.4M | 100% | Medium risk58 | —-0.100 |
| 34 | 22FB0016SIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF SALUGAN RIVER WALL, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱24.5M | 100% | Medium risk58 | —-0.086 |
| 35 | 22FB0015SIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF QUIRANGAY RIVER WALL, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱24.5M | 100% | Medium risk58 | —-0.088 |
| 36 | 19FM0023OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/ CONSTRUCTION - ON SPECIFIC LOCATIONS ALONG SAN PASCUAL - CLAVERIA ROAD (S00004BU). | Region V | Masbate 1st DEO | Completed | ₱30.4M | 100% | Medium risk58 | —-0.098 |
| 37 | 19FM0024OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING /CONSTRUCTION - ON SPECIFIC LOCATIONS ALONG SAN PASCUAL - CLAVERIA ROAD (S00005BU). | Region V | Masbate 1st DEO | Completed | ₱47.4M | 100% | Medium risk57 | —-0.099 |
| 38 | 25FO0012ORGANIZATIONAL OUTCOME 2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF SLOPE PROTECTION WORKS, HIBIGA RIS, POLANGUI, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱9.4M | 100% | Medium risk57 | —-0.058 |
| 39 | 20FM0030NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - CLAVERIA - SAN ISIDRO - PEÑAFRANCIA ROAD. | Region V | Masbate 1st DEO | Completed | ₱46.8M | 100% | Medium risk57 | —-0.099 |
| 40 | 22FB0097SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES REHABILITATION OF IT-BA RIVER WALL, MANITO, ALBAY | Region V | Albay 2nd DEO | Completed | ₱24.5M | 100% | Medium risk57 | —-0.087 |
| 41 | 23FM0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD - JUNCTION NATIONAL ROAD, SITIO MAPUTAP - SITIO KILAPAD, POBLACION 2, CLAVERIA, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱49.5M | 100% | Medium risk57 | —-0.097 |
| 42 | 18FM0031CONCRETING OF MABINI ROAD - PHASE II. | Region V | Masbate 1st DEO | Completed | ₱28.5M | 100% | Medium risk57 | —-0.044 |
| 43 | 22FM0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION OF ROAD ALONG POBLACION-QUINTINA ROAD, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱27.9M | 100% | Medium risk56 | —-0.100 |
| 44 | 21FM0022NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - POBLACION - QUINTINA ROAD (PACKAGE 1). | Region V | Masbate 1st DEO | Completed | ₱23.5M | 100% | Medium risk56 | —-0.100 |
| 45 | 19FM0019CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ON SPECIFIC LOCATIONS ALONG SAN PASCUAL-CLAVERIA ROAD (S00006BU). | Region V | Masbate 1st DEO | Completed | ₱22.2M | 100% | Medium risk56 | —-0.098 |
| 46 | 22FM0019NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - CLAVERIA - SAN ISIDRO - PEÑAFRANCIA ROAD, PACKAGE 2, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱49M | 100% | Medium risk56 | —-0.099 |
| 47 | 24FM0004NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CLAVERIA-SAN ISIDRO-PEÑAFRANCIA ROAD (PACKAGE 4), CLAVERIA, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱49M | 100% | Medium risk56 | —-0.099 |
| 48 | 20FM0026LOCAL PROGRAM - CONSTRUCTION OF ROAD, BRGY. SAN RAFAEL, BRGY. SAN RAFAEL, SAN PASCUAL, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱19.8M | 100% | Medium risk56 | —-0.100 |
| 49 | 23FM0004NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - CLAVERIA-SAN ISIDRO-PEÑAFRANCIA ROAD, PACKAGE 3, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱34.3M | 100% | Medium risk56 | —-0.099 |
| 50 | 20FM0003ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - SAN PASCUAL - CLAVERIA ROAD, SAN PASCUAL, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱27.6M | 100% | Medium risk56 | —-0.099 |